Dressing Test for the LHCb Muon MWP Chambers LECC 2006 Valencia Speaker: Rafael Antunes Nobrega (INFN Roma1) INFN Roma1: V. Bocci, R. Nobrega INFN Roma2:

Slides:



Advertisements
Similar presentations
March 02, 2009LHCb Muon Commissioning meeting 1 First week of chambers test Alessandro Cardini, Davide Pinci, Fernando Rodrigues, Maria Luisa Porto, Rafael.
Advertisements

20/Oct./2000 CF IEEE NSS 2000 at Lyon,France 1 An MWPC Readout Chip for High Rate Environment Introduction ASIC Structure & Fabrication ASIC Evaluation.
STAR Pixel Detector Phase-1 testing. 22 Testing interrupted LBNL-IPHC 06/ LG Lena Weronika Szelezniak born on May 30, 2009 at 10:04 am weighing.
JLab High Resolution TDC Hall D Electronics Review (7/03) - Ed Jastrzembski.
The MAD chip: 4 channel preamplifier + discriminator.
Potentiostat Basics I’m Max Yaffe
Specific requirements for analog electronics of a high counting rate TRD Vasile Catanescu NIHAM - Bucharest CBM 10th Collaboration Meeting Sept 25 – 28,
MDT-ASD PRR C. Posch30-Aug-02 1 Specifications, Design and Performance   Specifications Functional Analog   Architecture Analog channel Programmable.
The transmission line circuit block used in Cadence Major Blocks and Peak Detector Sections of Channel Equalization Techniques for Ethernet Communication.
RPC Electronics Status Overall system TDC –Digitizing frequency issue (determine the bin size of the TDC value) Discriminator test result Trigger module.
A.Kashchuk Muon meeting, CERN Presented by A.Kashchuk.
Status of LAV FEE electronics G. Corradi, C. Paglia, D. Tagnani & M. Raggi, T. Spadaro, P. Valente.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
Pierpaolo Valerio.  CLICpix is a hybrid pixel detector to be used as the CLIC vertex detector  Main features: ◦ small pixel pitch (25 μm), ◦ Simultaneous.
Modelling of TPM noise problems Greg, following discussions and measurements with David and Senerath.
1 Status of the Test System of the MWPC for the LHCb Muon System Andre’ Massafferri (Universita’ Tor Vergata – INFN sezione II - Roma) V. Bocci, R. Nobrega.
CARIOCA (Cern and RIO Current Amplifier). The CARIOCA chip has 8 binary output, therefore DIALOG has 16 PCH as input channels and has up to 8 LCH as output.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
Preliminary measurements for the 8 channel prototype of SPD discriminator ASIC I.The 8 channel prototype. II.Status of the test. III.Noise. IV.Gain. V.Test.
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
B.Satyanarayana, TIFR, Mumbai. Architecture of front-end ASIC INO Collaboration Meeting VECC, Kolkata July 11-13, Amp_out 8:1 Analog Multiplexer.
Performance of a 128 Channel counting mode ASIC for direct X-ray imaging A 128 channel counting ASIC has been developed for direct X-ray imaging purposes.
25th June, 2003CMS Ecal MGPA first results1 MGPA first results testing begun 29 th May on bare die (packaging still underway) two chips looked at so far.
FE boards test & production G. Auriemma, D. Fidanza & C. Satriano.
Front-end boards tests G. Auriemma, D. Fidanza G. Pirozzi( $ ) & C. Satriano ( $ ) Present address: European Patent Office, Branch at The Hague, Patentlaan.
AND/OR - Are MC and Data (in)consistent? - further analysis and new measurements to do - Effects on inefficiency evaluation 1 G. Martellotti 21/05/2015.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
Using delay lines on a test station for the Muon Chambers Design considerations (A. F. Barbosa, Jul/2003)
CARDIAC production tests G. Auriemma, M. Martino & C. Satriano.
Towards a final design of LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
Valerio Re, Massimo Manghisoni Università di Bergamo and INFN, Pavia, Italy Jim Hoff, Abderrezak Mekkaoui, Raymond Yarema Fermi National Accelerator Laboratory.
65 nm CMOS analog front-end for pixel detectors at the HL-LHC
January, 2003CMS Ecal1 MGPA Specification Discussion – 9 th Jan. 03 OUTLINE 3 or 4 gain channels discussion technical background - why 3 gains could be.
SIAM M. Despeisse / 29 th January Toward a Gigatracker Front-end - Performance of the NINO LCO and HCO Matthieu Despeisse F. Osmic, S. Tiuraniemi,
LCFI meeting 19 th August 2008 TESTING OF CPR2A Mirek Havranek, Peter Murray, Konstantin Stefanov, Stephen Thomas.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
FED 9U Analog Characterization Stefanos Dris CERN & Imperial College.
To measure 0, mechanical oscillations of the wire to be tested are induced by applying a periodic high voltage (about 900 V) with a frequency of 300 ÷
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
M. TWEPP071 MAPS read-out electronics for Vertex Detectors (ILC) A low power and low signal 4 bit 50 MS/s double sampling pipelined ADC M.
Chamber electronics test bench Valerio Bocci Rafael Nobrega, Davide Pinci (INFN sez. Roma) Giovanni Carboni,Andre Massaferri,Roberto Messi, Emanuele Santovetti.
30 September 2005, Frascati Anatoli Kachtchouk) 1 From CARDIAC version 2 to CARDIAC version 3 N.Bondar, A.Kachtchouk, P.Neustroev (PNPI)
CERN PH MIC group P. Jarron 07 November 06 GIGATRACKER Meeting Gigatracker Front end based on ultra fast NINO circuit P. Jarron, G. Anelli, F. Anghinolfi,
Update on works with SiPMs at Pisa Matteo Morrocchi.
On Chamber Front End electronics Test Valerio Bocci Rafael Nobrega, Davide Pinci (INFN sez. Roma) Giovanni Carboni,Andre Massaferri,Roberto Messi, Emanuele.
The design of fast analog channels for the readout of strip detectors in the inner layers of the SuperB SVT 1 INFN Sezione di Pavia I Pavia, Italy.
PADME Front-End Electronics
Setup for automated measurements (parametrization) of ASD2 chip
Fabio, Francesco, Francesco and Nicola INFN and University Bari
A General Purpose Charge Readout Chip for TPC Applications
Results achieved so far to improve the RPC rate capability
Analog FE circuitry simulation
Tracking System at CERN 06 and 07 test beams
EMC Electronics and Trigger Review and Trigger Plan
Front-end electronic system for large area photomultipliers readout
A Fast Binary Front - End using a Novel Current-Mode Technique
J. Emery, B. Dehning, E. Effinger, G. Ferioli, C
BESIII EMC electronics
Status of the CARIOCA project
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
Pre-installation Tests of the LHCb Muon Chambers
CAL crosstalk issues and their implications
Verify chip performance
Presentation transcript:

Dressing Test for the LHCb Muon MWP Chambers LECC 2006 Valencia Speaker: Rafael Antunes Nobrega (INFN Roma1) INFN Roma1: V. Bocci, R. Nobrega INFN Roma2: G. Carboni, A. Massafferri, E. Santovetti

Indice Chamber & Front-end Electronics –Threshold Characteristics Test Setup Performed Tests –Auto-Injection (External Counters) –Threshold Scan Noise Measurement –Noise Nominal Threshold Systematic Errors Tested Chambers Results Cross-Check with cosmic acquisition Conclusion Threshold Scan

Chambers & Front-end Electronics Introduction LHCb Muon System has foreseen 19 geometrically different MWPCs. Depending on its type, chamber capacitance can vary from roughly 40pF to 250pF and signal can be read from anode and/or cathode connections. Due to the later requirement, CARIOCA has been developed to process both polarities by implementing 2 different pre-amplifiers at the very ASD input stage. They show slightly different signal responses depending on the chosen polarity operation. The on-detector circuitry is composed of three boards: OR-PAD, Spark-Protection (SPB) and CARDIAC. The first two boards make use of passive components while the third board processes and digitalizes chamber signals. Front-end main feature –CARIOCA 8 input/output lines signal amplification tail cancellation base line restoration digitalization into LVDS lines. –DIALOG read up to 16 CARIOCA channels outputs 16 8-bits DACs which provide threshold voltage width and delay adjustment Masking 24-bits scaler to each input channel auto-injected signals access via LVDS-based I2C protocol The detector capacitance determines the noise level since it acts as a series noise source. 2&4 gaps chambers 4 gaps chamber illustration

