On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.

Slides:



Advertisements
Similar presentations
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Advertisements

2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
ECAL status Outline: Signal cable connectors quality check results: –ADC side –PM side ECAL PM/C-W channels commissioning status Access activities Further.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
MUON piquet report 18/9 -24/ Nikolai Bondar.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
UF-PNPI HV system upgrade Presented by N. Bondar. CERN  Part 1. HV System migration to USB interface  Part 2. HV System proposal of Stage 2.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
ECAL Monitoring System Ivan Korolko (ITEP Moscow) PRR, September 2004.
Monitoring system of the LHCb electromagnetic calorimeter NEC’2007, Varna, Bulgaria Ivan Korolko (ITEP Moscow)
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
String-18 New-DAQ Commissioning Azriel Goldschmidt AMANDA Collaboration Meeting Berkeley, March 2002.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
ECAL status and plans  Current status and problems  Recent activities:  C-W noise studies summary;  Lab measurements of LED Monitoring system performance;
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
STATUS OF HO Sudhakar Katta TIFR, Mumbai India-CMS meeting, Delhi 27 th Sept 2007.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
1 BNL report ~ the history of Run7 start up ~ Yoshihide Nakamiya.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
Calo preparation for 2015 Goals: -Trigger stability -Good calibration for HLT2 processing -Improved calibration ( timing, e/gamma response) for all calo.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED News New LED scan and stability data for ECAL were.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
1 LHCb meeting Anatoli Konoplyannikov Introduction Which HV to be set before beam will come? Needed Constants PVSS data point type (DPT) format.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Chronology - I  Year Jan. 2008: from time to time short circuits failures in chains supplying low voltage to C-W bases (either +6V or -6V, ~5 lines.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Sept 03:  About ~80 patches are installed, all in the periphery of Outer section:  C-side: voltage control / distribution boxes 1, 2, 3, 4, 8, 9 (partially)
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
June 30th 2008Jacques Lefrancois1 CW base studies Last week June 24th at calo meeting : news that preliminary test done by Yuri Gilitski indicated that.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
 94 LVPS Packages mounted 4’-25’ from the front-end electronics.  4 modules per package. u +5V& -5V “Digital”, +5V & -5V “Analog” 18 A 1A 18A 18Amps.
ECAL status and plans C-side A-side Further plans People involved: Alexander Arefiev, Boris Bobchenko, Yury Gilitskiy, Tengiz Kvaratskheliya, Irina Machikhiliyan,
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
E.Guschin (INR,Moscow) 12 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Done: All final cabling, except rearrangement.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 01/19/2009.
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
Pre-calibration of PM gain by photo-statistics
BESIII EMC electronics
Development of hybrid photomultiplier for Hyper-Kamiokande
Presentation transcript:

On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev ECAL: status and plans Irina Machikhiliyan, Outline:  A-side  C-side  Lab activities  Further plans

ECAL A-side Irina Machikhiliyan,  C-W modification is almost finished:  Outer / Middle region are done;  Few boxes are still missing in the Inner section; Is it possible to start the installation this week in order to start the commissioning in the end of the next week / beginning of the week after the next?  Last week: installation and check of the HV-boxes system:  Successfully passed test procedure  For a moment is disconnected from power supplies (safety for the future installation of PM/C-W) Green: ready for installation; White: to be done;

Commissioning of the ECAL C-side Irina Machikhiliyan, Took place in the week of 2 – 8 Feb Reference data samples: #43821 PM HV nominal, LED LV = (nominal + 1V), 1K of 5 TAE events, LED trigger rate 56 Hz (taken ) #43822 PM HV nominal, LED LV nominal, 1K of 5 TAE events, LED trigger rate 56 Hz (taken ) #43815 PM HV nominal, LED LV nominal, ~52.5K of events, LED trigger rate 3 Hz, 5 TAE events (almost 5 hours stability run, taken )

Irina Machikhiliyan, Test program: -Check of the functionality of PMs / LEDs: several cables were not plugged, fixed; 5 doublets PM/C-W showed small C-W noise tails, replaced; -Connectivity test (swapped cables): some swapped control cabling in the Inner section, fixed; -Pulser test to check connectors quality (thanks to Jacques): 3 connectors on signal cables on PM side, replaced; -Adjustment of integrators; -Update of connectivity in Database; -~5 hours stability measurements; Remaining problems / tasks:  Cells O 15/37(09/11/31) and M 01/29 (11/08/09) – problem on FEB side according to pulser test (Jacques knows);  Couple of cells showed instability: to be watched further to understand the reason;  One LED (C1.16.1) is unstable (problems is known since the last year, LED driver will be replaced); For a moment:  LED intensities are not optimally adjusted. It does not make sense to do it now: they will be tuned after the calibration of PM gains will be done;  PIN system functionality is not yet checked. To be done (data are collected, to be analyzed); Commissioning of the ECAL C-side

Irina Machikhiliyan, r.m.s. of pedestal distribution Relative signal deviation, 4.8 hours Relative signal deviation, ~4 hours Response on LED, nominal settings; (!) 7 cells: amplitude is below 150 counts (!)

Irina Machikhiliyan,  Equipment used:  High voltage probe TENMA FLUKE 45 MULTIMETER  Both checked with NIM Power Supplies - N470 in the range of output voltages 0÷1.3kV: accuracy of the measurement is on the level of 0.1%  Measurement conditions:  14 C-W bases of HCAL_mc design  10 C-W bases of ECAL_mc design  PM control voltage is in the range 0÷3.8 V  Medium voltage setting +96V Lab measurements: final dependence of output C-W HV on the control voltage

Irina Machikhiliyan, Lab measurements: comparison of designs HCAL_mcECAL_mc No difference between HCAL_mc and ECAL_mc was observed except for the first point

Irina Machikhiliyan, Lab measurements: final dependence of output C-W HV on the control voltage HCAL_mc+ ECAL_mc The final formula is: HV(V) = *Vctrl (V) For Vctrl ~ 3.5V medium voltage setting must be +90V +80V is not enough for “cosmics”

Irina Machikhiliyan, Lab measurements: reproducibility of output HV over different C-W In the ECAL operating range (~1 ÷ 2V of Vctrl): < 0.5% in HV or <3.2% in gain Contribution from HV-box (r.m.s. of Vctrl): < 0.36% in Vctrl or < 2.3% in gain In the ECAL operating range: < 1.6% in HV or <10.2% in gain These numbers define the precision of the calibration which can be achieved by “hardware” methods α (HAMAMATSU) r.m.s., VoltsMax spread, Volts

Further plans Irina Machikhiliyan,  This / next week: installation of PM/C-W on A- side;  Until mid. of March: A-side PM/C-W commissioning;  Starting from second half of March: (a)In the lab: modification of spare C-W + repair; (b)On ECAL detector: calibration of PM gain by photo-statistics; adjustment of LED intensities; etc;