US Army Corps of Engineers BUILDING STRONG ® Understanding Sedimentation and Land Use Cover Relationships in the Lake Sidney Lanier Watershed Russell A.

Slides:



Advertisements
Similar presentations
18 October 2012 WATERSHED Science & Engineering WEST Consultants Chehalis River Basin Hydraulic Modeling and Flood Relief Alternatives Evaluation.
Advertisements

Stream Corridors Christine Hall Natural Resources Conservation Service North Jersey RC&D Slides 1-12.
Yellowtail Dam & Bighorn Lake Billings, Montana October 18, 2007 RECLAMATION Managing Water in the West.
John H. Kerr Dam and Reservoir John H. Kerr Dam and Reservoir U.S. Army Corps of Engineers Wilmington District.
Snapshot of Northeast Ohio Environment. Overview Topography Watersheds Parks and Conservation Areas Land Cover (developed areas, forests, wetlands, agriculture)
US Army Corps of Engineers BUILDING STRONG ® Mid-West Electric Consumers Association September 16, 2014 Corps of Engineers US Army Missouri River Mainstem.
Watershed Dams in Georgia 1. –357 Total –195 High Hazard (NRCS) –NRCS constructed – owned by local sponsors –Most built between 1950s-1970s for flood.
Negotiating our Water Future in Colorado & the Colorado River Basin Colorado’s Water Plan & the Colorado Basin Plan February 2015 Update Presentation developed.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
South Llano River: One of 2011’sTop Ten National Fish Habitat Action Plan named SLR as “water to watch” WHY?? –Conserve freshwater, estuarine, and marine.
US Army Corps of Engineers BUILDING STRONG ® Suburban Flooding: Finding regional solutions to a growing problem Imad Samara Project Manager and Silver.
Coastal Zone Management.  Coastal Zone Management Act (1972) –Administered by Coastal Programs Division of NOAA –Covers over 22% of U.S. Land Area –Multi-purpose.
Sustained Compliance for Public Water Systems, Chapter 2, Workshop Department of Environmental Conservation Drinking Water Program Anchorage, September.
Negotiating our Water Future in Colorado & the Colorado River Basin Colorado’s Water Plan & the Colorado Basin Plan February 2015 Update Presentation developed.
Streams in urbanizing landscapes: from syndrome diagnosis to watershed prescription NSF Grant
Watershed Forestry Initiative Ellen Kohler Attorney & Policy Specialist Funded in part by Michigan Department of Natural Resources and Environment, Urban.
Clarence Cannon Dam and Mark Twain Lake Flood Control – damage reduction Navigation Hydropower Recreation Water supply Fish and Wildlife Conservation.
Chubaka Producciones Presenta :.
Renewable Energy II Hydroelectric power systems high initial investment, low operating cost, long life expectancy no emissions; high capacity, reliability.
US Army Corps of Engineers BUILDING STRONG ® USACE – ACF Operations Bailey Crane Water Management USACE, Mobile District.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Getting the Big Picture How to Look at Your Watershed Indiana Watershed Planning Guide,
Stormwater Quality Enhancement
Apalachicola/Chattahoochee/Flint Focus Area - USGS WaterSMART NIDIS SE Climate Forum Lake Lanier Islands, GA December 2, 2011.
Lake Sidney Lanier Water Supply for Atlanta, Georgia Field Photos 11/19/07 by J. Ebert.
Yellowstone River Compact Commission Technical Committee Discussions Sheridan County Courthouse Sheridan, WY April 24, 2007 Bighorn Reservoir operations.
Pomme de Terre Lake Water Quality Summary Pomme de Terre Lake Water Quality Summary US Army Corps of Engineers Environmental Resources Section.
CHARLESTONMOBILE WILMINGTON SAVANNAH JACKSONVILLE US Army Corps of Engineers BUILDING STRONG ® NC Water Resources Congress Christine Brayman Deputy For.
Darren Carlson District Manager Kittson Soil and Water Conservation District (SWCD) 410 South 5 th Street, Suite 106 Hallock, MN (218)
Lake Columbia Water Supply Reservoir Project TWCA March 4, 2010.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
H O U S T O N, T E X A S. WATERSHEDS & SUBAREAS Watershed: area of land that drains all the streams/rainfall to a common outlet such as the outflow of.
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
Youghiogheny River Lake Storage ReAllocation for Downstream Water Supply by Werner C. Loehlein, P.E.
Predicting Sediment and Phosphorus Delivery with a Geographic Information System and a Computer Model M.S. Richardson and A. Roa-Espinosa; Dane County.
44 th Annual Mid-Pacific Region 2011 Water Users Conference Water Supply Outlook Reno, Nevada January 26-28, 2011.
Water Supply Reallocation Workshop Determining Yield and Space Requirement.
Development and Land Use Change: Central Potomac River Watershed
Green Infrastructure Network Design Analysis Beaufort County, North Carolina.
IMPROVING MILLERTON LAKE FLOOD CONTROL OPERATIONS TO INCREASE WATER SUPPLY Mr. Antonio M. Buelna, P.E. Mr. Douglas DeFlitch Ms. Katie Lee October 29, 2009.
CORPS OF ENGINEERS NWS Meeting Tallahassee, FL, July 19, 2006.
Western Lake Erie Basin Partnership Presented by: Name, Title Your Organization DATE YOU PRESENTED The Meeting you presented at.
Otter Creek Watershed Meeting January 19, 2008 Mike Dreischmeier Agricultural Engineer Natural Resources Conservation Service.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Lake Sydney Lanier Northeast Georgia Chris McCurdy & Andrea D. Roche.
USACE Managing a Drought  Overview  Timeline  Depletion Scenario Current Status– 17 Oct 07.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Effects of Annual Snowmelt on the New York City Water Supply Adam Czekanski 29 November 2005.
ASTRA Applied Science and Technology for Reservoir Assessment A research and service program of A research and service program of The Kansas Biological.
NID Data Model based on HUC CE394K.3 Term Project by Seungwon Won December 7, 2000.
Public Meeting April 2, 2015 Albany Park Stormwater Diversion Tunnel.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Alameda Creek Watershed San Francisco Public Utilities Commission October 27, 2009.
The Jordan Cove Pacific Connector Gas Pipeline and Terminal.
Reclamation and Hoover Dam It’s All About The Water.
Beneficial Use of Dredge Materials: Introduction to Dredging and Policy J. Bailey Smith US Army Corps of Engineers April 4, 2011.
Rivanna Water & Sewer Authority Presentation to City of Charlottesville Workshop South Fork Rivanna Reservoir (SFRR) Dredging Concept Review May 6, 2008.
Mulberry River Watershed
Savannah River Projects
Dan Child CEE 5440/6440 Utah State University Fall 2003
Evaluating the long-term future of fine sediment in Lake Powell
Grapevine Lake Modeling & Watershed Characteristics
Sand Deposits and Flooding Along the San Jacinto River
Anne Arundel County Maryland
Drought in Upper Colorado Basin
McDonald’s calendar 2007.
McDonald’s calendar 2007.
2015 January February March April May June July August September
Presentation transcript:

US Army Corps of Engineers BUILDING STRONG ® Understanding Sedimentation and Land Use Cover Relationships in the Lake Sidney Lanier Watershed Russell A. Lundstrum Natural Resources Specialist, Park Ranger Lake Sidney Lanier, Buford Dam MGIS Program, Pennsylvania State University Capstone Project July February 2010 Rev. 7

BUILDING STRONG ® Lake Sidney Lanier  Located 60 miles north of Atlanta, GA  Buford Dam built in 1952 ► Filled to full pool in 1957  Over 15,000 adjacent land owners ► 10,000 private docks  Source of drinking water for 3.5 million people  Over 7.5 million visitors to the lake annually

BUILDING STRONG ® Lake Level Action Zones Above 1071’: Flood Water Storage Zone 1: Normal Operation Zone 2: Reduced Hydropower, Limited Navigation Zone 3: Reduced Hydropower, Severely Limited Navigation Zone 4: Hydropower at Minimum, Little/No Navigation Below 1035’: Unable to Generate Power, “dead storage”

BUILDING STRONG ® Vital Statistics  692 miles of shoreline  39,038 acres of water  17,726 acres of land  41 USACE parks  10 Marinas ► 10,000+ Boats  13 County and City Parks  6 State Parks

BUILDING STRONG ® Apalachicola-Chattahoochee-Flint River Basin (ACF)

BUILDING STRONG ® Upper Chattahoochee Watershed 9 counties 1,034 square miles 60 square miles of that is the lake itself 2,240 miles of streams* 3,909 miles of roads** *USGS NHD dataset **TeleAtlas 2009

BUILDING STRONG ® Research Questions  How has land use changed in the watershed?  How much sediment has accumulated in Lake Sidney Lanier?  Is there a correlation between sediment accumulation and land-cover change in the Lake Sidney Lanier watershed?

