Poplar River Sediment Source Assessment John L. Nieber Bruce N. Wilson Department of Bioproducts and Biosystems Engineering University of Minnesota July.

Slides:



Advertisements
Similar presentations
U.S. Department of the Interior U.S. Geological Survey Prepared in cooperation with the Johnson County Stormwater Management Program Casey J. Lee U.S.
Advertisements

Ann D Hirekatur Project Manager State of Lake Wisconsin Meeting July 13, 2013 Wisconsin River Basin Water Quality Improvement Project.
Phosphorus Loads from Streambank Erosion to Surface Waters in the Minnesota River Basin D. J. Mulla Professor, Dept. Soil, Water, Climate University of.
5. Final Remarks Information and the GIS package developed will be used to evaluate the effectiveness of implemented watershed management practices in.
Developing Modeling Tools in Support of Nutrient Reduction Policies Randy Mentz Adam Freihoefer, Trip Hook, & Theresa Nelson Water Quality Modeling Technical.
Minnesota Watershed Nitrogen Reduction Planning Tool William Lazarus Department of Applied Economics University of Minnesota David Mulla Department of.
M. Stone, J. Stormont, E. Epp, C. Byrne, S. Rahman, R. Powell, W
The Wisconsin River TMDL: Linking Monitoring and Modeling Ann Hirekatur, Pat Oldenburg, & Adam Freihoefer March 7, 2013 Wisconsin River TMDL Project Team.
Fort Bragg Cantonment Area Background The USGS is working with the U.S. Army at Fort Bragg to develop a Storm Water Pollution Prevention Plan (SWP3). The.
October 5, 2005, The 4th IAHR Symposium on River, Coastal and Estuarine Morphodynamics Field Observation and WEPP Application for Sediment Yield in an.
OKLAHOMA STATE UNIVERSITY Biosystems and Agricultural Engineering Department Hydrology 101 OKLAHOMA STATE UNIVERSITY Biosystems and Agricultural Engineering.
Hydrology: Discharge, Hydrographs, Floods, and Sediment Transport Unit 1: Module 4, Lecture 2.
Streams in urbanizing landscapes: from syndrome diagnosis to watershed prescription NSF Grant
Hydrologic Studies Unit Land and Water Management.
Getting the Big Picture How to Look at Your Watershed Indiana Watershed Planning Guide,
S. Fork Nooksack River, WA. Reasons for Land Clearing Agriculture Lumber Mining Urban Development.
L-THIA Long-Term Hydrologic Impact Assessment Model ….provides relative estimates of change of runoff and non point source pollutants caused due to land.
Identifying Critical Areas for BMP Applications. Critical Areas Those areas or sources where the greatest water quality improvement can be accomplished.
Characterizing Baseline Water Body Conditions. What? Confirm impairments and identify problems Statistical summary Spatial analysis Temporal analysis.
EEP Watershed Planning Overview August 12, Ecosystem Enhancement Program Nationally recognized, innovative, non-regulatory program formed in July.
U.S. EPA: NCEA/Global Change Research Program Jim Pizzuto and students University of Delaware Changing Climate and Land Use in the Mid-Atlantic: Modeling.
Stream Crossings: Effects on Streams at Fort Riley Military Installation Gilbert Malinga 1, James Steichen 1, Stacy Hutchinson 1,Phillip Woodford 2, Tim.
Nonpoint Source Pollution Reductions – Estimating a Tradable Commodity Allen R. Dedrick Associate Deputy Administrator Natural Resources & Sustainable.
Water Quality Monitoring and Parameter Load Estimations in Lake Conway Point Remove Watershed and L’Anguille River Watershed Presented by: Dan DeVun, Equilibrium.
Darren Carlson District Manager Kittson Soil and Water Conservation District (SWCD) 410 South 5 th Street, Suite 106 Hallock, MN (218)
Ecosystems Climate and Land-Use Change Water Natural Hazards Core Science Systems Energy and Minerals, and Environmental Health U.S. Geological Survey.
Short Course on Gullies and Streams Tom Millard, Vancouver Forest Region.
FNR 402 – Forest Watershed Management
Abstract Background Conclusion Stream Bed Morphology and Discharge Rates of Deckers Creek Data was collected at 5 different points along a 100 meter transect.
Policy Considerations in the Lower Poplar River Turbidity TMDL Study Greg Johnson, Karen Evens, and Pat Carey, Minnesota Pollution Control Agency, St.
Predicting Sediment and Phosphorus Delivery with a Geographic Information System and a Computer Model M.S. Richardson and A. Roa-Espinosa; Dane County.
TMDLs on the Clearwater River Fecal Coliform Impairment of the Trout Stream Portion of the Clearwater River By Corey Hanson Water Quality Coordinator Red.
Brent Mason, Mackenzie Consoer, Rebekah Perkins BBE 5543 November 8, 2011.
