JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3: Harmonizing technological aspects Wilhelm Petersen Helmholtz-Zentrum.

Slides:



Advertisements
Similar presentations
State University – Higher School of Economics
Advertisements

John A. Orcutt Deputy Director, SIO Ocean Observations Initiative NSF MREFC Chair, NSF/CORE DEOS Comm.
Assembly, May 2014 Oslo STATUS of WP 3 Wilhelm Petersen, Helmholtz-Zentrum Geesthacht
ECOOP Meeting March 14-21, 2005 ECOOP WP7 Pierre-Yves LE TRAON Better use of remote sensing and in-situ observing systems for coastal/regional seas Objective.
nd MonGOOS, Madrid, 2-4 October 2013 Second MonGOOS meeting The JERICO Consortium.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 WP4 HARMONIZING OPERATION AND MAINTENANCE METHODS Hellenic Centre for Marine Research.
Work Package 3 PROCEDURAL HARMONISATION FixO3 General Assembly 14 – 16 October 2014, Heraklion-CRETE George Petihakis, HCMR.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 WP1: A Common Strategy Pascal Morin (INSU) Ingrid Puillat (Ifremer) Dominique.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 JERICO WP2 Strengthening regional and trans-regional activities Henning Wehde.
EMECO-NOOS Planning Meeting June Background and Rationale Dave Mills Cefas.
Timo Tamminen, Seppo Kaitala, Jukka Seppälä I SYKE Lauri Laakso I FMI Kai Sørensen I NIVA Workshop on future strategies – NIVA HQ
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Wilhelm PetersenI HZGI 2013, June 18/19th I UPMC I Paris JERICO MID TERM REVIEW WP 3 Harmonizing technological.
Final General Assembly – Paris, France – September 19, 2014 FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 JERICO Kick-off meeting Maison de la Recherche PARIS 24 & 25 May 2011.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 JERICO PROJECT The contract management Overview By Dominique Guéguen / Ifremer.
World Meteorological Organization Working together in weather, climate and water WIGOS R-WIP-RA III José Arimatéa de Sousa Brito, RA-III Focal Point WMO.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 WP6 - Outreach.
George PetihakisI HCMRI 2013, June 18/19th I UPMC I Paris JERICO MID TERM REVIEW Wp 4 HARMONIZING OPERATION AND MAINTENANCE.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems WP8: Use case 1: Quality Analysis for Satellite Missions.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 30th september 2014 Duration 36 months – Periods : 2 (month.
The Preparatory Phase Proposal a first draft to be discussed.
JERICO A Joint European Research Infrastructure network for Coastal Observatories Glenn Nolan, Henning Wehde, Patrick Farcy, Stefania Sparnocchia and George.
Planning the infrastructure for marine monitoring and operational oceanography Lennart Funkquist Swedish Meteorological and Hydrological Institute Figures.
Final General Assembly – Paris, France – September 19, 2014 FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011.
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
EMI INFSO-RI EMI SA2 Report Quality Assurance Alberto Aimar (CERN) SA2 WP Leader.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 WP9: New Methods to Assess the Impact of Coastal Observing Systems Presented by.
1 JERICO WP10: JRA Emerging technologies (Improve system components) Glenn Nolan, Antoine Gremare.
Speaker I Organism I adresse mail 5 to / Oslo / Norway 2 nd General Assembly – NIVA HQ WP5: DATA MANAGEMENT AND DISTRIBUTION.
The role of gliders in sustained observations of the ocean Deliverable 4.1 or WP 4.
