Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12.

Slides:



Advertisements
Similar presentations
M. Ross Project Advisory Committee Review 13 December, 2012 KEK Main Linac Layout – Two variants for two different types of sites GDE PAC Review.
Advertisements

Report on Accelerator Plenary Session “Power Consumption” Chris Adolphsen & Philippe Lebrun LCWS 12 University of Texas at Arlington, USA 22 – 26 October.
Homework of HLRF 1 Shigeki Fukuda KEK 2012/4/23 HLRF Homework1 in KILC12 (Fukuda) 1.
TLCC Themes BAW-2, SLAC, 19 January 2011 Ross Walker Yamamoto 1.
Nick Walker Marc Ross Akira Yamamoto GDE PAC Prague TDR Plans and Scope.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Global Design Effort - CFS Damping Ring Baseline Technical Review 1 DAMPING RING BASELINE TECHNICAL REVIEW CONVENTIONAL FACILITIES AND SITING.
Baseline Configuration - Highlights Barry Barish ILCSC 9-Feb-06.
The ILC Global Design Effort Barry Barish ILC Industrial Forum Japan 28-June-05.
5 May 06 SLAC SPC 1 ILC Global Activities GDE, FALC Barry Barish GDE Caltech.
3-March-06ILCSC Technical Highights1 ILC Technical Highlights Superconducting RF Main Linac.
CONVENTIONAL ELECTRICAL TDR DESIGN Randy Wielgos March 22, 2012 ILC CFS Baseline Technical Review.
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Question 25: Delineate the R&D program remaining before a technical design review (TDR) and full cost estimate can be prepared. What are the major projects.
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
Cost Impacts of two e- ML cycles at sqrt(s) < 250 GeV purpose: not to generate a new ILC estimate, but to facilitate SB2009 decisions Peter H. Garbincius,
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Positron Source Relocation 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
Global Design Effort - CFS LCWS CONVENTIONAL FACILITIES AND SITING GROUP Parallel Session Overview A. Enomoto, V. Kuchler, J. Osborne.
ILC CFS AD&I Daresbury Lab Summary J.Osborne / V.Kuchler / A.Enomoto.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Christopher Nantista ARD R&D Status Meeting SLAC February 3, …… …… …… … ….
Proposed TDR baseline LLRF design J. Carwardine, 22 May 2012.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Baseline Workshop Preparation At the close of each BAW, we would like to write down a summary that is based on our common understanding of the issues.
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
Nick Walker Marc Ross Akira Yamamoto 2010 (and beyond) Plans & Milestones.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
ILC – Recent progress & Path to Technical Design Report Brian Foster (Hamburg/DESY/Oxford & GDE) Plenary ECFA CERN 25/11/11.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
27 Nov 07 VM Workshop Global Design Effort 1 ILC – Superconducting Linear Collider Marc Ross, Project Manager GDE Fermilab.
6-10 Nov. 06 ILCWS Valencia Global Design Effort 1 RDR Management Board Overview K. Yokoya KEK.
Accelerator Laboratory 1 CFS Review of Asian Region (S. Fukuda) June 1/ Hz Operation in DRFS HLRF System KEK S. Fukuda.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
Status of the International Linear Collider and Importance of Industrialization B Barish Fermilab 21-Sept-05.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
AD & I 15 August 2012 Marc Ross R&D for TDR Summary of TDP R&D items and baseline changes to RDR – to be included and highlighted in TDR text
20 July 2006 Vancouver GDE Meeting Global Design Effort 1 Ring to Main Linac Peter Tenenbaum SLAC.
ILC Global Design Effort Barry Barish GDE 9-March-06.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
M. Ross, N. Walker, A. Yamamoto th ATF2 Project Meeting Accelerator Design and Integration – New Baseline Proposal for ILC – ‘Strawman Baseline.
24-July-10 ICHEP-10 Paris Global Design Effort 1 Barry Barish Paris ICHEP 24-July-10 ILC Global Design Effort.
1 May 06 LCFOA - SLAC Global Design Effort 1 ILC Global Design Effort Barry Barish GDE Caltech.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Cost Impacts of Reduced # Bunches per Train purpose: not to generate a new ILC estimate, but to facilitate SB2009 decisions Peter H. Garbincius, Fermilab.
P5 Potential US Accelerator Collaboration with the ILC-in-Japan Mike Harrison Mike Harrison.
AAP Review Oxford, January Introduction to SB2009 Nick Walker Marc Ross Akira Yamamoto.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
1 DR 10 Hz Repetition Rate S. Guiducci (LNF) AD&I webex, 23 June 2010.
HLRF Post-TTC Meeting (Fukuda)
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Q &A for the questions from CFS of April 29,2011
Summary of WG2 :CFS for staging
Chris Adolphsen Sergei Nagaitsev
CONVENTIONAL FACILITIES presented by Peter H. Garbincius
Yamamoto WG3: ML-SCRF Parallel Session,
General presentation about recent status of DRFS
ILC Global Design Effort
Electron Source Configuration
ILC Cryogenics -- Technical Design Report Planning
Barry Barish Paris ICHEP 24-July-10
ILC - Global Design Effort
SNS-PPU upgrades the existing accelerator structure
Presentation transcript:

Summary of TDR Cost Reviews at KILC-12 G. Dugan KILC-12 4/26/12

TDR Cost methodology TDR cost estimate will be in 2012 ILCU, defined as USD of Jan 1, 2012, and related to other currencies using purchasing power parity conversions to USD as of that date. For all technical systems excluding L-band SCRF: Use escalated unit RDR costs with quantities modified as defined by TDR design for sources, RTML, ML, BDS, Cryogenics, and some DR systems DR magnets, power supplies, vacuum system: new estimates CFS: New estimates for civil engineering, electrical and mechanical systems, for Asian and American sites; new estimates for civil only for European site. L-band SCRF High-level RF: new estimates for KCS (klystron cluster) and DKS (distributed klystron) designs L-band SCRF Cavities and cryomodules: new estimates Approximate 75% of the TDR cost estimate will be new; the remainder will be based on escalated RDR unit costs.

Area system cost reviews (1) Electron source: Increase in length of ELTR (transfer line to DR) Increase in modulator for warm (buncher) RF for 10 Hz Estimated change in system cost from RDR: +4% Positron source: Eliminate 10%-intensity Keep-Alive Source (KAS) Eliminate ~5 km of 400 MeV transfer line Add ~1%-intensity KAS Estimated change in system cost from RDR: -25% (excluding remote handling system, TBD) Damping rings Reduce magnets due to ring circumference reduction from 6.4 to 3.2 km Reduce RF system cryomodules and HLRF Implement distributed power supply system

Area system cost reviews (2) Damping rings (con’t) Implement vacuum system with full electron cloud mitigation features (estimate still in development) Estimated change in system cost from RDR: ~-15% RTML: Increase in length of main transport line Additional RF unit for each bunch compressor (10 Hz) Estimated change in system cost from RDR: +5% ML (excluding SCRF): No changes BDS Not reviewed: expect minimal changes from RDR Cryogenics Not reviewed: expect change from RDR: 8 cryoplants -> TDR: 10 (smaller) cryoplants (+5% of system cost)

Conventional facilities cost reviews Reviewed new estimates for Americas civil, mechanical and electrical conventional facilities Civil: single circular tunnel, with KCS HLRF configuration Supporting electrical and mechanical designs (based on contractor estimates) Estimated change in system cost from RDR: ~-20% Reviewed new estimates for Asian civil, mechanical and electrical conventional facilities Civil: Kamaboko tunnel, with DKS HLRF configuration Supporting electrical and mechanical designs (based on contractor estimates) (full power) Estimated change in system cost from RDR: TBD

Technical systems cost reviews: L-band High-level RF New 10 MW Multi-beam klystron estimate based on vendor quotes: approximately the same unit cost as RDR. New modulator (Marx) estimate based on fabrication costs from SLAC: lower unit cost than RDR. Two power distribution system designs: klystron cluster (KCS) and distributed klystron (DKS). Both DKS and KCS use less klystrons and modulators than the RDR Both DKS and KCS use the same local PDS, which is more complex (and expensive) than RDR due to need to deal with cavity gradient spread. KCS requires long waveguides to distribute power from surface sites to the tunnel, and also more klystrons and modulators than DKS due to increased losses. Estimated change in system cost from RDR: ~+4% for KCS, ~-19% for DKS.

Technical systems cost reviews: L-band Cavities and Cryomodules New cavity and cryomodule estimates will be based on Estimates from 2007 Actual costs from EXFEL cavity procurements and cryomodule assembly experience, and from FNAL cryomodule fabrication Current vendor quotes for cavities and SC material New industrial studies in Europe (Research Instruments, Zanon), Japan (Mitsubishi, Toshiba, Hitachi) and US (Advanced Energy Systems) All studies expected to be completed by early summer Considerable effort is still required to understand and reconcile results from these studies. The new estimate for cavities and cryomodules will be more robust and mature than was possible for the RDR.

Conclusions TDR cost estimate development is well underway. Significant cost reductions for positron source and DR. Area system estimates still pending: positron source remote handling, DR vacuum system, BDS and Cryogenics. Major cost reductions for CFS. Some cost reduction in HLRF system for DKS configuration. New estimates for cavities and cryomodules still being developed; basis of estimate will be much more extensive than for the RDR.