PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

PACS SVR22/23 June 2006 Erich Wiezorrek, MPE Test Facility Capabilities EGSE.
PACS IIDR, Noordwijk 1-2 Mar 2001 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, U. Klaas J. Katzer (ZEISS) Max-Planck-Institut für Astronomie,
PACS IHDR 12/13 Nov 2003 Overview and Mechanical/Thermal IFs to FPU 1 MPE J. Schubert PACS IHDR.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PACS Management, …1 PACS Management, Funding and Schedule Otto H. Bauer MPE Garching.
1 GAIA System Level Technical Reassessment Study Final Presentation ESTEC, April 23rd 2002 Part 1b Development & AIV.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
PACS IHDR, Garching 12/13 Nov 2003 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, A. Böhm, A. Bohm (Hardware) R. Vavrek, U. Klaas (ICC) J. Katzer,
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
A Finmeccanica Company 04/2000/1 EUSO Development Philosophy EUSO General Meeting Max Planck Institute for Physics Munich, November the 20th 2003.
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
Presentation EddiCam consortium, FF, Madrid 13/06/2002 Eddington programmatic status Fully approved by SPC as part of ESA’s science program as project.
PACS IBDR 27/28 Feb 2002 PACS Photometer1 PACS PHOTOMETER J.L Auguères L.Rodriguez CEA/DSM/DAPNIA Service d’Astrophysique.
DVA Series Work Flow P. Dewdney Apr 15, SPDO DVP Work Flow 2 DVA-1 CPG.
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
PACS IIDR 01/02 Mar 2001 PACS  -ISVR 1  -ISVR Recommendations Introduction and Close-out A. Poglitsch.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
Development programs and model philosophy1 Preliminary design review Prototype program Critical design review Qualification program Qualification review.
PACS IQR 13 Jan 2005 IHDR Close-out1 Close-out of IHDR: Concerns / Recommendations A. Poglitsch.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
PACS IBDR, Garching 27/28 Feb 2002 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause J. Katzer (ZEISS) Max-Planck-Institut für Astronomie, Heidelberg.
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
PACS IIDR 01/02 Mar 2001 On-Board Data Compression1 On-Board Data Compression Concept A. N. Belbachir Vienna University of Technology.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
PACS IQR 13 Jan 2005 First Assessment1 The PI’s Self-Assessment A. Poglitsch.
PACS SVR 22/23 June 2006 PACS FPU Subunits1 FM FPU Subunits A. Poglitsch.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
PACS IBDR 27/28 February 2002 PACS Grating Assembly1 Grating Assembly E. Renotte Centre Spatial de Liège (B)
NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
PACS IIDR ESTEC 01/02 March 2001 OGSE 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher OGSE.
PACS IBDR 27/28 Feb 2002 PACS Instrument Overview1 Instrument Design/Development Status and System Performance PACS Instrument Overview A.Poglitsch MPE.
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/ SPIRE & PACS SORPTION COOLERS.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
PACS SVR 2 18 Jan 2007 FM ILT: Spectrometer1 Spectrometer Performance H. Feuchtgruber, T. Müller, A. Poglitsch.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
PACS SVR 22/23 June 2006 Test Campaigns1 Overview of PACS Test Campaigns Helmut Feuchtgruber MPE.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
PACS 12/13 November 2003 PACS PA/QA IHDR1 PACS PA / QA STATUS Documentation overview Cooperation with PA/QA responsibles -outlook- NCR Status System documents.
PACS SVR22/23 June 2006 Warm Electronics1 Warm Electronics: Components/Subsystems Test Results B. Voss PACS SVR.
3 He Fridge SPIRE WE Review Dec. 6-7, IFSI 1 3 He Sorption Fridge “Cooler” WE Preliminary Design Presented by: L. Rodriguez / CEA/SAp. Subsystem.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
PACS IHDR12/13 Nov 2003 Warm Electronics1 Warm Electronics: Overview, Interfaces, Grounding and EMC Martin von Berg PACS IHDR.
PACS IIDR 01/02 Mar 2001 PACS Grounding Scheme and EMC1 Grounding Scheme and EMC Matthias Rumitz, MPE.
BSMIan Pain, UK ATC SPIRE Instrument Intermediate Design Review April 23, RAL 1 Beam Steering Mirror Sub-System IIDR Overview Ian Pain UK ATC Colin.
FM1 Instrument Suite PSRSCM - 1UCB, September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) SEARCH COIL MAGNETOMETER (SCM) Michael Ludlam.
PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PA/QA Status1 O.H. Bauer MPE Garching PA/QA Status.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
PACS IIDR ESTEC 01/02 March 2001 Budgets and Interfaces 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Budgets and Interfaces.
Camera PDR/CD1 Planning 19 September 2008
CINEMA System Engineering
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
GLAST Large Area Telescope:
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2008.
Instrument Overview Larry Springer HMI Program Manager
GLAST Large Area Telescope:
Presentation transcript:

PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model Philosophy, Critical Areas

PACS IIDR ESTEC 01/02 March 2001 System Engineering 2 Status of Instrument Design Detailed interface requirements have been finalised Subsystem design has been finalised Detailed system design has been finalised Design for on-board software has been finalised Design of EGSE and OGSE concept have been finalised

PACS IIDR ESTEC 01/02 March 2001 System Engineering 3 Status of H/W Documentation at IIDR All Specifications Documents related to components, subunits and units are issued Interface Requirements Doc. and all ICDs are issued The Instrument Requirement Doc. is issued The Instrument Science Requirement Doc. is issued DDVP is updated to final instrument design Test Plan (instrument AIV and calibr.) is issued (draft) IID-B update issued

PACS IIDR ESTEC 01/02 March 2001 System Engineering 4 DDVP and TP Main Contents DDVP describes the development approach according to the system level requirements, the overall qualification and verification concept at subunit/unit/ instrument level. No further issues are intended. Individual DDVPs are issued for components, subunits and units. They contain the relevant detailed information and cover the DIV program (environmen- tal and performance) until delivery of items to MPE. TP deals in detail with that part of DDVP which is related to all AIV activities (environmental and performance/calibration) on Instrument Level. Schedules and Test Facilities are included.

PACS IIDR ESTEC 01/02 March 2001 System Engineering 5 Subsystem Verification (Qualification of Units)

PACS IIDR ESTEC 01/02 March 2001 System Engineering 6 General Instrument AIV Sequence Instrument Units manufactured by PACS Consortium Partners AIV on Unit level GEN-AIV-T01 Delivery Readiness Review (acceptance tests passed at manufacturers site) GEN-AIV-T02 Delivery of Units to MPE GEN-AIV-T03 Integration and Instrument Level Test (ILT-AVM/CQM/PFM/FS) Responsibility of MPE (cryovibration/functional and performance test/spectral calibration at TBD / MPE / LENS using special test equipment at different test sites) GEN-AIV-T04 Delivery to ESA GEN-AIV-T05

PACS IIDR ESTEC 01/02 March 2001 System Engineering 7 Instrument Units (Deliverables) 1 cryogenic FPU mounted on OB 8 warm electronics boxes mounted on SVM - 1 DPU (prime and redund.) - 2 SPU (1 prime, 1 redund.) - 4 analogue electronics boxes DEC1, MEC1 (prime), DEC2, MEC2 (redund.) - 1 analogue box BOLC 1 preamplifier box BOLA mounted on CVV 1 set of interconnecting harnesses

PACS IIDR ESTEC 01/02 March 2001 System Engineering 8 Instrument Block Diagram

PACS IIDR ESTEC 01/02 March 2001 System Engineering 9 Thermal Mathematical Model Upgrade of TMM performed after implementation of bolometer assembly and according to design progress. New steady state conditions and transient behavior (temperatures and heat fluxes) of all inner parts of the FPU available. Predictions are reliable, if the PACS TMM is combined with the S/C cryostat TMM. An FPU cooldown time of more than 5 days is expected

PACS IIDR ESTEC 01/02 March 2001 System Engineering 10 Thermal Mathematical Model Schematic

