Robin Lafever For Russell wilcox Fiber Synch System Basic Box Fit-up 25mm and 50mm deep boxes installed in 17” chassis 12/1/20151Robin Lafever LBNL.

Slides:



Advertisements
Similar presentations
Kevin Coke ID#: Rochede Sibblies ID#: Sandrene Haughton ID#:
Advertisements

Your universal enclosure. 159 LC  159 Cubic inches of space with a hinged lid  Made from all galvanized steel, powder coated white, with a rubber.
Mech assemblymay MuTrFEE Assembly Procedure Mechanical.
The White Box Robert Pantanella And Cam Macones. Goal The goal of the experiment is to insulate a soda can filled with hot water when it is placed in.
Cable Channel tests ____________________________________________________________ 17/Apr/07 Pisa Group Four configurations of insulation has been tested.
MERIT Hg System Final Design Review Hg Target System Design Interfaces V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma.
ICE CUBE Shake test Mounting fixture workups Proposed test set up –06 Robin Lafever 03 June
J. H. ChrzanowskiNSTX TF Flag Joint Design Review1 NSTX TF Flag Joint Design Review Fabrication and Assembly April 10, 2003 By: James H. Chrzanowski.
PKI-Anwendungen 6/2/ Base framework. PKI-Anwendungen 6/2/ Bottom frame.
SUPERCAM SINGLE PIXEL BLOCK MEASUREMENTS HAMDI MANI 09/12/2008.
Mounting arrangement for the Solid Absorber. This contains mounting arrangement for:- 1. Handling and lifting from manufacturer’s place to RAL; 2. For.
Polaris 6x6 UTV Instructions for Fuel Tank Vent Tube Modification 2005 – 2009 models For further information contact: Michelle Ryerson or Carl Dorsey,
1 Telecom Cabling Ladder racks systems and relay racks Ladder racks systems and relay racks.
…an innovative shell and tube heat exchanger with an exceptionally high heat transfer coefficient for industrial fluid cooling and air conditioning.
Propose design changes on the diffuser unit Reason for the change:- See Marco Apollonion’s write up to the Technical Board on 7 th of Aug. 2008:- Hi Andy.
SQXF Shell & Yoke Assembly Procedure
9/13/2015Robin Lafever BigBoss1. Fiber and Ferrule 9/13/2015Robin Lafever BigBoss2 Typical fiber and Ferrule: My current model is out of date. Jerry Edelstein.
CUORE Clean Room Robin Lafever LBNL LNGS 9/18/2015Robin Lafever LBNL, LNGS1.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
Mounting best practices 1.Always mount to a solid, rigid surface when available 2.Whenever possible, it is recommended you mount the ShockLog directly.
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
Door seal test set-up concepts 10/10/2015Robin Lafever LBNL1 Generic Door seal concepts for personnel access and feed-through applications in the CUORE.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Notes from Apr 21 Whiteboard session 1 Robin Lafever Thursday afternoon, 21 Apr We convened around a Whiteboard to try to integrate the spectrum of ideas.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Muon System PMT Cable Routing Kirk McDonald Princeton University (July 28, 2007)
1 Booster Corrector BPM Status AD/ Instrumentation Jim Fitzgerald.
LRR – Mechanical Alphonso Stewart Judy Brannen David Steinfeld Ilene Sokolsky Eric Jenkins.
Start Typical student project Advanced student project Level of final response.
Robin Lafever1 JDEM Focal Plane Assembly Full-scale Mock up and Cold Plate Engineering model Prepared for Michael Levi and Henry Heetderks JDEM.
14.52 in Attach the Axle to the chassis using the four (4) bolts, washers, and nylon lock nuts. Mount the tires. Note: The wheel recess outside on the.
M-21 Mockup Fold-Flat Mirror Assembly M21-B-2 Robin Lafever LBNL 1 Fabrication and assembly notes.
11/30/20151Robin Lafever The existing 300 K Flange This is certainly an older version but is useful to illustrate The proposed modifications.
C1 inspection results T. Meighan. C1 Lead Block Area Upper chill plates bowed upwards from side pressure (?) Top fingers pulled away from winding pack.
Typical PSA cabinet used in these layouts is based on a Type A, Series 400 Stainless Steel unit from Terra Universal. Catalog cut is shown below. CAD Models.
As-built 09 April 2008 Cuore concrete support structure with jack screws in place Cuore site with elevator deck ready for installation 1 Robin Lafever.
MICDS C AN C HALLENGE 2011 Madison Wrobley and Isabella Kendall.
Aluminum profile system of 50 mm of thickness for glass leaves TK50.
Gen Magnet Design JLAB MENG Contributors: Supervisor: Butch Dillon-Townes Magnet Engineer: Robin Wines Mechanical Designer: Ron Lassiter Mechanical Engineer:
A 128 fiber Slit-Plate assembly, Kinematic mount
Aluminum probe carrier body Aluminum drive tube -assembled in sections, this provides up/down and rotational motion control of probe Fiber optic/ electrical.
A simple clamping device for the Solid absorber Wing Lau, Oxford.
Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
SNAP CCD packaging study Flex-fold Internal flexure frame Robin Lafever September 2003 CCD Aluminum Nitride Invar frame CRIC, Clocks Molybdenum frame CCD.
WFIRST Large-cell structure concept design Preview Work in progress 3/4/2016Robin Lafever1.
D. Peterson, for discussion of LC-TPC LP, interface of Endplate and Field cage, Discussion of the LP endplate and field cage geometry A version.
NCSX Day 1 ECC (Extra Cheap Cryostat) Cryostat Configuration Status Report – September 30, 2006.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
Fiber Cable/Spectrograph Interface: The Slit-Plate Slit-Plate models are coming together. Who will fab and assemble the parts, and how, will be integral.
Correspondence with HuntVac. Jan 13 Sven, Thanks for the call. Just to recap (and so I don’t lose my notes): · Redesign AL box vessels. · QTY.
FRC Team 2337 Plate/Rail Chassis Design Fully functioning prototype making its debut. Featuring ½ X 1 X 1/8 top and bottom rails, 3.5 X 5.0 motor and shaft.
Project Document Number GTMP-5076 L-1011oem Wing Upgrades W. M. Langford Advanced Models Systems & Sensors Branch 22 June 2004 (a.k.a. L-1011_mod1) Generic.
New Support Structure 4x4 Beams Existing Stairs per Mr Walter Kellner Cherenkov 32 deg shifted back 4.0 inches to clear existing structure Cherenkov 40.
The reading is 7.38 mm. The reading is 7.72 mm.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
Mounting TPCs in SVX Dock During Phase II Tomorrow I will meet with a company engineer to update the BEAST TPC vessel design. I've attached some slides.
SVD Docks Markus Friedl (HEPHY Vienna) B2GM, 23 July 2012.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
Correspondence with HuntVac
Methods for Mounting LCD Displays
MKTG 2016.
TPC Support and Constraint TPC Support
Test box for ProtoDUNE SP – Integration Test
2.2 Gallon TourTank Installation
EVLA LO/IF Racks/Bin/Modules
Tagger Microscope Mounting, Shielding & Cooling
Pump House wall before installation.
Piping Flow Maintenance
Self-sealing Cable Transit Panel Project Update
Presentation transcript:

