MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

MICE CM31 wrap-up Alain Blondel 1 MICE CM31 Wrap-up 1.The good news 2.The achievements and decisions made 3.The questions 4.Looking forward to MICE CM32.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
Downstream PID Review Alan Bross MICE CM 16 October 8, 2006.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
MICE - UK Project Progress Roy Preece 30 th April 2013.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
MICE CM39 Alain Blondel CB report 1 Report from the MICE collaboration board.
K. Long, 2 December 2014 Spokesman’s update 1. Contents: Update Step IV – Installation and commissioning – Preparations for data taking Shift tool; CHEESE.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
1 MICE CM32 Summary Scheduling and planning; aims for this year Schedule update Main schedule drivers Keeping us on schedule Comment on Steps V & VI Detail.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM28.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
Project manager report paul drumm CM16 October 2006.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Executive Board Meeting Roy Preece 23rd May 2014
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Spectrometer solenoid 2. Magnetic shielding 3. Next Collaboration meeting.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
MICE VC Alain Blondel 30 August MICE VC 103 MICE news -- see Malcolm's news for an inventory. -- great funding news all summer from USA! (phase.
MICE VC 10-Oct-2013 Alain Blondel 1 MICE NEWS VC 162 LOTS OF THINGS HAPPENED! have arrived at RAL: -- EMR (see report today) -- AFC2 see pictures -- SS2.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
MICE CM 29 Collaboration Board Summary. Agenda 1.Intro 2.Approval of minutesBooth/Bross 3.Spokeʼs remarks & EB reportBlondel 4.PM reportNichols 5.US magnet.
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting CM36 will be Jun at IIT and the 19th at Fermilab right before.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE CM32 Goals of the Meeting Alain Blondel 1 WELCOME TO MICE CM32! – Goals and Status - Many thanks to Victoria Blackmore, Stefania Ricciardi and Mary-Elizabeth.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
MICE CM33 – system test? Alain Blondel 1 CM 33 wrap-up TOWARDS CM34.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
Coney - CM36 - June Online Overview L. Coney – UCR MICE CM36 – June 2013.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
MICE RLSR – 13Nov2013 Alain Blondel 1 MICE Project Board 14 November 2013 Alain Blondel.
MICE CM34 Wrap-up Alain Blondel 1 CM 34 wrap-up TOWARDS CM35.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
UK Financial Plan & Risks
MICE CM31 Schedule summary
MICE NEWS MICE VC 155 Next Collaboration meeting will be
Presentation transcript:

MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking care of logistics and preparing the agenda! and to Alan Bross for preparing the wrap up!

MICE CM35 Status and Goals Alain Blondel 2 Aim : review where we stand with progress 1.Schedule 2.Actions

MICE CM35 Status and Goals Alain Blondel 3 We had a MICE board marathon in the fall 31 October MICE project board (MPB) 5 November MICE-UK Oversight committee 12 November MICE Funding agency committee (FAC) The presentations at the MICE Project Board can be found from the MICE web site as well as the report from MICE to questions asked by the board MICE notes In the following are a few excerpts from the Board report NB next FAC 8 May 2013, MPB penciled on 24 April format maybe modified or merged

MICE CM35 Status and Goals Alain Blondel 4 DOE Well known CERN retired magnet expert ATLAS STFC expert, project management Fermilab RAL Our STFC program officer leads accelerator group at ESS (Lund)

MICE CM35 Status and Goals Alain Blondel 5

6 RF system:

MICE CM35 Status and Goals Alain Blondel 7 NB next FAC 8 May 2013, MPB penciled 24 April

MICE CM35 Status and Goals Alain Blondel 8 we will review the situation at CM 35 in February Going ahead with preparations default solution = Global while continuing design of ‘return yoke’ solution In general MPB was very supportive. They appreciate very well the relationship between stretched funding and probability of delays. This give us plenty of home work!

MICE CM35 Status and Goals Alain Blondel  Provisional MICE SCHEDULE update: October 2012 STEP I STEP IV Q till Q STEP VI Run date: EMR run Q Under construction: NB: target date Q Step V run possible Q year + 2 years

MICE CM35 Status and Goals Alain Blondel 10 In the middle of the bridge at The Cosener’s House: MICE STEP I MICE STEP IV This way, please

MICE CM35 Status and Goals Alain Blondel 11 MICE keeping the eyes on the ball

MICE CM35 Status and Goals Alain Blondel 12 (expected) Highlights of CM35 RAL February TOWARDS STEPIV: -- SS1 ~fully trained at LBNL -- AFC working and measured in R9 -- magnetic field protection scheme well advanced -- use of plant room clarified -- questions regarding tracker shielding solved -- engineering solution for Flux return solution -- EMR complete, running on cosmics at UNIGE and preparing for shipping -- reconstruction, analysis and online software -- elog! TOWARDS PUBLICATIONS -- Emittance paper final -- PID paper final (requires KL reconstructioon included in MAUS) -- step IV apparatus paper started TOWARDS STEPVI -- test of Coupling Coil 1 underway and almost complete -- RF group progress (2MW?)

MICE CM35 Status and Goals Alain Blondel 13 ELOG progress local MICE page last night we did a successful activation run

MICE CM35 Status and Goals Alain Blondel 14 new! tabs for different streams of information (much better than categories)

MICE CM35 Status and Goals Alain Blondel 15 every MICE can follow what happens in California Pierrick, Linda and Steve V. are out there testing SS1 Happy Valentine Linda!

MICE CM35 Status and Goals Alain Blondel 16

MICE CM35 Status and Goals Alain Blondel 17 MICE Schedule meeting yesterday 13Feb 2013 MICE step IV installation complete 19 May 2014 two weeks gained wrt last time (field mapping streamlined) this would give 2 ISIS user runs for step IV before the shut down wonderful…. BUT schedule does not include field mitigation actions which is the ELEPHANT in the Hall. Discussion this afternoon

MICE CM35 Status and Goals Alain Blondel 18 Magnetic field mitigation Discussion this afternoon: -- review the options 1- relocate equipment that needs to avoid magnetic field of the experiment as is there has been great progress as far as space available is concerned  1. can this work for step IV ? 2. can this work for step VI ? 3. schedule implications 2- modify experiment by implementation of a return yoke Also great progress achieved! 1. do we need this for step IV ? 2. do we need this for step VI ? 3. schedule implications -- recommend an action course We would like to come out of this meeting with a clear and agreed path

MICE CM35 Status and Goals Alain Blondel MLCR & Rack Room #2 Extended MLCR Existing locker room = Rack Room #2 2D Layout from John Webb ISIS Plant room door move (position TBD) Toilets will be removed for new ISIS switchgear (2014) New access doors Cables routed under stairs with access via Rack Room #2 (volume to be fireproofed) Existing rack room = Rack Room #1 Cables routed under false floor then into Hall (not an insignificant task!) ISIS switchgear J. Tarrant

MICE CM35 Status and Goals Alain Blondel 20

MICE CM35 Status and Goals Alain Blondel 21 Let’s have a productive meeting!