Lake Independence Phosphorus TMDL Critique Stephanie Koerner & Zach Tauer BBE 4535 Fall 2011.

Similar presentations


Presentation on theme: "Lake Independence Phosphorus TMDL Critique Stephanie Koerner & Zach Tauer BBE 4535 Fall 2011."— Presentation transcript:

1 Lake Independence Phosphorus TMDL Critique Stephanie Koerner & Zach Tauer BBE 4535 Fall 2011

2 Watershed Description  Pioneer-Sarah Creek Watershed  851 – acre lake / 7631 – acre watershed  North Central Hardwood Forest ecoregion  Deep lake – max depth: 58ft  15 miles West of Minneapolis  Uses:  Recreation  Aesthetic viewing  Contains portion to Municipalities  Medina  Independence  Loretto

3 Watershed Shoreline  Receives 7,631 acres of runoff  Uses of shoreline:  Agriculture  Commercial  Park and Recreation  Residential  298 animal units are on the shoreline, mostly of Horses on Single Family Property.

4 History of Watershed  Prior to 1850 the surroundings were predominantly Forests and Wetlands.  July 4, 1854 settlers found the lake giving it’s name Lake Independence for the day it was found.  Area slowly developed with lakeshore homes and agriculture  Drainage systems were then put in place which drastically changed the hydrologic system  Recently seasonal lake homes on the lake were converted to year round homes

5 Water Quality  Monitored biweekly from 1990 except in 1992  Phosphorus and chlorophyll data show no significant trends of improving or declining since 1990 but Secchi disk data showed a reduction in clarity.

6

7 Water Quality – Aquatic Vegetation  Curlyleaf pondweed and Eurasian watermilfoil cause water clarity and recreational problems from the lake.  Curlyleaf pondweed grows under ice and forms dense growth by late spring and dies in mid July causing increase in nutrients.

8 303(d) Listing  Total phosphorus concentration exceeded 40ppb 11 of 12 years from 1990 to 2003.  Calculated from a minimum of 9 samples a year  Placed on 303(d) list as impaired waterbody for its recreational uses in 2002.

9 Modeling  MINLEAP, BATHTUB and Canfield and Bachman models were.  MINLEAP quantified the feasibility of the target goal  Canfield and Bachman estimated TP reduction to achieve target  BATHTUB estimated nutrient flows from subwatersheds  Canfield and Bachman was used based on field monitoring and computer model which resulted in 2,381 lbs/yr assuming normal precipitation.  Model predicted reduction of 1300 lbs/yr to reach 36ppb.

10 MINLEAP  Calculated with “typical” nutrient inflows to unimpaired lakes in central Minnesota  Target concentration is likely attainable.

11 BATHTUB with GIS

12 GIS for Livestock Contribution

13 Bachman and Canfield  Sources of phosphorus

14 TMDL  TMDL = WLA + LA + MOS

15 TMDL Continued  Seasonal Variability  MOS – 35 lbs/yr was incorporated into TMDL for rainfall Variability

16 Final Phosphorus TMDL  Non-degradation Policy  Future land development requires to meet strict guidelines to protect water quality and prevent increases in runoff and nutrient loading.

17 Public Participation  Funding for the study was provided by the Three Rivers Park District and Lake independence Citizens Association provided many hours of volunteer work.  Efforts between the Three Rivers Park District, local municipalities, and MPCA the diagnostic feasibility evolved into the Lake Independence Phosphorus TMDL  Estimated associated costs, expected effectiveness, predicted longevity, and technical feasibility.  Target goal, WLA and LA were discussed by a large group of stakeholders.  Committee met monthly for two years  Decided WLA and LA would be based on source instead of municipal or subwatershed basis.

18 Implementation  Reducing movement of phosphorus into Lake Independence.  45% reduction (1081lbs/yr)  872 lbs/yr decrease from each identified external source  209 lbs/yr decrease of internal loading due to reduction of external sources.

19 Source Implementation Plan  Continue water quality monitoring program  Water sample collection  Inflow monitoring during and after implementation

20 Cost and Implementation  Ranked in highest priority, Time lines, Estimated costs, responsible parties and tasks are explained  Goal reduction and possible reduction  Agriculture – Buffer Strips  300 acres can be installed  $150,000 to $500,000  Goal reduction 284lbs possible reduction 288lbs  Animal Waste – BMPs  33 feedlots  $330,000 to $825,000  Goal reduction 378lbs possible reduction 435lbs  Urban Development – urban runoff  Goal reduction 146lbs possible reduction 202lbs  Failing Sewage Treatment – inspections  $500,000  Goose Removal – reduce goose population  $2,500  Loretto Wastewater Treatment

21 Example of Implementation Plan

22 Critique  Overall capable reduction  Effort and time put behind implementation plans  Local involvement was helpful  Useful and long record of data  Water Quality was not monitored for the year of 1992 but was not explained.  Sediment cores were used from four other lakes in the area of Lake Independence but not from the lake to estimate historical phosphorus loads.


Download ppt "Lake Independence Phosphorus TMDL Critique Stephanie Koerner & Zach Tauer BBE 4535 Fall 2011."