PACS IIDR ESTEC 01/02 March 2001 System Engineering 11 Structural Mathematical Model Structural Analysis repeatedly performed after final FPU design. Impact of improvements on parts of FPU structure is being investigated Resonances above 100 Hz achieved Values for resonance amplifications will be available very soon giving final loads on individual subunits (chopper, grating, detectors, bolometer assembly, filterwheels, sources etc.) Results under agenda point FPU Mechanics

PACS IIDR ESTEC 01/02 March 2001 System Engineering 12 Redundancy Concept WE units redundancy features - fully redundant: DPU, SPU, MEC - partly redundant:BOLC - not redundant: BOLA, DEC (several features to improve reliability) FPU redundancy features (no full redundancy) - Detectors (modules, supply groups, subarrays) - neither optics nor mechanisms are redundant (redundant windings and sensors)

PACS IIDR ESTEC 01/02 March 2001 System Engineering 13 Redundancy Scheme (Wiring)

PACS IIDR ESTEC 01/02 March 2001 System Engineering 14 Grounding Concept and EMC/EMI A final grounding concept has been achieved, detailed diagrams are shown in document PACS-ME-LI-006 EMC/EMI study has started at MPE to identify and analyse critical points of system design. Modeling will provide EMC improvement. Grounding and EMC issues will be presented under agenda point Grounding Scheme

PACS IIDR ESTEC 01/02 March 2001 System Engineering 15 Model Philosophy Deliverable Models to ESA are AVM, CQM, PFM, FS cold FPU (refurbished CQM) and electronics spare kits. For qualification of warm electronics units a QM model is required. But, a specific PACS SPU QM will not be built, qualification is done within Planck Proj. AVMs will not be returned to the PIs together with the CQM. For the test and calibration program (ILT) on the refurbished CQM FS-FPU (and for the benefit of further S/W development), all QM WE units are needed on instrument level (missing QMs need to be replaced by AVMs).

PACS IIDR ESTEC 01/02 March 2001 System Engineering 16 H/W Deliverables (...) means not a deliverable

PACS IIDR ESTEC 01/02 March 2001 System Engineering 17 Critical Areas Critical Areas regarding technology issues: CRE redesign and manufacture of complete QM-FEE (=> pretests on basic circuits) Grating assembly performance (=> development model, investigation of dry lubricants of bearings) Bolometer subarray manufacture Chopper (=> lifetime model) Black Paint (=> sample performance and qualification program) Temperature Sensors (=> qualification program)

PACS IIDR ESTEC 01/02 March 2001 System Engineering 18 Critical Areas ctd. Critical Areas with respect to AIV and schedule: CRE redesign/manufacture/delivery loop Detector modules and array/baffle assembly Detector module testing (little/no margin) Bolometer Unit AIV ILTs (little/no margin)

PACS IIDR ESTEC 01/02 March 2001 System Engineering 19 CRE Risk Analysis Increased progress in CRE development makes a need for replacement of CREs by TIAs in the Photodetector Modules very unlikely CQM detector arrays will be fitted with CREs TIA performance proven during QM detector module pretests at MPE

PACS IIDR ESTEC 01/02 March 2001 System Engineering 20 Impact of TIA-Arrays on PACS performance In case the CRE performance is not adequate for PACS FM, the impact is - two 25x16 (CRE) arrays to be replaced by two 4x16 (TIA) arrays - heat dissipation 35 mW, linear 1x4 on sky Re-definition of spectrometer calibration and observation, redesign DEC, S/W redesign DEC, SPU, DPU TIA concept is not an alternative solution, PACS efficiency in observation time degraded

PACS IIDR ESTEC 01/02 March 2001 System Engineering 21 Summary Slide Redundancy Concept Redundancy Scheme (Wiring) Grounding Concept and EMC/EMI Model Philosophy H/W Deliverables (...) means not a deliverable Critical Areas Critical Areas ctd. CRE Risk Analysis Impact of TIA-Arrays on PACS performance Summary slides PACS Instrument Intermediate Design Review (IIDR) Status of Instrument Design Status of H/W Documentation at IIDR DDVP and TP Main Contents Subsystem Verification (Qualification of Units) General Instrument AIV Sequence Instrument Units (Deliverables) Instrument Block Diagram Thermal Mathematical Model Thermal Mathematical Model Schematic Structural Mathematical Model