MUON Alignment DAQ (Overview), EDR Feb. 28 2002 Kaori Maeshima MUON Alignment DAQ (overview) Often a question is asked: Do we have a single DAQ program.

Similar presentations


Presentation on theme: "MUON Alignment DAQ (Overview), EDR Feb. 28 2002 Kaori Maeshima MUON Alignment DAQ (overview) Often a question is asked: Do we have a single DAQ program."— Presentation transcript:

1 MUON Alignment DAQ (Overview), EDR Feb. 28 2002 Kaori Maeshima MUON Alignment DAQ (overview) Often a question is asked: Do we have a single DAQ program or 3 separate DAQ programs for each subsystem? Our approach to answer above question is: 1.Keep the DAQ modular for maximum efficiency (Hardware and FE of each subsystems are different. Avoid unnecessarily large overhead.). 2.Be sure the common issues are addressed and coordinated in order to achieve coherent operation in the CMS experiment.

2 MUON Alignment DAQ (Overview), EDR Feb. 28 2002 Kaori Maeshima Outline 1.Contact people for DAQ in each subsystem 2. Brief review of each subsystem readout scheme 3.Common Issues 4.Schedule and plan

3 MUON Alignment DAQ (Overview), EDR Feb. 28 2002 Kaori Maeshima Contact people and brief review of each subsystem readout plan 1.Barrel: J.Molnar, D.Novak (see G.Bencze’s talk in the barrel session for more details). 2.Link: I.Vila (See A.L.Virto’s talk in the link session for more details) 3.EMU: K. Maeshima (see K.Maeshima’s talk in the EMU session for more details)

4 MUON Alignment DAQ (Overview), EDR Feb. 28 2002 Kaori Maeshima Barrel Readout Scheme HUB (MAB) #1 BC #6BC #1 SCADA MAB Workstation … Cam #1 Cam #24 Video HUB (MAB) #6 HUB (Wheel) 10/100 Ethernet (Optic al) 10/100 Ethernet (Optical) 10/100 Ethernet (Twisted pair) BC #36BC #31 … Control room Exp. Hall BC = Board computer Wheel -2Wheel +2 LED-s Tilt sensor Flat Cam #1 Cam #24 Video LED-s Tilt Flat sensor Tw. pair Tw. pair

5 MUON Alignment DAQ (Overview), EDR Feb. 28 2002 Kaori Maeshima DetectorBalconiesCavern CAN Controller /SCADA Node Laser ELMB Temperature ELMB CMOS Driver Board LEB Tiltsensor ELMB Signal Cond. Potentiometer ELMB Optical ELMB Signal Cond. Hardware components location Link Readout Scheme

6 MUON Alignment DAQ (Overview), EDR Feb. 28 2002 Kaori Maeshima L1 E3E3 L2 L3 E4 Line YB+2 L4 E5 L5 L6 E6 Line YB-2 L7 E7 L8 L9 Line YE+1 L10 E8 L11 L12 Line YE-1 L13 L18 L14 L15 L16 E10 E9 E11 L17 Line YN+1 L19 L24 L20 L21 L22 E13 E12 E14 L23 Line YN-1 E15 E16 Line Laser CAN CONTROLLER/SCADA Node CMS ETHERNET LAN E1 E2 Line YB0 ALIGNMENT PRIVATE LAN Canbus lines and daq architecture Link Readout Scheme (cont.) L: LEB E: ELMB

7 MUON Alignment DAQ (Overview), EDR Feb. 28 2002 Kaori Maeshima EMU Readout Scheme

8 MUON Alignment DAQ (Overview), EDR Feb. 28 2002 Kaori Maeshima Common Issues 1.Synchronization of the data taking 2.Data exchange among the 3 alignment subsystems. 3.Common framework for an alignment reconstruction program (COCOA) and Interface - how the muon chamber alignment results being used (data storage, data accessing, issues): –CMS muon chamber geometry and offline muon track reconstruction. (see P.Arce’s talk for more details) 4.Operation and Monitoring Comment: Use of the CMS DCS system solves much of above issues.

9 MUON Alignment DAQ (Overview), EDR Feb. 28 2002 Kaori Maeshima DATA Flow (Conceptual) Readout for the Barrel Alignment devices with DCS interface COCOA for the Barrel chambers positions Geometry of ORCA for the muon reconstruction Readout for the Link Alignment devices with DCS interface Readout for the EMU Alignment devices with DCS interface COCOA for the Link information COCOA for the EMU chambers positions

10 MUON Alignment DAQ (Overview), EDR Feb. 28 2002 Kaori Maeshima DAQ Plan for the Magnet Test 2004 Should be able to read out the full Link and EMU alignment subsystems and the barrel magnet test setup. The software must be developed enough that during the magnet test we can have fast feed-back from the data taken. This means: –Interface must be ready such that raw data from DAQ and other necessary data (calibration, etc.) can be readily converted into input format of COCOA. – COCOA should run in a timely manner to give us the fast feed-back on the position/movement of chambers.

11 MUON Alignment DAQ (Overview), EDR Feb. 28 2002 Kaori Maeshima Barrel Setup for the Magnet Test 2004 10 MAB Board Computers to control the MAB-s 1 MAB workstation to communicate with the MAB board computers to communicate with the chamber part (DCS function) 5 Board computer hardware configurations with special software to control the LED-s on the muon chambers (minicrate function)

12 MUON Alignment DAQ (Overview), EDR Feb. 28 2002 Kaori Maeshima Summary and Plan 1.Design of each subsystem DAQ has been worked on and being tested, keeping in mind that there are some common issues (DCS interface, etc.) must be addressed. 2.Implementation should follow. 3.milestone: Magnet test 2004 – deliver the operational system in the 1 st order. 4.Continue to implement and deliver the final muon alignment DAQ system for the installation/commissioning of the alignment system and the CMS experiment with good monitoring system and documentation for the long term operation to follow. (see each subsystem report for more detailed schedule)


Download ppt "MUON Alignment DAQ (Overview), EDR Feb. 28 2002 Kaori Maeshima MUON Alignment DAQ (overview) Often a question is asked: Do we have a single DAQ program."