EGO (European) Everyone’s Gliding Observatories Action ES0904 Start date: 15/07/2010 End date: 14/07/2014 Year: 4 Pierre Testor Chair LOCEAN-CNRS / France.

Slides:



Advertisements
Similar presentations
Ocean Reference Time-Series Moorings: Acoustics By Bruce M. Howe Applied Physics Laboratory, University of Washington Reference Time-Series Science Team.
Advertisements

GEO SB-01 Oceans and Society: Blue Planet An Integrating Oceans Task of GEO GEO-IX Plenary November 2012 Foz do Iguaçu, Brazil on behalf of the Blue.
Fibre suspension flow modelling A key for innovation and competitiveness in the pulp & paper industry FP1005 Start date: 11/05/2011 End date: 10/05/2015.
Modernet, a network for development of new techniques for discovering trends in occupational and work-related diseases and tracing new and emerging risks.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Wilhelm PetersenI HZGI 2013, June 18/19th I UPMC I Paris JERICO MID TERM REVIEW WP 3 Harmonizing technological.
Final General Assembly – Paris, France – September 19, 2014 FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011.
Bio-optical Gliders and Profiling floats in the Mediterranean ARGO SCIENCE WORKSHOP – MARCH 13 – 18, 2006 Fabrizio D’Ortenzio 1, Katarzyna Niewiadomska.
First Marine Board Forum – 15 May Oostende Marine Data Challenges: from Observation to Information From observation to data.
European COastal-shelf sea OPerational monitoring and forecasting system ECOOP.
Marine affairs – a bridge for peace Sustainable development will be achieved only by combined regional efforts Prof. David Faraggi, Vice Rector, University.
» Data buoys measure air pressure, temperature (sea-surface & air), ocean current velocity and wind velocity across all oceans. These observations are.
Progress Towards a Regional Coastal Ocean Observing System for the Southeast (SEACOOS) Harvey Seim / University of North Carolina at Chapel Hill University.
SeaDataNet, pan-European infrastructure for ocean and marine data management A key component of EMODNet A possible building block for GEOSS By Dick M.A.
Development of the glider system In-Situ Observations MERSEA 3rd annual meeting London, IFM-GEOMAR, Kiel, Germany IMEDEA, Esporles, Spain IFREMER,
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 30th september 2014 Duration 36 months – Periods : 2 (month.
The MyOcean Concept P.Bahurel, project coordinator.
Final General Assembly – Paris, France – September 19, 2014 FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011.
The Climate Prediction Project Global Climate Information for Regional Adaptation and Decision-Making in the 21 st Century.
European Network on New Sensing Technologies for Air Pollution Control and Environmental Sustainability - EuNetAir COST Action TD1105 WGs and MC Meeting.
Pierre Testor LOCEAN, CNRS, Paris, France EuroGOOS Joint ROOS-WG-TT, 04 March 2015, Brussels, Belgium 1km ~2-5km Data Centers Land Station users A “glider”
1 INFRA : INFRA : Scientific Information Repository supporting FP7 “The views expressed in this presentation are those of the author.
APPLICATION FORM OF ROBINWOOD SUBPROJECT SECOND STEP 1. The short listed Local Beneficiaries work together to create international partnerships and prepare.
UNDERWATER GLIDERS.
EGO (European) Everyone’s Gliding Observatories Action ES0904 Start date: 15/07/2010 End date: 14/07/2014 Year: 3 Pierre Testor Chair LOCEAN-CNRS / France.
The GEOSS Portfolio for Science and Technology Produced by ST Featuring: Climate: Capacity Building of Operational Oceanography and Climate Adaptation.
The role of gliders in sustained observations of the ocean Deliverable 4.1 or WP 4.
EPOS a long term integration plan of research infrastructures for solid Earth Science in Europe Preparatory Phase Project
MARINERA Marine ERAnet European Research Area Identify research infrastructures Promote exchange between research teams in and outside Europe Organise.
Integrated Ocean Observing System -- IOOS -- United States Contribution to the Global Ocean Observing System Kurt Schnebele Ocean.US Deputy of Data Management.
