Alignment Software from the ME perspective Marcus Hohlmann Florida Tech Muon Alignment meeting during CMS week - CERN, March 15, 2005.

Slides:



Advertisements
Similar presentations
R. Lee CMS EMU Alignment: 28 Feb, COCOA Simulation and Study of the EMU Alignment System Robert Lee CMS Endcap Alignment Muon EDR 28 February 2002.
Advertisements

Slice Test DAQ. Two Systems Underway There are essentially two systems being designed concurrently: Trackfinder test, and EMU slicetest. Goals of the.
1Malcolm Ellis - Tracker Meeting - 18th May 2006 Reconstruction Plans  Staged process of building up Reconstruction over the rest of this year  Will.
1 James N. Bellinger 4-Feb-2009 ME+1 status and Endcap Z James N. Bellinger University of Wisconsin at Madison 4-Feb-2009.
Skeleton: Hardware Alignment for EMU meeting James N Bellinger 15-Mar-2009.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
US Test beam data analysis & validation of OSCAR/ORCA Tim Cox, UC Davis Nikolai Terentiev*, CMU CMS Physics Week Fermilab Apr , 2005.
Hardware activity at SX5 including detector alignment for the next three years Valery Andreev UCLA October 9-10, 2006 UCLA DOE review, task L.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
US LPC Muon Group CMSSW code development efforts N. Terentiev Carnegie Mellon University CMS EMU Meeting, Florida Institute of Technology February 17-18,
US News from the LPC Muon Group E. James, M. Mulders, N. Terentiev* CMS EMU Meeting University of California, Davis Feb , 2005.
S. Gibson FSI Offline Analysis 9 th October FSI Alignment: Offline Analysis Overview ATLAS Group, University of Oxford Stephen Gibson, Danny Hindson,
Kaori Maeshima (FNAL), Muon Alignment EDR: FEB. 28, Endcap Alignment EMU Alignment DAQ Muon Alignment EDR Feb. 28, 2002 Outline: 1.Components to.
Chamber Calibration Bench Status Barrel Muon Alignment Group 9 April 2003, J MocholíWorkshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy.
MUON Alignment DAQ (Overview), EDR Feb Kaori Maeshima MUON Alignment DAQ (overview) Often a question is asked: Do we have a single DAQ program.
US CMS DOE/NSF Review: May 8-10, Endcap Alignment Dick Loveless DOE/NSF Review 9 May 2001.
Muon Endcap Alignment Software & Calibration February 2006 Muon Endcap Alignment Software & Calibration February 2006 Samir Guragain, Marcus Hohlmann Florida.
Analog Alignment Sensors Status report – April 2004 Marcus Hohlmann Florida Tech.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
Calibration of clinometers for the alignment of muon chambers in the CMS experiment. Thomas MOSCHOUTIS, Marion RIPERT and Georgia KARAGIORGI with Dr HOHLMANN.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
Muon Endcap Alignment Analog Sensor Calibrations & Software Update Samir Guragain, Marcus Hohlmann Florida Tech October 2005 USCMS EMU meeting – Fermilab,
4/20/02APS April Meeting1 Database Replication at Remote sites in PHENIX Indrani D. Ojha Vanderbilt University (for PHENIX Collaboration)
Muon LPC Meeting, 14 Sep Overview of Muon PRS Activities Darin Acosta University of Florida.
Goal : Setup and monitor “chambers” with resolution of < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line 1 Transfer Line 1 Transfer Plate.
Some Thoughts about Hits, Geometry etc Rob Kutschke, Hans Wenzel Fermilab March 13, 2007.
G4MICE Status and Plans 1M.Ellis - CM24 - RAL - 31st May 2009  Firstly, a correction to the agenda:  I failed to spot a mistake in the agenda that I.
Goal : Setup and monitor “chambers” with resolution of  < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line (2 Laser Redundancy) 1 Transfer.
First Reconstruction Results on the Alignment of Muon Endcap Chambers in the CMS Experiment at CERN S. Guragain, G. Baksay, M. Hohlmann Florida Tech 74.
Calibration of Analog Sensors for the Alignment of Muon Chambers in the CMS experiment Marion Ripert, Georgia Karagiorgi, Thomas Moschoutis Dr. L. Caraway,