Runoff Pond Design, Lutsen, MN By Mark Greve. Problem Poplar River increases in sediment load near Lutsen ski hills Structure needed to slow flow and.
Methods A predictive method will be developed from NBSS measurements and vegetation/channel properties from the flume data. The predictive method will.
Emily Shimada, Environmental Science, University of Idaho Research Team B: Watershed Management in the Andean Paramo Faculty Advisors: Dr. Alex Fremier,
Assessing Alternative Policies for the Control of Nutrients in the Upper Mississippi River Basin Catherine L. Kling, Silvia Secchi, Hongli Feng, Philip.
PREDICTION OF SOIL LOSSES. EMPIRICAL WATER EROSION FORMULAS A= k s 0,75 L 1,5 I 1,5 (Kornev,1937) A= k s 1,49 L 1,6 (Zingg,1940) A= k s 0,8 p I 1,2 (Neal,1938)
Oregon Case Studies Ryan Johnson. Studies  The response of impounded sediment to a culvert replacement project on Sutter Creek, a tributary of Honey.
Modeling experience of non- point pollution: CREAMS (R. Tumas) EPIC (A. Povilaitis and R.Tumas SWRRBWQ (A. Dumbrauskas and R. Tumas) AGNPS (Sileika and.
The Knife River Turbidity TMDL Comprehensive Overview and Critique -Matias Valero, Rob Little, Rod Sykora-
Basic Hydrology Water Quality: Sediment production and transport.
1 Questions Addressed What are the options for reducing pollutant inputs to Lake Tahoe? Pollutant Reduction Opportunities.
San Pedro Creek: A Longitudinal Profile Study Andrew Georgeades Anne Jurek Mary Snow.
Assessment of Runoff, Sediment Yield and Nutrient Load on Watershed Using Watershed Modeling Mohammad Sholichin Mohammad Sholichin 1) Faridah Othman 2)
Timeline Impaired for turbidity on Minnesota’s list of impaired waters (2004) MPCA must complete a study to determine the total maximum daily load (TMDL)
National Consultation with TNMC 3 May 2005, Bangkok WUP-FIN Phase II – Bank erosion study.
Baird Claytor Hydroelectric Project Sedimentation Study.
Using GIS and the PSIAC Method to Predict Watershed Sediment Yield Rates Eric Berntsen.
Natural vs. Accelerated Soil Erosion Natural geologic erosion has occurred at a relatively slow rate since the earth was formed. Natural erosion produces.
US Army Corps of Engineers Detroit District Knife River Reducing Sediment Delivery Through Forest Restoration.
™ Nutrient Management Planning ¨ Will these be mandated in your state?  An emerging national issue is how to account for agricultural non-point source.
State Board Modeling Needs and Interests Eric Berntsen, PH, CPESC, CPSWQ State Water Resources Control Board CWEMF Hydrology and Watershed Modeling Workshop.
Detroit District, Hydraulics & Hydrology Office US Army Corps of Engineers River Bank Erosion Siskiwit River, Cornucopia, WI.
Lake Independence Phosphorus TMDL Critique Stephanie Koerner & Zach Tauer BBE 4535 Fall 2011.
 More of What Is a Watershed  Why do we delineate our watershed?  Obtaining Topographic Maps Online  Reading A Topographic Map  How to Delineate a.
TMDLs on the Clearwater River Fecal Coliform Impairment of the Trout Stream Portion of the Clearwater River By Corey Hanson Water Quality Coordinator Red.
Urbanized Stream Source Ratio October 20, 2015 Urban Stormwater Workgroup Reid Christianson, PE, PhD Neely Law, PhD Bill Stack, PE.
Storm Water Permit Program Authority to regulate storm water discharges derives from 40 CFR Illinois EPA is delegated authority to administer this.
SONOMA CREEK AND SEDIMENT: KNOWING WHAT WE DON’T KNOW MAY 2011.
STORM WATER SOLUTIONS FOR EXISTING URBAN AREAS: IDENTIFYING SITES TO MAXIMIZE RESULTS Jared Bartley, Cuyahoga SWCD September 8, 2011.
Dr. Thomas Hardy Chief Science Officer River Systems Institute Texas State University.
IMPLEMENTATION UPDATE Rice County Local Water Management Plan BOARD PRESENTATION JUNE 16, 2015.
Estimating Annual Sediment Yield and a Sediment Delivery Ratio for Red Creek, Utah and Wyoming Paul Grams Department of Geography and Earth Resources.
Phosphorous Transport in Surface Overland Flow
Thief River Watershed Sediment Investigation
Continuous Surrogate Monitoring for Pollutant Load Estimation in Urban Water Systems Anthony A. Melcher, USU Civil and Environmental.
L-THIA Online and LID Larry Theller
Total Maximum Daily Loads of Fecal Coliform for the Restricted Shellfish Harvesting/Growing Areas of the Pocomoke River in the Lower Pocomoke River Basin.
Quantifying Runoff Rates for Road Segments in Culebra, PR
Presentation transcript:

Poplar River Sediment Source Assessment John L. Nieber Bruce N. Wilson Department of Bioproducts and Biosystems Engineering University of Minnesota July 17, 2009

