Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.

Slides:



Advertisements
Similar presentations
TORE SUPRA Association EURATOM-CEA 1 TORE SUPRA Association EURATOM-CEA Julien WAGREZ EFDA GOTP - ITER PPE WP2 1 juin 2009 EFDA ITER - Goal Oriented Training.
Advertisements

April 23-24, 2009/ARR 1 Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL A. René Raffray, Siegfried Malang, Xueren Wang University of California,
Structural and Failure Analysis Cost & Risk Assessment Shahram Sharafat TBM Cost Estimate Meeting UCLA Dec , 2005.
FIRE Vacuum Vessel and Remote Handling Overview B. Nelson, T. Burgess, T. Brown, D. Driemeyer, H-M Fan, K. Freudenberg, G. Jones, C. Kessel, P. Ryan, M.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
The shield block is a modular system made up of austenitic steel SS316 LN-IG whose main function is to provide thermal and nuclear shielding of outer components.
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
1 FIRE Engineering Summary Phil Heitzenroeder for the FIRE Engineering Team Presented to the FIRE Physics Validation Review Committee March 30, 2004.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
TORE SUPRA Association EURATOM-CEA 2 nd GOTA-PPE meeting Julien WAGREZ 1 06 December 2009 EFDA ITER - Goal Oriented Training Program Port Plug Engineering.
ASIPP EAST Overview Of The EAST In Vessel Components Upgraded Presented by Damao Yao.
From Research Prototype to Production
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
SC Project Review of NCSX, April 8-10, 2008 NSCX Poloidal Field Coils Michael Kalish.
Page 1 of 11 An approach for the analysis of R&D needs and facilities for fusion energy ARIES “Next Step” Planning Meeting 3 April 2007 M. S. Tillack ?
ILO Meeting #26 Ongoing and forthcoming Procurement activities 29 th September San Sebastian F4E Market Intelligence group - ILO Meeting #26 – 29th.
ARIES Project Meeting, L. M. Waganer, Dec 2007 Page 1 Restructuring System Cost Accounts and Algorithms L. Waganer December 2007 ARIES Project.
Chapter 12: Systems Investigation and Analysis. Agenda  How to Develop a CBIS?  Systems Development Life Cycle (SDLC)  Prototyping  Join Application.
US ITER UFA Meeting APS-DPP Savannah, GA Ned Sauthoff (presented by Dale Meade) November 15, 2004 US In-kind Contributions and Starting Burning Plasma.
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept , EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
IFE Plant Structural Concepts Including Shielding and Optical Stability Requirements Thomas Kozub, Charles Gentile, Irving Zatz - PPPL.
1 WBS 1 Design Analysis Status NCSX Analysis Meeting Dec 3, 2003.
From the Installation and Certification Group to the Engineering and Development Section Patrick Grenard Chief, Engineering & Development, IMS Vienna International.
Defining the Vacuum Vessel Geometry NCSX Project Meeting November 27, 2002 Art Brooks.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
NCSX NCSX Design Review Guide May 27, 2005 Wayne Reiersen NCSX.
SC Project Review of NCSX, April 8-10, 2008 NCSX Coil Services P.L. Goranson Work Package 161.
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
Cmpe 589 Spring 2006 Lecture 2. Software Engineering Definition –A strategy for producing high quality software.
1 Homes take DUSEL NSF Preliminary Baseline Review - April 13-15, 2010 Bob Altes Engineer- ISE Water Shield Engineering Figure Courtesy PDG and LBNL Homestake.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
ITPA12 Diagnostics - PPPL - 3/26-30/07 1 US ITER Project Plans David Johnson Diagnostics Team Leader March 26, 2007 ITPA12 Design Basis US Scope Port Plugs.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
NSTX Response to the Lessons Learned Report NSTX TF Coil Repair Review September 3-4, 2003 Al von Halle.
National Spherical Torus Experiment Upgrade (NSTX-U) Princeton Plasma Physics Laboratory (PPPL) Joseph V. Minervini October 29, 2009 Review Committee On.
ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 1 Maintenance and Building Conceptual Approach L. Waganer and R. Peipert The Boeing Company 4 October.
FIRE Engineering John A. Schmidt NSO PAC Meeting February 27, 2003.
December 13, 2006 Blanket and Shield Design Considerations for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M. Sawan (UW), A.R. Raffray.
Engineering Operations Outage Schedule Center Stack casing is scheduled to go back in the vessel today Complete NB armor, Diagnostic calibrations, clean/photo/close,
SC Project Review of NCSX, April 8-10, 2008 NCSX Cryogenics Systems WBS-62 Steve Raftopoulos NCSX Cryogenic Systems WBS(62) Manager.
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Power Upgrade Project SNS September 21-22, TBM Cost Estimate Cost Estimate Schedule Approach Tom Mann October 27, 2005.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
A View of NCSX Structural System and Load Path for the Base Support Structure.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
Engineering Operations Outage Status: New shielding of HHFW/in-vessel components has been completed. Fit-ups of OH bus lead upgrades to reduce error fields.
12/19/2006Mike Viola1 December Lehman Review December 19, 2006 Mike Viola Field Period Assembly Manager NCSX Field Period Assembly + + =
NCSX VVSA / MCWF FDR A Systems Engineering Perspective Wayne Reiersen Bob Simmons NCSX VVSA / MCWF FDR May 19-20, 2004 PPPL.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
MICE Coupling Coil Test Proposal Ruben Carcagno Fermilab July 9, MICE CC Test Proposal7/11/2011.
Long-Baseline Neutrino Facility LBNF Beamline optimization schedule Vaia Papadimitriou LBNF Beamline Manager Accelerator and Beam Interface Group Meeting.
Office of Critical Decision-1 Approve Alternative Selection & Cost Range or Brief Presented by:
LBNE Remote Handling Layout Options Adam Carroll Van Graves Tom Burgess FNAL/ORNL Videoconference March 11, 2010.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Camera PDR/CD1 Planning 19 September 2008
Supportability Design Considerations
News and brief overview of Beamline plans for the next few months
Preparations for a Lehman Review
Experimental equipment Edgar L. Black February 17, 2019
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
as a prototype for Super c-tau factory
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Presentation transcript:

Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004

Outline Conceptual Design Requirements History Issues to be addressed during Conceptual Design Conclusions

Requirements for Conceptual Design The two sources of requirements for completion of conceptual design are: –The DOE Critical Decision process –Engineering requirement to initiate Preliminary Design

Mission Need Review (CD-0) Key review elements for a Mission Need Review are: –Mission Need Statement. Assess adequacy of documentation confirming that the new project provides a specific capability that the Department currently lacks to meet its assigned mission. –Program/Mission Requirements. Assess whether high-level requirements are sufficiently defined to identify potential alternatives (to be analyzed in the next phase) that are both applicable and capable of meeting project goals. –Total Project Cost and Schedule Ranges. Review basis of the rough order of magnitude cost range and provide an assessment of whether this range reasonably bounds the cost and schedule of alternatives to be analyzed in the next project phase. Review basis of schedule range and assess whether the schedule is consistent with strategic requirements for when this project is required. Also, for projects closely linked to other projects, assess whether schedule results in appropriate integration.

CD-1 Documentation Conceptual Design Report - Alternative Analysis, Hazard Analysis, Site Selection Criteria, NEPA Documentation, Systems Requirements, cost and schedule estimates Risk Management Assessment Safety Documentation Acquisition strategy

Requirements to Initiate Preliminary Design Subsystem Requirements Feasibility –Is there a design solution within the allotted envelopes? Cost (range) Schedule

Sliding Joint PF Coils OH Coil Vacuum Vessel TF Coil Inner Leg Assembly TF Coil and Case Dewar

Conceptual Design Issues - Magnets Solenoid leads Elbrodur fatigue Welding R&D Insulation R&D

Conceptual Design Issues - PFC’s Time dependent forces With transient thermal Connected to the vessel Startup with passive plates Magnetic detectors with passive plates First wall cooling for AT operation

Conceptual Design Analysis - VV Plastic analysis Limit analysis Optimized geometry and refined FEA models Dynamic analysis Fatigue analysis, including plastic effects Seismic analysis

Conceptual Design - VV –Develop design of generic port plug –Optimize divertor attachments for stress, remote handling –Design internal plumbing and shielding –Re-design / optimize gravity supports

Conceptual Design R&D - VV –Select/verify method for bonding of copper cladding to vessel skin –Select/verify method for routing of cooling passages into and out of cladding –Develop fabrication technique for in-wall active control coils –Perform thermal and structural tests of prototype vessel wall, with cladding, tubes, tiles, etc. (need test facility) –Verify assembly welding of octants and tooling for remote disassembly/reassembly (need test facility)

Remote Maintenance Conceptual Design Many in-vessel remote handling system designs and procedures remain to be developed in concert with components –Divertor module remote attachment and handling interface –FW tile and limiter module attachment, handling end-effector and interface –Standardized midplane port assemblies and handling systems –Upper and lower auxiliary port assemblies and handling systems –In-vessel inspection (metrology & viewing) system deployed via midplane port Ex-vessel and hot cell remote handling systems have less design development –Component transfer casks, transport and positioning at ports (crane vs air cushion, how are casks positioned at upper auxiliary ports?) –Upper and lower vertical ports are currently being fitted with diagnostics but can they be maintained? –Hot cell layouts, remote handling systems and component repair stations

Conclusions The FIRE design is well positioned to complete the engineering required for Conceptual Design. The biggest effort will be in Remote Maintenance - both design and initiating R&D. It should be relatively straight forward to complete Conceptual Design in about nine months given approval of CD-0 and adequate funding.