SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.

Slides:



Advertisements
Similar presentations
Early Results from the COS Time-Dependent Spectroscopic Sensitivity Programs Rachel Osten TIPS presentation, Jan. 21, 2010.
Advertisements

SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
Spectral Characterization of calibration lamps: STIS An improved list of emission lines for STIS Calibration Enhancement Florian Kerber, ST-ECF TIPS Meeting.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS Update The NUV Gratings 18 October 2007 Last COS TIPS presentation: 21 December.
Initial Alignment Check / Calibration in Vacuum Dennis Ebbets With substantial contributions from Tom Delker, Erik Wilkinson, Steve Osterman, Ken Brownsberger,
1 TIPS 4/18/2013 Status of JWST/ISIM Test Program Scott Friedman TIPS/JIM April 18, 2013.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 21 August 2001.
November 7, Transition Planning 1.Purpose & Scope 2.Phase List 3.Key Assumptions 4.Transition – Phase by Phase.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
MASSACHUSETTS INSTITUTE OF TECHNOLOGY NASA GODDARD SPACE FLIGHT CENTER ORBITAL SCIENCES CORPORATION NASA AMES RESEARCH CENTER SPACE TELESCOPE SCIENCE INSTITUTE.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS TV Update 21 December 2006 Agenda Agenda Testing Setup and Status Testing Setup.
Cosmic Origins Spectrograph Hubble Space Telescope James C. Green University of Colorado Cosmic Origins Spectrograph Instrument Design and Capabilities.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
TIPS Meeting 1.Observing Solar System Objects with JWST Ed Nelan 2.COS - Updates on COS DevelopmentKen Sembach 3.NICMOS StatusTommy Wiklind Next TIPS Meeting.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS TAGFLASH System Requirements Review COS Lamp Lifetime Estimates for TAGFLASH Scenarios.
Keyes - 5 Mar 2001 Slide 1 of 16 COS Science Team Meeting – STScI Status  STScI Integrated Scheduling System Development – TIME-TAG (primary science mode)
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 20 October 1999.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
COS PIPELINE PDR Daryl Swade December 7, 2000OPUS / OTFR Space Telescope Science Institute 1 of 24 Science Data Processing
HST Quarterly Review Page 1 Space Telescope Science Institute 12 February 2004 SI Status: COS STScI Support of COS Thermal-Vacuum Testing COS Thermal-Vacuum.
18 May 2006 Slide 1 of 10 STScI TAGFLASH Ground System Development Current ground system could support immediate COS launch Current ground system could.
Figure 8.Color map of the geometric correction along the dispersion axis for segment A. Figure 4. Measured distortions for all PSA positions for segment.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
TIPS COS Overview - Keyes : 18 May 2000 COS Overview v CDR: April 2000 v FUV delivery: January 2001 v Environmental (Thermal-Vac): spring 2002 v Launch:
Selection of the New COS/FUV Lifetime Position Cristina Oliveira Jan TIPS Meeting - COS/FUV Lifetime1.
1-D Flat Fields for COS G130M and G160M Tom Ake TIPS 17 June 2010.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 18 January 2007.
Cosmic Origins Spectrograph
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Calibration Goals of CALCOS Association Table Input and Output Files High Level.
GERB 4 Instrument Status GIST 25 23rd October 2006 Presenter: N Morris.
1 Space Telescope Science Institute JWST S&OC JWST S&OC Contract Peter Stockman TIPS March 20, 2003.
TIPS COS Status: SMOV update III STScI/CU COS Team 17 September 2009.
COS Training Series II. Optimizing Observations --- David Sahnow February mm.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Status STIC 13 February 2001.
"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 1 -UVIS.
Jan 15, 2004WFC3 TIPS – John W. MacKenty1 WFC3 TIPS Presentation January 15, 2004 Optical Stimulus.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
Slide 1 of 5 COS Monthly Status Review David Soderblom STScI
COS PIPELINE CDR Jim Rose July 23, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 12 Science Data Processing
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 1 of 8 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA 5 th COS/WFC3.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
The Status of HST/COS and HST/STIS Cristina Oliveira 8/12/14COS and STIS Cal Workshop1 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA.
WFC3 PIPELINE CDR Jim Rose October 16, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 13 Science Data Processing
HST Quarterly Review Page 1 Space Telescope Science Institute 15 October 2003 SI Status: COS STScI COS Program Activity SubprojectSTScI Activity Instrument.
WFC3 SMOV Report for TIPS 16 July 2009 John MacKenty This presentation contains material that is embargoed until after the SM4 ERO press conference. Images/spectra.
23-Nov-1999STScI Projects Monthly Status Review1 of 8 SpaceTelescopeScienceInstitute COS Status Report for period December, 1998 to November, 1999 Tony.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 17 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 September 1999.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002.
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003.
STIS Status TIPS, September 17, 2009 Charles Proffitt for the STIS team.
1 COS SI Testing and Delivery SI formally delivered to HSTP in May  N 2 purge alignment and NUV throughput testing pre- and post-ship  No effective alignment.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS Cosmic Origins Spectrograph 20 September 2001.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph HST Quarterly Review – Instrument Status Charles D. (Tony) Keyes.
Cosmic Origins Spectrograph Monthly Status Review 17 April 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
Cosmic Origins Spectrograph Monthly Status Review 19 June 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 27 June 2002.
JWST Pipeline Overview
Characterization of the Post-Launch Line Spread Function of COS
Single Object & Time Series Spectroscopy with JWST NIRCam
JWST NIRCam Time Series Observations
COS FUV Flat Fields and Signal-to-Noise Characteristics
Calibration of the Cosmic Origins Spectrograph
STScI Ground System Development Status:
TEMPO Instrument Update
Presentation transcript:

SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated SI (Aft End)

Sembach 2 of 21 TIPS - 21 August 2003 COS Timeline Summary Instrument integration activities (Jan-Mar 2003) –Calibration platform installed, electronics, enclosure, etc –FUV02 (flight spare) detector qualifications completed FUV detector swap and alignment (March-April 2003) –FUV02 performance better at longer ; “flatter” throughput –Alignment checked under N 2 purge with CAOS/HOMS Environmental tests of integrated instrument (April 2003) –GSFC: EMI/EMC, acoustics, vibration, metrology Initial thermal balance, alignment, and testing in vacuum completed in July 2003 –To confirm focus/spectral resolution/throughput/operations

Sembach 3 of 21 TIPS - 21 August 2003 COS Timeline Summary (con’t) Instrument currently out of vacuum chamber at Ball –Working issues discovered during initial testing T-Vac activities to begin September 11 Science calibration to occur September 18 - October 12 Delivery to GSFC expected in late October 2003 Integrated pipeline testing in May 2004 SMGT planned for late July 2004 Working to launch date of May 2005

Sembach 4 of 21 TIPS - 21 August 2003 COS: pre-acoustic test; packing for return to Ball

Sembach 5 of 21 TIPS - 21 August 2003 COS Integrated SI and Enclosure

Sembach 6 of 21 TIPS - 21 August 2003 COS Issues of Interest Spectra in Bright Object Aperture (BOA) have coma –ND2 filter (2 mm cube) has 0.25 o wedge –Resolution degraded by factor of ~4 in NUV, less in FUV –No serious science impact Spectral lines sometimes found to be “tilted” under N 2 purge in CAOS/HOMS after FUV02 detector swap –Time variable, observed for FUV external lamp spectra –Most likely related to failing PtNe calibration lamp –Not seen after new lamp installed or in later vacuum tests

Sembach 7 of 21 TIPS - 21 August 2003 Removal of COS from Vacuum Chamber Internal ion pressure gauge not functioning –Problem traced to incorrect signals fed to electronics box; fixed RASCAL chief ray not aligned as it was prior to pump down –Chief ray remeasured; tip/tilt mirrors corrected Interpoint converter found to be faulty after check of calibration lamp voltage and current telemetry – LVPS board removed, x-rayed at GSFC –Solder leads lift from solder joints under vacuum –Other converters (5) x-rayed to ensure sufficient strain relief –Spares also being checked –Stiffener plates (Kovar) being bonded to tops to prevent stress

Sembach 8 of 21 TIPS - 21 August 2003 STScI Thermal Vacuum Activities Instrument scientists supported initial science verification activities in late June - early July in Boulder, CO –Hartig, Leitherer, Sembach participated on-site –Friedman analyzed spectral repeatability data –Approx. 500 datasets produced in two week period Science calibration data archived in MAST –All data run through OPUS and initial CALCOS processing –T-Vac retrieval screen available –Automated data transfer algorithms developed and implemented –Data also stored locally on COS machines for rapid analysis Keyword consistency checking –Fidelity of FITS keywords being checked with help from Rose/Hodge

