Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s.

Slides:



Advertisements
Similar presentations
Series L Air conditioners for Laboratories.
Advertisements

Heating, Ventilating, and Air-Conditioning
Objectives Control Terminology Types of controllers –Differences Controls in the real world –Problems –Response time vs. stability.
IT-3872 Refurbishment of the piping of the chilled water circuit of the Proton Synchrotron Alexandre Broche EN-CV-PJ.
PLANT HVAC SYSTEMS DU-109-PP PLANT HVAC SYSTEMS.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
RETROCOMMISSIONING AIR HANDLING SYSTEMS
Energy Management with the use of an Intelligent Building Management System.
DO-29161/EN Provision of Engineering Services in Heating, Ventilation and Air Conditioning for Building 107 Project R. Bozzi, M. Nonis / EN-CV.
BIDDERS’ CONFERENCE IT-3980 Replacement and Supply of Electrical Overhead Travelling Cranes up to 10 Tons Capacity March 20th 2014 Handling Engineering.
Air Handling Systems Heating Ventilation and Air Conditioning (HVAC) Part 2: Components Supplementary Training Modules on GMP Module 3, Part 2: Components.
Lecture Objectives: Model HVAC Systems –HW3 Asignemnet Learn about eQUEST software –How to conduct parametric analysis of building envelope.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Value Engineering Session Air Treatment / HVAC November 27, 2007 Lee Hammond, FNAL CFS.
Equation solvers Matlab Free versions / open source codes: –Scilab MathCad: Mathematica:
HVACR116 – Trade Skills Mechanical Drawings.
Paolo Guglielmini TS / CV / DC08th April 2005 BIDDERS’ CONFERENCE Invitation to Tender 3307 Supply and Installation of water cooling equipment for the.
Technical Specification April 23rd-24th 2013Handling Engineering Group1  Technical documents during tender  Contract execution  Documents during contract.
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
World Health Organization
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
IT-4103/EN Bidder’s conference Technical Specification for the Design, Supply, Installation and Commissioning of an HVAC system, a Smoke Extraction system.
World Health Organization
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
IT-4082 Design, Supply, Installation and Commissioning of the ventilation of the BAF3 building Alexandre Broche EN-CV-PJ.
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
N-TOF review HVAC and cooling systems YB-JIG 15/06/07.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
Thermosiphon quality management and documentation EN/CV/DC Presentation done by Elena Perez Rodriguez For further information contact
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
Energy Plus & Open Studio Class
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Engineering Department EN 1 IT3853-EN Design, Supply of Ventilation Units and Smoke Extraction Systems for Building 192 Bidder’s conference – 29 th April.
Energy Savings in CERN’s Main Data Centre
For more information, please contact 14/12/2010 EN/CV/DC Technical specification IT-3684 by Elena Perez Rodriguez.
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
Fire Recovery Facilities –Physics Computing Services is finally able to relocate back into 1301 as of this week. They will probably be completely off of.
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
IT-4014/EN/NA62 Technical Specification Dismantling, Design, Supply and Installation of a Ventilation and Air Conditioning System for ECN3, TCC8 and GHN300.
IT-3963/EN Bidder’s conference Design, supply, installation and commissioning of the cooling system for the NA62 Gigatracker Tuesday 10 December 2013 Building.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
N-TOF review HVAC and cooling systems Proposal to be validated by the project CERN TS/CV 13th February 2008.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
Technical Review EHN1 Extension Cooling Systems and Pipework Jérôme Rodary / EN-CV.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
IT-4142/EN Supply, Installation, Testing and Commissioning of the HVAC System for the New Building 107 Technical Specification M. Battistin, M. Nonis /
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
IT-4135/EN Supply of Air Handling Units for Industrial HVAC Projects at CERN Technical Specification Paul Pepinster / EN-CV.
CFS EDR KICK OFF MEETING Air Treatment August 23, 2007 Lee Hammond, FNAL CFS.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Demineralised water cooling system
SR1 extension follow up 27-Mar-17 Marco Ciapetti.
IT-4189 Supply and installation of a cryogenic distribution system
ZONING (see section 17.0) Zoning alternatives Constant Volume (CV)
Building 107 Update Introduction Project team Location Design status
Heating, Ventilating, and Air Conditioning
Bidder’s conference – 21st May 2013
COOLING & VENTILATION INFRASTRUCTURE
Lecture Objectives: Answer questions related to HW 4
Extension SR1 WP3 Electrical installations
Low temperature chiller Market Survey
Heating, Ventilating, and Air-Conditioning
Documentation Chris Scanlon and Ritendra Bhattacharya
Receiving Inspection on incoming goods
Objective Revie the Cooling Cycle Learn about air distribution systems
Presentation transcript:

Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s conference – 28 th November 2014 Y. Body / EN-CV

Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN

Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN

Engineering Department ENEN ENEN INTRODUCTION: CERN

Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN

Engineering Department ENEN ENEN INTRODUCTION: SR8 Facility

Engineering Department ENEN ENEN INTRODUCTION: SR8 Facility

Engineering Department ENEN ENEN INTRODUCTION: SR8 Facility R-401R-402 R-403

Engineering Department ENEN ENEN INTRODUCTION: SR8 Facility – Former ventilation system

Engineering Department ENEN ENEN INTRODUCTION: SR8 Facility – Former ventilation system

Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN

Engineering Department ENEN ENEN Two AHUs: one in R-401 and one in R-403 R-402 Alcove used for decompression R-403 R-401 R-403 NEW VENTILATION SYSTEM R-402

Engineering Department ENEN ENEN Two AHUs: one in R-401 and one in R-403 R-402 Alcove used for decompression NEW VENTILATION SYSTEM

Engineering Department ENEN ENEN R-401, R-403 alcoves Air Handling Unit Sepcial shape part between AHU and mixing chamber including the air tight access door Return air grille (UQGN) Fresh air intake (UQCF) Fresh air damper (UVUM) Return air damper (UVUM) Pre-filtration (UFPZ) NEW VENTILATION SYSTEM

Engineering Department ENEN ENEN R-402 alcove Exhaust air grille (UQCF) Exhaust air grille (UQGA) Exhaust air dampers (UVUM) Opening closure NEW VENTILATION SYSTEM

Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN

Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Items supplied by CERN CERN will provide the control software based on the I/O list and functional analysis provided by the Contractor

Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Design criteria and conditions

Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Applicable Standards, Rules, Regulations

Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Applicable Standards, Rules, Regulations Halogen forbiden Possible derogation for very small parts AHUs: total amount of halogeneted material to be indicated in the tender

Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Responsibility for the Design

Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Documentation Including power and control cubicles schematics

Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Documentation

Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Documentation

Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Delivery schedule

Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Tests 1. I/O testing with basic PLC standard software suite (done by the Contractor) Power available in the cubicles and all equipment cabled to the PLCs Supplier able to charge the basic PLC configuration and test all I/Os from within the software 2. I/O testing with CERN software (done by CERN with presence of Contractor) Test report from phase one validated by CERN Setup of instrumentation is finished (scaling of analog probes, pressostats, …) All hardware responding to commands Contractor able to force all I/Os electrically 3. Functional testing with CERN software (done by CERN with presence of Contractor) All hardware and instrumentation operating according to specifications (failsafe positions on dampers, electrical equipment protections all working, etc) Ability to run the units and test regulation loops 4. Commissioning (done by CERN with the presence of Contractor) Installation able to work at the design envelope conditions (nominal flow and power, …)

Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN

Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 1 – Panel of the AHUs

Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 1 – Measuring section

Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 1 – Electrical heaters

Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 1 – Chilled water coils Copper pipe with a thickness of 0.89mm allowed Given the existing room dimensions, higher air velocity allowed (<3m/s)

Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE PLAN

Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 2 – Instrumentation

Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE PLAN

Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 3 – Electricity

Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN

Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 4 – Identification

Engineering Department ENEN ENEN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN

Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 5 – Tests and Inspection performed on Contractor’s Premises As per section of the Technical Specification

Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN

Engineering Department ENEN ENEN Thank you for your attention!