1 James N. Bellinger University of Wisconsin-Madison 27-November-2009 Status of Transfer Line Reconstruction James N. Bellinger 27-November-2009.
Status and Plans of the Vienna ILD Software Group (a short update) Winfried Mitaroff ILD Software Web Meeting 26 May 2010.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
1 MuonGeoModel status report focus on issues relevant to , 20 Access to Condition DB with M. Verducci, R. Harrington MDT deformations with I. Logashenco.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
GEM Detector R&D at Florida Tech – “Get to know each other” –
Online System Status LHCb Week Beat Jost / Cern 9 June 2015.
Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, Endcap Alignment Status of Offline Software Alignment CERN 17, 18 May 2001.
1 Outline: Update on muon/dimuon AOD production (R. Arnaldi/E. Scomparin) Other ongoing activities: MUON correction framework (X. Lopez) MUON productions.
November 11 SESAPS 2006 Samir Guragain 1 Calibration, Installation & Commissioning of Sensors for the Alignment of Muon Endcap Chambers in the CMS Experiment.
Chamber Alignment Pins Δy = y PG – y nom. vs. Δx = x PG – x nom. M. Hohlmann 1, G. Baksay 1, S. Guragain 1, J. Bellinger 2, D. Carlsmith 2, F. Feyzi 2,
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Alignment Meeting, CERN, Sept 19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field.
1 James N. Bellinger University of Wisconsin-Madison 2-February-2011 Status and Plans for Endcap Hardware Alignment James N. Bellinger 2-February-2011.
CHEP’06 COCOA 1 Cms Object-Oriented Code for Optical Alignment Pedro Arce (CIEMAT), Michael Case (U. California Davis) CHEP 2006, Mumbai, 13-17th February.
Software for the CMS Cosmic Challenge Giacomo BRUNO UCL, Louvain-la-Neuve, Belgium On behalf of the CMS Collaboration CHEP06, Mumbay, India February 16,
Simulation of the CMS Endcap Alignment Scheme Using COCOA.
1 James N. Bellinger University of Wisconsin-Madison 13 February 2008 Cocoa Plans.
1 James N. Bellinger University of Wisconsin-Madison 13-August-2010 Endcap Processing Notes James N. Bellinger 13-Aug-2010.
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
EMU Meeting, CERN, Sept 18-19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field up.
USCMS May 2002Jim Branson 1 Physics in US CMS US CMS Annual Collaboration Meeting May 2002 FSU Jin Branson.
1 James N. Bellinger University of Wisconsin-Madison 15-March-2009 Hardware Alignment.
Marco Cattaneo, 3-June Event Reconstruction for LHCb  What is the scope of the project?  What are the goals (short+medium term)?  How do we organise.
Fork Calibration Barrel Muon Alignment 9 April 2003, Z. Szillási Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 1 Calibration.
Status of Detector Characterization a.k.a. Calibration & Monitoring Project Year 2 objectives ( → Mar ‘04) 1. Calibration plan (first draft in March.
CMS Status & Commissioning Menu: 1 Recent Progress Commissioning Prior to and After First Beam Commissioning with first LHC Events Outlook Wolfgang Funk.
Pierre-François Giraud, Muon Alignment Meeting1 Status of the barrel alignment system Pierre-François Giraud CERN.
James Bellinger, December CMS Week Muon Alignment James N. Bellinger University of Wisconsin at Madison 5-December-2006 DCOPS Data from MTCC2.
CMS ROC Report Patricia McBride May 26, 2005.
GEM DAQ-Chamber Integration Test Stand for GE2/1 & ME0 at Florida Tech
EMU Alignment DAQ Endcap Alignment Muon Alignment EDR Feb. 28, 2002
Status and Plans for Endcap Hardware Alignment
Transfer Line and CSC Rφ Reconstruction
Status of Transfer Line Reconstruction University of Wisconsin-Madison
University of Wisconsin-Madison
GAUSS Work plan Software Week 6 March 2002 F.Ranjard / CERN.
University of Wisconsin-Madison
CMS Week Muon Alignment
Agenda SICb Session Status of SICb software migration F.Ranjard
Presentation transcript:

Alignment Software from the ME perspective Marcus Hohlmann Florida Tech Muon Alignment meeting during CMS week - CERN, March 15, 2005

3/15/2005 M. Hohlmann - Muon alignment meeting, CMS week, CERN, March 15, Purpose of this talk Brief update on activities at Florida Tech on ME alignment (hardware & software) Make contact with barrel and link people to coordinate work on software side: –Database work: framework, define data,… –Handling of calibration data –Running COCOA –Getting ready for magnet test

3/15/2005 M. Hohlmann - Muon alignment meeting, CMS week, CERN, March 15, Reminder: EMU geometry and optical alignment ( DCOPS ) COCOA v2.0 (from R. Lee’s thesis) DCOP sensors SLMs Transfer plates and lasers

3/15/2005 M. Hohlmann - Muon alignment meeting, CMS week, CERN, March 15, EMU geometry and analog alignment sensors Future version of COCOA being developed at Fl. Tech R-sensors Z-sensors Note: only small sample of sensors shown Clinometers

3/15/2005 M. Hohlmann - Muon alignment meeting, CMS week, CERN, March 15, Our Tasks Fl. Tech has agreed to the following tasks: –Calibrate 200+ ME analog sensors (R, Z, Clino.) –Incorporate calib. data into appropriate data base –Develop COCOA so that analog sensors are included for EMU –Help to set up and maintain data base for alignment constants that feed into reconstruction –Use COCOA to produce alignment constants for ME magnet test ME commissioning and first data

3/15/2005 M. Hohlmann - Muon alignment meeting, CMS week, CERN, March 15, Calibration bench: R, Z 4 types of prod. plates 2 types of prod. towers R-sensor: wire extension pot. R-sensor Z-sensors Linear mover dowel pins for DCOP sensors Stand

3/15/2005 M. Hohlmann - Muon alignment meeting, CMS week, CERN, March 15, Calibration bench: Clinometer Mirror Clinometer

3/15/2005 M. Hohlmann - Muon alignment meeting, CMS week, CERN, March 15, Typical Calibration Data Fit line: V(x) = ax + b V(x) = x – σ(a) = σ(b) = Absolute R-Sensor Response vs. Distance: V(x)

3/15/2005 M. Hohlmann - Muon alignment meeting, CMS week, CERN, March 15, Example of Calibration Record => This needs to find its way into a calibration data base: How exactly ?

3/15/2005 M. Hohlmann - Muon alignment meeting, CMS week, CERN, March 15, Progress with COCOA Fl. Tech students installed and use COCOA v3.2.1 on Fermilab UAF cluster (with much help from Pedro Arce and Robert Lee - thanks !!) –Generated reasonable outputs for example geometries –Reproducing COCOA simulation of ISR test –Incorporating analog sensors as “distance meters” –Next: Run realistic SLM on road to aligning full ME Problems to be worked out –Often encountering singular matrices and failed fits –Visualization using IGUANA not working yet

3/15/2005 M. Hohlmann - Muon alignment meeting, CMS week, CERN, March 15, My simplistic view Feeding ME alignment data into reconstruction Optical & analog sensor data in some database COCOA MB Link ME Some form of Alignment data base ORCA reconstruction what data exactly ? what format ? what data base framework ? update frequency ? … CSC geometry data TRACKS Questions that I have for people from Link & Barrel alignment groups: ? ?

3/15/2005 M. Hohlmann - Muon alignment meeting, CMS week, CERN, March 15, Need communication! Have tried to find out current status, plans, and people involved in corresponding data base and software tasks for Link and Barrel over last month: –Not very successful… –Either I haven’t found the right people yet, or nobody is working on this (which I can’t believe) –If you are the “right” person to talk to, please contact me: fit.edu We are willing to help with the software and data base work, but we need to “get in the loop” to be of help to the alignment group. I could meet in person with people coming to CMS Physics week at FNAL (April 11-13) to talk ! Thanks!