Sembach 9 of 21 TIPS - 21 August 2003 COS Initial Testing Summary Instrument is performing as expected optically –Spectral resolution ~ 20,000 in medium resolution modes –Throughput meets/exceeds CEI specifications –Geometric distortion can be corrected accurately –Grating motion repeatability is as good as expected –Spatial resolution ~ 1 arc sec Final calibration activity plan being finalized by CU/Ball –Close cooperation with STScI Testing to resume in mid-September

Sembach 10 of 21 TIPS - 21 August 2003 Sample COS FUV Spectrum External PtNe calibration lamp (no distortion correction)

Sembach 11 of 21 TIPS - 21 August 2003 Sample COS NUV Spectrum External PtNe calibration lamp

Sembach 12 of 21 TIPS - 21 August 2003 Initial FUV Spectral Resolution Results - G130M External PtNe calibration lamp R = 

Sembach 13 of 21 TIPS - 21 August 2003 Initial FUV Spectral Resolution Results - G160M External PtNe calibration lamp R = 

Sembach 14 of 21 TIPS - 21 August 2003 Initial NUV Spectral Resolution Results G185M G225M G285M External PtNe calibration lamp R = 

Sembach 15 of 21 TIPS - 21 August 2003 GratingWavelength (Å)Efficiency Requirement G130M-B ±0.018>0.103 G130M-A ±0.017 G160M-B ±0.011>0.077 G160M-A ±0.016 G140L ±0.014>0.07 G185M ±0.0043>0.018 G225M ±0.0023>0.023 G285M ±0.0014>0.017 G230L ±0.029>0.021 TA ±0.0043No req TA1-Brt ±0.0003No req Initial COS Efficiency Estimates From Wilkinson et al. (2003, SPIE)

Sembach 16 of 21 TIPS - 21 August 2003 Initial Spatial Resolution Results TA1 Image (NUV) Double pinhole aperture 1” (~40 pixels) separation Dispersion (pixels) Cross Dispersion (pixels) Images are clearly resolved

Sembach 17 of 21 TIPS - 21 August 2003 Initial FUV Grating Motion Repeatability Results

Sembach 18 of 21 TIPS - 21 August 2003 Initial NUV Grating Motion Repeatability Results

Sembach 19 of 21 TIPS - 21 August 2003 STScI Ground System Development and COS Pipeline Bright object screening tool (ROBOT) in progress Flatfield commanding rework complete HST data volume study – COS on-orbit and pipeline estimates updated Bench testing of command certification SMS (T. Wheeler) Planning of Integrated Pipeline Test started COS Pipeline (CALCOS) COS Pipeline (CALCOS) – Most modules are now complete – Spectral merging procedures for FP-POS positions in progress – Testing to occur on integrated SI data from T-Vac

Sembach 20 of 21 TIPS - 21 August 2003 SMOV & SMGT Successful SMOV4 requirements review 30 July 2003 at GSFC Special commanding definition required by Oct 2003 –COS Operations Working Group will establish requirements SMOV activity summaries (Phase 1 proposals) definition Nov-Dec 2003 –Review presently scheduled for late Jan 2004 SMGT now planned for late July 2004

Sembach 21 of 21 TIPS - 21 August 2003 STScI User Support  STScI Instrument Division COS Staff – IS: Keyes, Sembach, Friedman; DA: McMaster – Leitherer transferred from COS to JWST in July 2003 (supporting T-Vac)  COS Handbooks – Mini-handbook for Cycle 13 being revised (August 2003) – Instrument handbook outline exists, work to continue after T-Vac  COS Exposure Time Calculators – Spectroscopic ETC software development in progress – Target acquisition ETC requirements delivered to APT group – Completion of ETCs expected in January 2004  COS Website

Sembach 22 of 21 TIPS - 21 August 2003 COS Performance (FUV)

Sembach 23 of 21 TIPS - 21 August 2003 COS Performance (NUV)

Sembach 24 of 21 TIPS - 21 August 2003 FUV02 / FUV01 QE Comparison