Timeline Impaired for turbidity on Minnesota’s list of impaired waters (2004) MPCA must complete a study to determine the total maximum daily load (TMDL) TMDL study was started in 2006, but was not finished at the planned date (2008) The MPCA requested that the U of M team continue the work and to estimate contributions of erosion sources Targeted completion of the Draft TMDL is 2011

Background High turbidity threatening trout stream and health of Lake Superior Turbidity is caused by suspended silt/clay Poplar River is considered a nonpoint source (both natural and anthropogenic sources of pollution) Significant streambank and bluff erosion observed; suspected as primary sources Some measures have been taken to reduce the sediment load in the river (Mega Slump), and revegetation of bare surfaces

Specific Water Quality Problems When comparing upstream to river mouth loading rates: Phosphorus increased by 2X Total suspended solids (TSS) by 6X Mercury levels exceeded the state standard Mercury and TSS levels were strongly correlated Reducing sediment loss rates in the lower Poplar River will be beneficial for reduction of total mercury quantities into Lake Superior. “…juvenile [trout] population has declined in the Poplar since 1989.” Water quality sampling was conducted according to approved MPCA quality assurance procedures (MPCA, 2000)

Comparison of Turbidity at different sites in the Poplar River

Upstream (left) and downstream sites on the Poplar River, July 30, 2001 after a large rainfall (locations are approximately 3 mi apart) Photo credits: MPCA 2002

114 square miles of drainage area Lots of upland lakes and wetlands Soils: red lake clay and Superior lobe till 25.5 miles of river Has the highest percentage of urban land use of the monitored north shore trout streams (3.5%, mostly in the lower river area) Stream bed is composed mostly of boulders and cobbles

Objectives (overall) Acquire archived data and assess data gaps; acquire additional geomorphic data of the river and watershed, and other watershed data Apply sediment generation and sediment transport models to assess potential sediment sources and their impact on loading and transport within the river Evaluate and assess the sources of sediment entering and being transported within the Poplar River to Lake Superior

Current Activity (now until 10/30/09) Acquiring and processing archived channel morphology data for critical sections of the lower Poplar River Collected by the Cook County SWCD, MPCA, and MNDNR Data gaps will be assessed and then filled in within scope of the project Identify a reference watershed and stream to compare sediment generation Modeling work plans for future studies will be formulated

WEPP model (LER, 2005 as listed in 9/2007 report by RTI) An evaluation of soil type, land use type, and slope was conducted using a geographic information system. The areas of distinct combinations of soil type, land use type, and slope were calculated for the Poplar River gorge area. The land use type, soil type, and slope combination were simulated using WEPP. Ski trails (tall and short grass); bare soils, forest, natural openings, and golf courses were simulated using the WEPP: Hillslope model. Roads (Lutsen and non-Lutsen) were simulated using WEPP: Roads.

This average of 180 tons/year was compared by RTI (9/2007) to the sediment transported in 2002 which was 1,112 tons/year WEPP model (LER, 2005 as listed in 9/2007 report by RTI)

WEPP model (LER, 2005 as listed in 9/2007 report by RTI, 9/2007)

WEPP model application by RTI (February 2008) Estimate erosion from major land uses in lower Poplar River watershed Used refined resolution of landscape features Compared results to measured sediment loads Quantified temporal distribution of loads Conducted sensitivity analysis

WEPP model application by RTI (February 2008) Limitations of WEPP (watershed version) Poor simulation of impervious areas Overestimate of erosion and sediment yield may occur at larger watershed sizes Does not include bank erosion or sloughing Does not include roads in the watershed version Does not include erosion from perennial streams Does not simulate gully erosion

WEPP model application by RTI (February 2008) Results Average upland source of sediment estimated to be 76% of total load – compared to 20% in LER study Trends between predicted and observed sediment load similar Prediction shows that development has significant effect on sediment load

WEPP model application by RTI (February 2008)

Expected data needs to fill gaps Stream morphology X-sections Texture of bank materials Bank Erosion Hazard Index (BEHI) of banks Shear strength of bank materials Landscape topography – LIDAR, field surveying Identification of gullies and other concentrated sediment sources Locations of road and trails Soil characterization for runoff generation

Future Activity Watershed modeling will be done to: Better delineate the upland runoff erosion sources Determine contribution of different sources to sediment load Field data will be used in three models to provide estimates of erosion generated from the streambanks and bluffs – CONCEPTS, BSTEM, BEHI Development of a method to monitor BMP effectiveness Test this method on the Mega Slump U of M will assist the Cook County SWCD with incorporating the results of these tasks into the TMDL report

Configuring natural flow pathways Topographic contours Flow paths in Wisconsin watershed – derived digitally

Configuring natural flow pathways Flow paths in Oklahoma watershed – derived digitally

Identifying location for erosion/sediment transport potential Distribution of unit stream power (watershed in SE Minnesota); from Moore and Nieber (1989) Unit stream power

Data needs for upland erosion distribution Detailed topographic data Bedrock depth – soil thickness Soil hydraulic properties Erodibility of soils Field verification of connectivity of sources to ephemeral, intermittent or perennial stream channels

Questions?

References Poplar River, MN (Cook County), 2006 Automated, in situ, Water Quality Data: Preliminary Analysis