Robin Lafever For Russell wilcox Fiber Synch System Basic Box Fit-up 25mm and 50mm deep boxes installed in 17” chassis 12/1/20151Robin Lafever LBNL

12/1/2015Robin Lafever LBNL2 Russ, I have worked up new versions of the Basic Box, and installed them in a typical chassis. Here is the 25 mm deep version.

12/1/2015Robin Lafever LBNL3 Russ, I have worked up new versions of the Basic Box, and installed them in a typical chassis. And, here is the 50 mm deep version.

12/1/2015Robin Lafever LBNL4 For this exercise, I have included a generic slot as a fiber bundle feed- through. (ignoring, for the moment, how we seal the feed-throughs) Here is the 25 mm box

12/1/2015Robin Lafever LBNL5 For this exercise, I have included a generic slot as a fiber bundle feed- through. (ignoring, for the moment, how we seal the feed-throughs) Here is the 25 mm box, and, here is the 50 mm box for comparison

12/1/2015Robin Lafever LBNL6 This is a generic 14” x 17” chassis Vibration isolation mounts

12/1/2015Robin Lafever LBNL7 Generic 14” x 17” chassis Vibration isolation mounts Aluminum base plate

12/1/2015Robin Lafever LBNL8 Generic 14” x 17” chassis Vibration isolation mounts Aluminum base plate ¾” Foam insulation

12/1/2015Robin Lafever LBNL9 Generic 14” x 17” chassis Vibration isolation mounts Aluminum base plate ¾” Foam insulation 25 mm Box with Heat-sinks installed

12/1/2015Robin Lafever LBNL10 Generic 14” x 17” chassis Aluminum base plate ¾” Foam insulation 25 mm Box with Heat-sinks installed

12/1/2015Robin Lafever LBNL11 Generic 14” x 17” chassis Aluminum base plate ¾” Foam insulation 25 mm Box with Heat-sinks installed

12/1/2015Robin Lafever LBNL12 50 mm Box Two complete Box units will NOT fit side-by-side in a standard chassis. Also note that the 50 mm unit is higher than the standard 4.5” high chassis 25 mm Box

12/1/2015Robin Lafever LBNL13 However, two units CAN fit side-by-side if they share the center insulation wall

12/1/2015Robin Lafever LBNL14 Note that the Nylon clamp bolts are now inside the overall profile and penetrate through the insulating foam.

12/1/2015Robin Lafever LBNL15 Note that the Nylon clamp bolts now are now inside the overall profile and penetrate through the insulating foam.

12/1/2015Robin Lafever LBNL16 This leaves very little room for routing fibers. But. This looks reasonable. What do you think?

12/1/2015Robin Lafever LBNL17 Completely imaginary fiber bundles

12/1/2015Robin Lafever LBNL18 Completely imaginary fiber bundles

12/1/2015Robin Lafever LBNL19 Completely imaginary fiber bundles

12/1/2015Robin Lafever LBNL20 Final installation.