Marine Core Service MY OCEAN Potential contribution of Observatories to GMES Marine Core Service, MyOcean Fabrice HERNANDEZ IRD/Mercator Ocean, France.
Joint WMO-IOC Technical Commission for Oceanography and Marine Meteorology Contributions to WIGOS David Meldrum, vice chair, JCOMM OPA.
Page 1 Pacific THORPEX Predictability, 6-7 June 2005© Crown copyright 2005 The THORPEX Interactive Grand Global Ensemble David Richardson Met Office, Exeter.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Final General Assembly – Paris, France – September 19, 2014 FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011.
Symposium on multi-hazard early warning systems for integrated disaster risk management A JCOMM perspective Enhanced early warning for better coastal or.
MRI Expert Group JERICO A Joint European Research Infrastructure network for Coastal Observatories.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 30th september 2014 Duration 36 months – Periods : 2 (month.
Topics describe the Data Buoy Cooperation Panel (DBCP) –aims, –achievements and –Challenges network status developments of data buoy technology JCOMM.
International Argo structure Argo TC M. Belbeoch Accra, Ghana.
Overview of CEOS Virtual Constellations Andrew Mitchell NASA CEOS SIT Team / WGISS NASA ESRIN – Frascati, Italy September 20, 2013 GEOSS Vision and Architecture.
1 Direction scientifique Networks of Excellence objectives  Reinforce or strengthen scientific and technological excellence on a given research topic.
EuroGOOS Annual Meeting 2009/10/ /10/08 2b: Contribution of open ocean observatories to GEO Data Core – Biodiversity, Ecosystems and Health Richard.
Future Perspectives of Ocean Observatories in Germany [Name of the infrastructure / site / time series…] Contact person: [name, ] [Institution(s)
ISTANBUL UNIVERSITY RECTORATE INSTITUTE OF MARINE SCIENCES AND MANAGEMENT (Postgraduate Institute)
The Mediterranen Forecasting System: 10 years of developments (and the next ten) N.Pinardi INGV, Bologna, Italy.
European Gliding Observatories Network (EGO) Action ES0904: Start date: 01/10/2010 End date: 30/09/2013 Year: 1 Pierre Testor Chair LOCEAN-CNRS / France.
M editerranean I ndex on operational oceanography and pilot A pplication for what-if predictions A proposal for a Specific Support Action submitted to.
World Climate Research Programme Joint Scientific Committee – 31 Antalya, Turkey.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
E u r o p e a n C o m m i s s i o nCommunity Research Global Change and Ecosystems Malta, 27 January 2004 Alan Edwards EUROPEAN COMMISSION GMES – Implications.
1 The Argo project 21st Century in-situ Ocean Observing System M. Belbeoch, Argo Technical Coordinator with inputs from D. Roemmich, Argo Steering Team.
ARIMNet Presentation ARIMNet A cooperative network for Agricultural Research in the Mediterranean Michel DODET Coordinator.
Richard Escritt, Director – Coordination of Community Actions DG Research, European Commission “The development of the ERA: Experiences from FP6 and reflections.
Sensor Web Enablement (SWE) developments for fixed monitoring platforms and research vessels By Dick M.A. Schaap – SeaDataNet Technical Coordinator with.
Aerosols, Clouds and Trace gases Research Infrastructure
EGO: Everyone’s Gliding Observatories
FP7-Infra : Design studies for European Research Infrastrutures
TD1203 Start date: 01/03/2013 End date: 31/02/2017 Year: 1st
Highly Ionised Pulse Plasma Processes (HIPP processes) MP0804
Oceans and Society: Blue Planet
MonGOOS network Enrique Alvarez, (Puertos del Estado)
Overview of working draft v. 29 January 2018
Waddah Saab – European Commission – RTD.H.2
Contributions to WIGOS David Meldrum, vice chair, JCOMM OCG
Challenges & opportunities for developping regional cooperation
Animal-Borne Instrument Task Team ABI TT Terms of Reference
Institut Français de Recherche pour l'Exploitation de la Mer
Presentation transcript:

EGO (European) Everyone’s Gliding Observatories Action ES0904 Start date: 15/07/2010 End date: 14/07/2014 Year: 4 Pierre Testor Chair LOCEAN-CNRS / France The Economist, 2012/06/09

2 worldwide efforts in the context of climate change Role of the ocean in climate: the ocean is a “buffer” of atmospheric global change and transports heat from the tropics to the poles  monitoring worldwide efforts for the global ocean observation (physical and biogeochemical): satellites and in-situ Data + numerical modeling : analyses and forecast of the ocean (FP7 MyOcean) → science AND societal needs (climate, … marine resources, security)

Courtesy of H. Freeland, in-situ system today : profiles T & S on [0-2000m] automatic measurements, transmitted in real-time « 300km x 300km – 10 days » Global numerical models (~6 km res.) MyOcean Climate Research and the Global Ocean Observation System (GOOS)

4 Gliders = new platforms and sampling capabilities Data Center Land Station 1km Measure: - currents (averaged over the dives) - physical/biogeochemical properties Steerable, can be deployed by numbers. Scientific community, operational models U ~ km/day Endurance: ~2-11 months ~2-5 km between surfacing

5 Scientific context and objectives (1/2) Background / Problem statement: [What is the scientific context and what challenges are the Action addressing?] The ocean interior is still under sampled. The glider technology can help fill the gaps left by the other observing systems (ships, satellites, moorings, floats, drifters). Testor et al, Brief reminder of MoU objectives: [What are the Action’s objectives?] The main objective is the European coordination of ongoing research using gliders, and the conception of future research. The aim is to build the capacity to operate fleets of autonomous underwater gliders at the international level, providing cost-effective methods for the discovery and monitoring of the ocean at global, regional and coastal scales, for the benefit of both marine research and operational applications for marine activities - climate - «green» objectives - security - end-users (GEO,GMES, MSFD…) Scale interaction s Global scale mesoscale submesoscale Oceanic Processes seasonal Regional scale

6 Scientific context and objectives (1/2) Background / Problem statement: [What is the scientific context and what challenges are the Action addressing?] The ocean interior is still under sampled. The glider technology can help fill the gaps left by the other observing systems (ships, satellites, moorings, floats, drifters). Testor et al, Brief reminder of MoU objectives: [What are the Action’s objectives?] The main objective is the European coordination of ongoing research using gliders, and the conception of future research. The aim is to operate fleets of autonomous underwater gliders at the international level, providing cost-effective methods for the discovery and monitoring of the ocean at global, regional and coastal scales, for the benefit of both marine research and operational applications for marine activities Satellite image sea color - surface Chl mesoscale ( km) submesoscale (1-10 km) 300km Vertical structure?!?

Scientific context and objectives (2/2) Research directions: [How are the objectives of the MoU being achieved? Recall briefly the approach and methodology as stated in the MoU.] 1.build a capacity at the scientific, technological, and organizational levels through a tight network of laboratories/institutions, 2.strengthen the interdisciplinary research environment, make researchers and engineers in marine sciences, as well as those interested in robotics work together around glider operations, sensors, data analysis. [Highlight the Action’s innovative work—what is its unique contribution that is not duplicated elsewhere?] New technology, attempt to avoid early fragmentation of the activity. Development of the concept of a glider research infrastructure 1) having a global range (distributed network of ‘gliderports’, common tools/procedures, formats) and 2) developing synergies with the other ocean observing systems (ships, profiling floats, moorings…) ~80 EU gliders + ~20 teams (and downstream infrastructures)

8 Working groups 1.Support for glider deployments and data dissemination data flow and management - international infrastructure (steering team, technical coordinators, etc) to develop the community consensus. Legal framework. 2.Glider vehicle, sensors, and “gliderports” infrastructures possible technical developments on platforms and sensors (physical, bio-optical, acoustics, video). Best performances (calibration, consumption,…). Main gliderports design/networking (infrastructure for preparation, maintenance and evolution, logistics, computing facilities). Development of a network of worldwide local supports or “secondary” gliderports. Training support activity. 3.Piloting gliders and artificial intelligence “24/7” control of the gliders. Develop easy and ergonomic access to piloting facilities, auto-pilot systems, flight control systems, automated fault diagnosis and environment information systems. Interactions between distributed services. Interoperability of the different glider types. 4.Networks, links with the other observing systems and OSSEs “how gliders can be optimally combined with other observing systems” can be answered by using Observing System Simulation Experiments and “network design” methodologies which can assess the feasibility and optimality of possible configurations. 5.High resolution 4D oceanic measurements and process studies 4D oceanic estimates with fleets and repeat-sections for large scale or regional budgets. Investigation of mesoscale and submesoscale processes, using for instance adaptive sampling techniques (WG3). and numerical simulations (WG4). Detailed post processing of scientific data.

9 Grant Holder: OC-UCY (Oceanography Center - University of Cyprus) Gregory Konnaris Cyprus Action Parties

10 Action participants

11 Use of COST Instruments Activity (No.)Year 1Year 2Year 3Year 4 MC/WG Meetings1563 STSMs05911 (+3) Training Schools0000 Workshops or Conferences 100(1) Joint Publications020(1)

12 Use of COST Instruments MC/CG/WG meetings: 1 MC meeting + WG1 meeting, Trieste, Italy, 03-06/06/2013 (GROOM general assembly) 1 WG meetings: WG2/5: glider CTD workshop, Geesthacht, germany  EU/international coordination + solve a previously identified issue STSMs:  Address specific S/T topics + share know-how and expertise Joint publications  will be the final outcome of the Action.