BUILDING STRONG ® Study Area Selection  44 Sub-watersheds Drain to Lake Sidney Lanier  4 Selected, Based On: ► Sufficient Sedimentation Range data Max. Accumulation Max. Erosion No Change ► Visual Analysis of Land Cover Change New Neighborhoods More Roads Forested Areas Longwood Cove, Lake Sidney Lanier 130,000 cubic yards of silt removed

BUILDING STRONG ® Sediment Affects…  Recreation  Wildlife  Water Supply  Water Quality

BUILDING STRONG ® Sub-watershed Study Areas

BUILDING STRONG ® Study Area Summary USGS HUC ID: Size (acres) 14,79515,80613,35616,642 Location North end- Gainesville Southwest- Cumming Southeast- Flowery Branch Sedimentation Ranges 5434 Docks8561, Limited Development* (acres) 517 (4.6%)600 (3.8%)535 (4.0%)373 (2.2%) Protected* (acres) 506 (3.4%)668 (4.2%)266 (2.0%)507 (3.1%) Recreation* (acres) 125 (0.8%)849 (5.4%)476 (3.6%)516 (3.1%) *USACE Allocation Zones

BUILDING STRONG ® Data Discussion  Land cover ► Georgia Land Use Trends (GLUT, University of Georgia, Athens, GA) ► Collected 1974, 1991, 2005  Sedimentation Range ► Cross section bathymetric surveys ► Located in various creeks impounded by the reservoir ► Three data sets: 1956, 1983, 1990

BUILDING STRONG ® Land Cover Beaches, Dunes, Mud Open Water Low Intensity Urban High Intensity Urban Clear cut, Sparse Quarries, Strip Mines Deciduous Forest Evergreen Forest Mixed Forest Row Crops and Pasture Forested Wetland Non-forested Wetland-Fresh Sub-watershed HUC 808 Cumming, GA, 1991

BUILDING STRONG ® Data Discussion  Land cover ► Georgia Land Use Trends (GLUT, University of Georgia ► Collected 1974, 1991, 2005  Sedimentation Range ► Cross section bathymetric surveys across lake ► Located in various creeks impounded by the lake ► Three data sets: 1956, 1983, 1990

BUILDING STRONG ® SR#33A Survey, 1990 Sedimentation Ranges

BUILDING STRONG ®

Significant Dates for Project Data  1956 Sedimentation Range Survey, Baseline  1957 Lake Lanier filled to full pool  1974 Georgia Land Use Trends Cover  1983 Sedimentation Range Survey  1990 Sedimentation Range Survey  1991 Georgia Land Use Trends Cover  2005 Georgia Land Use Trends Cover

BUILDING STRONG ® Methods Land cover change ► Visual analysis ► Raster analysis Impervious surfaces Forested areas Urban/suburban areas Sediment Range ► Drastic increases or decreases in sediment ► Identify areas that have certain characteristics Strong increase Strong decrease No change How do the land cover and sediment range data correlate?

BUILDING STRONG ® Research Relevance  Effect of silt on lake operations ► Reduces hydropower capacity Minimal impact ► Effects recreation, wildlife Shallow water in marinas Turbid water in creeks and coves ► Can impact flood storage Estimated $2 billion in real estate between Buford Dam and Peachtree Creek  Effects municipal water supply ► Reduces water storage capacity ► Diffuser pipes become clogged ► Additional water treatment for turbid water (minimal on this lake)

BUILDING STRONG ® Research Relevance  Effect of silt on lake operations ► Reduces hydropower capacity Minimal impact ► Effects recreation, wildlife Shallow water in marinas Turbid water in creeks and coves ► Can impact flood storage Estimated $2 billion in real estate between Buford Dam and Peachtree Creek  Effects municipal water supply ► Reduces water storage capacity ► Diffuser pipes become clogged ► Additional water treatment for turbid water (minimal on this lake)

BUILDING STRONG ® Research Relevance  Effect of silt on lake operations ► Reduces hydropower capacity Minimal impact ► Effects recreation, wildlife Shallow water in marinas Turbid water in creeks and coves ► Can impact flood storage Estimated $2 billion in real estate between Buford Dam and Peachtree Creek  Effects municipal water supply ► Reduces water storage capacity ► Diffuser pipes become clogged ► Additional water treatment for turbid water (minimal on this lake) Flooding in Mableton, GA, September 2009 Map of home value below Buford Dam

BUILDING STRONG ® Research Relevance  Effect of silt on lake operations ► Reduces hydropower capacity Minimal impact ► Effects recreation, wildlife Shallow water in marinas Turbid water in creeks and coves ► Can impact flood storage Estimated $2 billion in real estate between Buford Dam and Peachtree Creek  Effects municipal water supply ► Reduces water storage capacity ► Diffuser pipes become clogged ► Additional water treatment for turbid water (minimal on this lake)

BUILDING STRONG ® Timeline 2009 ► July: Research Started ► August: Proposal Rough Drafts ► September: Online Proposal Presentation ► October: Start Research Analysis ► November: GIS Day Presentation ► December: Continue Research Analysis 2010 ► January: Draft Analysis Findings ► February 9-11: Final Presentation, USACE South Atlantic Division Ranger Conference in Savannah, GA ► March: Project Revisions ► April: Final MGIS Wrap-up ► May 15: Graduate ► June: Present Documents and Research Findings to USACE

BUILDING STRONG ® Thank you for your time! Questions?