MARINERA Marine ERAnet European Research Area Identify research infrastructures Promote exchange between research teams in and outside Europe Organise.
1 st -4 th December st BioXHIT Annual Meeting WorkPackage 5.2: Implementation of Data management and Project Tracking in Structure Solution Peter.
Final General Assembly – Paris, France – September 19, 2014 FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011.
MyOcean2 First Annual Meeting – April 2013 WP 15 THEMATIC & ASSEMBLY CENTRE for In Situ MyOcean2 First Annual Meeting – Cork /16-17 April 2013.
MRI Expert Group JERICO A Joint European Research Infrastructure network for Coastal Observatories.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 30th september 2014 Duration 36 months – Periods : 2 (month.
WP5: DATA MANAGEMENT AND DISTRIBUTION Overview and Status: months Caterina Fanara 1, Loic Petit De La.
Loïc Petit de la Villéon I IFREMER I WP 7: Service and data access Mid-term review: june , June 18/19.
Henning Wehde I IMR I 2013, June 18/19th I UPMC I Paris JERICO MID TERM REVIEW Wp 2 Strengthening regional and trans-regional.
ISTANBUL UNIVERSITY RECTORATE INSTITUTE OF MARINE SCIENCES AND MANAGEMENT (Postgraduate Institute)
Project preparation workshop “Bringing a transnational project to life” Project idea “Challenges and chances from Climate Change for regional and local.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 WP 7 SERVICES AND DATA ACCESS.
® GEOSS AIP 5 Water SBA Update HDWG June 2012 Matt Austin NOAA Stefan Fuest KISTERS Jochen Schmidt NIWA.
Speaker I Organism I adresse mail Date I City I Land Future Strategy for Coastal Observatories From National programme to a pan European.
Henning Wehde I IMR I 5 to / Oslo / Norway 2 nd General Assembly – NIVA HQ WP 2 Strengthening regional.
Speaker I Organism I adresse mail GA & BPW I Heraklion I Crete – Greece WP 1: A common stategy P. Morin, D. Durand, P. Farcy and.
Rafael Rodríguez Clemente. Coordinator* *Estación Biológica de Doñana, CSIC. Sevilla (Spain) MoCo Meeting, Casablanca (Morocco)
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
Sensor Web Enablement (SWE) developments for fixed monitoring platforms and research vessels By Dick M.A. Schaap – SeaDataNet Technical Coordinator with.
Click to edit Master title style Click to edit Master text styles Second level Third level Fourth level Fifth level 1 SI O S Svalbard Integrated Arctic.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 JERICO Overall WP presentation.
INTRODUCTION TO GENERATING SERVICES
WP5: In Situ Monitoring This project has received funding from the European Union's Horizon 2020 research and innovation programme under grant agreement.
Work Package 2 TECHNOLOGICAL HARMONISATION Reporting period
WP5: In Situ Monitoring This project has received funding from the European Union's Horizon 2020 research and innovation programme under grant agreement.
FP7-Infra : Design studies for European Research Infrastrutures
Flanders Marine Institute (VLIZ)
SIOS (Svalbard Integrated
Presenter Organisation(s)
World Cover 2017 Conference
Patrick Farcy, Simon Keeble, Aldo Drago
Year-round data access from sensors on 1 m and 60 m seawater lines
Pier Giorgio Marchetti, Philippe Mougnaud European Space Agency
RECARE set-up Rudi Hessel on behalf of coordination team
Animal-Borne Instrument Task Team ABI TT Terms of Reference
AWS Network Requirements Analysis and Network Planning
Institut Français de Recherche pour l'Exploitation de la Mer
Task Manager & Profile Interface
WP7 – Related activities
Presentation transcript:

JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3: Harmonizing technological aspects Wilhelm Petersen Helmholtz-Zentrum Geesthacht (HZG) Institute of Coastal Research

JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3: Harmonizing technological aspects General Objectives: To provide a common base for the operational use of FerryBoxes, gliders, fixed platforms along European coasts To review the current status of existing systems in operational use in European seas To define the best technical practices for compatible, robust and cost-effective systems To define procedures for harmonizing and merging quality assessed FerryBox and Fixed Platform data at regional (ROOS) level To define procedures and technological solutions for integration and testing of new sensors on these systems

JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP 3: Task 3.1 FerryBox Objectives: review current status of existing FB systems (e.g. sensors, quality control,data handling): review best technical practices of the existing FB systems harmonize the resulting data provide technological solutions to integrating new sensors (from WP10) into FBs define consensual procedures for using FerryBox data in validation of earth observation data Tasks: 3.1.1: Review current status of existing FB systems (flow-through systems, sensors, quality control, data handling) 3.1.2: Best practice of FB systems (flow-through system, sensors, operation procedures, antifouling, control mechanisms, data handling) 3.1.3: Harmonization and merging quality assessed data from FB systems in ROOS regions 3.1.4: Test and integration of new sensors and best practices (tightly linked to WP10.

JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP 3: Task 3.2 Gliders Objectives: Review the current status of the existing glider fleet in operational use in European seas. Define the best technical practices for operation of a fleet of gliders (general strategies for glider operation in coastal and shallow areas, implementation of tools for path planning…) Tasks: Review current status of glider operations in Europe (in coordination with the Gliding Observatories network) Define the best technical practices for operation a fleet of glider

JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP 3: Task 3.3 Fixed Platforms Objectives: reviewing the current status of existing systems in operational use in Europe defining best technical practices for compatible, robust and cost-effective systems on a variety of fixed platforms defining procedures for harmonizing and merging quality-assessed high- frequency in situ data across regional seas (e.g. the North Sea) identifying gaps in the present coverage proposing technological solutions for the integration and testing of new sensors on fixed platforms sharing data with mobile platforms and remote sensing to create new integrated products

JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP 3: Task 3.3. Fixed Platforms (continue) Tasks: Review of the current status of all existing fixed observing sites in European waters best practice of fixed platform technology Harmonization and merging quality assessed data from fixed platform systems in ROOS regions Comparison of new sensors and assessment of their applicability for fixed platforms (strong relationship to WP10)

JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP 3: Deliverables & Milestones Deliverables D 3.1: Report on current status of FerryBox systemsM09 D 3.2: Report on current status of gliders observatoriesM15 D 3.3: Review of current marine fixed instrumentationM21 D 3.4: Report on new sensor developmentsM36 D 3.5: Conclusion reportM42 Milestones: MS28Report on activitiesM42

JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 Contributions of partners to WP3 partners in total: 17 budget: ~550 T€ total personal month: 105

JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 Task leaders: Task 3.1 FerryBox: NERC (David) & NIVA & SYKE Dominique & Seppo Task 3.2 Glider:CSIC (Simon) Task 3.3. Fixed Platform: CNR (Stefania) Task 3.x.3 test & application of new sensors: HZG (Willi)

JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP 3: Task 3.1 FerryBox Action (working plan) first year: FerryBox (responsible David Hydes): 1. review current status FerryBox : – questionnaire WP4 <> WP3 WP2 –  D 3.1. report status FerryBox (M09 = Jan 2012) 2. review best practise entire infrastructural chain of data acquisition from: sensor (performance, robustness, accuracy, etc.) to supporting system (cabling, electric and electronic components, critical sub systems such as debubbling, pumping, etc.). WP3 WP4 –First Workshop on 30 – 31. August 2011 (connected to 4 th FB- Meeting (1-2 Sept at HZG) Organizer: David, Willi, support by Seppo & George?

JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP 3: Task 3.2 Glider Action (working plan) first year: Glider (responsible Simon Ruiz): Review current status of glider operations in Europe via questionaire, workshop? ( in coordination with the Gliding Observatories network)  D 3.2. report status glider (M15 = Jul 2012)

JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP 3: Task 3.3 Fixed Platforms Action (working plan) first year: Fixed Platform (responsible Stefania Sparnocchia): review current status of all existing fixed observing sites –questionnaire (merged with the FB questionnaire) WP3 WP2 including stations outside of consortium subdivided by the different ROOS’s review best practise –Planning a Workshop WP3 WP4 (first months 2012?)  D 3.3. report status fixed platforms (M21 = Jan 2013)

JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP 3: Task New Sensors Action (working plan) first year: New Sensors (responsible Willi Petersen): Status of application of new sensors WP3 WP10 Output of questionnaire assessment of their applicability for FerryBox and fixed platforms (+ Gliders??). –Which new sensors are available –Suitability for unattended operation (sort of platform) –Requirements for unattended operation (power consumption, maintenance, data handling) – biofouling aspects (WP3 WP4)

JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3: Time table for the entire project

JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3: Time table until 2012

JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3: open questions Overlap WP3  > WP4 Connection to WP10 (e.g. defining standards, protocols, QA for new sensors)

JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 First steps: 1st draft of a common (WP 2, 3 and 4) questionaire (together with WP2 and WP4) (first focused on FerryBox activities): WP2 : Institutions List of platforms (question: which stations should be involved (definition of what belongs to coastal systems) Contact Parameter Public access

JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 cont. 1st draft questionaire WP3 & WP4: Standard Sensors/Parameter: –Type of sensors, experiences –Experimental parameter (new sensors  WP10) New Sensors/Parameters –parameter –status (experimental, pre-operational…) –experiences Resolution in space and time –FB: –frequency of data sampling  spatial resolution (in case of FB) –repetition rate of transects on the route –Fixed stations –frequency of data sampling –covered time period

JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 cont. 1st draft questionaire Quality assessment (sorted by parameter) methods of QA frequency of calibration checks frequency of taking reference samples real-time (automatic) data quality checks (e.g. tests of outlier, gradient ….) post processing, how data are corrected visibility of QA for external users (e.g. flags and/or metadata) Data handling: data transfer (real time or in harbour, automatically, manually …) data storage (files, database …) public access of data, WP4 specific: Calibration Facilities …

JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3: Personal month per partner

JERICO KICK OFF MEETING WP 3PARIS – Maison de la recherche - 24 & 25 May 2011 WP3 Links