13 Results vs. Objectives [progress towards reaching the Action scientific objectives during the past year.] International coordination (mainly EU, USA, AUS). Strengthening of the EU network. Glider data management. Demonstration of glider capabilities to observe mesocale and submesocale features. So, this year it m ainly concerned WG1, WG2, and WG5. Better understanding of the oceans and building glider capacities: 31 (78 in total) publications + 31(247 in total) communications : –(sub)mesoscale processes in the ocean, –seasonal cycle; –optimal sampling; –robotic characterization; –Risk assessment –Definition of common formats. [added value of networking, i.e. what could not have been achieved without the Action’s research network.] Our Action has strengthened the glider community in Europe. A distributed infrastructure is being set up. Information circulates. Duplication of efforts is avoided. Dissemination is coordinated. Spin-off of EU and national projects.

14 Significant Highlights in Science or Networking (1/2): international coordination and data management The joint EGO WG1 meeting and GROOM GA in June 2013 (Trieste, Italy) allowed us to continue to interact with our USA and Australian colleagues (mainly). The implementation of the EGO gliders into a sustained component of the GOOS, in conjunction with other systems such as the Argo profiling floats, the OceanSites moorings… A first common data format was issued in the 3 main poles of glider activity (EU, USA and AUS).  FP7 Design Study: Gliders for Research, Ocean Observation and Management, 19 partners (9 countries)

A regional approach for the GOOS: ROOS (Regional Ocean Observing System) ~80 EU gliders + ~20 teams (and downstream infrastructures) A Research Infrastructure distributed in 6 ROOSes (+global: GOOS) In connection with: Marine Board, EuroGOOS and similar EU projects: Jerico, EuroArgo, EuroSites, Eurofleets, MyOcean, Seadatanet, EMODNET,… Significant Highlights in Science or Networking (1/2): international coordination and data management

USA AU EU Harmonization (standards/formats) Monitoring the glider network activity (based on the operators good will but works!) and data dissemination Maybe ~500,000 profiles since 2005 All glider deployments since 2005 (+ deployments in the Artic/Antarctic, SE/SW Pacific, Polynesia, Indian ocean,…) 12,000 km altitude IOOS/NGN IMOS/ANFOG(EOOS?)/GROOM Process studies AND long-term observations Significant Highlights in Science or Networking (1/2): international coordination and data management

17 Significant Highlights in Science or Networking (2/2): Advances in Marine Sciences [Please see previous instruction slide.] There have been significant breakthroughs in particular in the analysis of mesoscale and submesoscale processes in the ocean based on glider data Distance (km) Have a significant influence on the intermediate and deep circulation Bosse et al. (2014): Spreading of Levantine Intermediate Water by Submesoscale Coherent Vortices in The Northwestern mediterranean Sea as observed with gliders Anticyclonic, D~10km, U ~ 10cm/s Several months lifetime

18 Challenges [Were there any significant deviations from the work plan in the past year (e.g. new research directions)?] asked for a 1-year extension. Did not work. [What are critical phases to be implemented or topics to be addressed for the upcoming months?] –Organize the (anticipated) Final Symposium in June 2014 –Prepare the (anticipated) final outcome of the Action (problem of schedule with GROOM end in Nov 2014) –Find a way to continue our networking activities. This is clearly vital for our distributed network of gliderports and teams to avoid fragmentation (entropy increases)

1st Symposium of the Action (130 participants, 68 oral presentations), in Las Palmas, Spain, March WG/CG meetings and 7 STSMs (+10 planned) Elaboration of a FP7 project “Infrastructures , Design studies” GROOM, Gliders, for Research, Ocean Observation and Management, grant agreement No partners, 9 countries, 3.5 MEuro. slocumexocetus seaglider spray sterne seaexplorer Spin-off of many EU and national projects 3 dissemination articles International coordination (USA, AUS, EU and others). Gliders as a component of the GOOS. Setup an international community of practice 78 publications and 247 communications Commercialization of a French glider (seaexplorer, ACSA, France) Final symposium to organize and final outcome to write Main achievements

Control of buoyancy and internal mass distribution Vertical velocity, pitch (and roll) Horizontal velocity (direction) no propeller! A profiling float with wings

Best practice for gliders ! the formation of the global glider system; the adoption of standards and a “Argo” like data system for gliders; the setup of a network of shared resources and expertise; to establish the adoption of a common and accessible portal for glider data. A glider component in the GOOS The challenge: bidirectional communications “main” gliderports distributed over the world Development of Operational Oceanography (EU Seas + adjacent oceans) Systematic and long-term measurements, rapid interpretation and dissemination