Front-end Main Characteristics Overview of the ASD main characteristics –Max. Rate ~ MHz (depending on polarity) –Sensitivity From 16 to 8 mV/fC –ENC – Equivalent Noise Charge From 0.3 to 2 fC – Offset From 740 mV to 860 mV (range of about 10 fC) –must be measured (Thresholds – one per channel) Offset

Front-end Main Threshold Characteristics CARIOCA discriminator makes use of a Differential Threshold Voltage (DTV) circuit (8 in total). It is able to provide a differential threshold (VrefA - VrefB) from an unipolar reference voltage (Vref). Apart from the offset spread we have: –Minimum detectable charge: this value can vary from roughly 2 fC to 4 fC depending on the input capacitance (rms for a single input capacitance was shown to be around fC). – Residual Bias (minimum detectable voltage – discriminator characteristic) In principal this value is not correlated to the input capacitance and has a value of about ResBias = 35 mV ± 5.5 mV (Error of ~0.4 fC). – ReaBias used from LHCb Database to minimize error. DTV Threshold Scan

Test Setup Control FEB via I 2 C (Service Board & CANopen) Internal Counters (FEB feature) External Counters (ACQ & Gate Boards and USB-VME) BarCode Reader PC (WIN, Visual C++ & ROOT) Barcode and Test Program UNDER TEST Dressed Chamber (DUT) Service Board (SB) is the board which will control the front-end electronics in the experiment. ACQ is a VME module with 64 counters on it. The Gate Board translates the SB gate signal sent to the front-end to be used also by the ACQ. FE ACQ LVDS TTL Gate Signal USB

Program (Visual C & ROOT) Barcode OutputPar.dat Diagnostic.log Complete Test Results DATABASE Chamber Barcode X Front-end Barcode Assembling Phase Get FEB parameters from DATABASE

Performed Tests Verify if Cables are Switched Auto-Injection (External Counters) –test of output drivers (LVDS) Threshold Scan –noise presence evaluation –noise rate x threshold Noise Nominal Threshold –evaluation of level of noise at nominal threshold

Cable Checking and Auto-Injection Test Check if cables are switched by injecting pulses to specific channels and reading external counters Check if FE is working properly (auto- injection, internal counters, output lines) Inject N pulses to all channels Read internal & external counters Comparison DIAGNOSTICS Auto-Injection Test Cable Checkng

Threshold Scan Noise Presence Valuation & Offset The detector capacitance determines the noise level since it acts as a series noise source. Found the ‘offset’ parameter If ‘offset’ is not found – ERROR If number of noise points is < 3 (on side) – ERROR –This number can be adjusted to detect open channels If ‘offset’ in not within limits (expected) – ERROR Acceptance window Most of the bad channels are detected with this simple diagnostics.

Qn = 1.2 fC Qn = 0.7 fC Threshold Scan Rate-Method - Noise Rate x Threshold Previous studies has shown that the assumption of a Gaussian amplitude distribution of the noise is, in first approximation, reasonable. The noise rate versus threshold level can be represented as following if we consider the bandwidth of the circuit. Vertex frequency can provide information about FE circuit bandwidth. The circuit bandwidth is known so it is a good parameters to have a feedback of the test setup. less sensitive region The slope of noise versus threshold curve allows an measurement of the noise in Volts (the threshold is set in Volts) and consequently the estimation of capacitance at the FEB inputs (Cdet). NOT DETECTABLE REGION 10 7 measured For CARIOCA this value is around MHz (depending on polarity) 22 22

Chamber Channels Cdet (Noise) Evaluation ( 3-4 RMS of acceptance) Measured Mean from Expected (3 RMS of acceptance) Expected value to chamber under test If L < 3 RMS - OK L Cdet Usually it happens only if there is something wrong with setup 4 RMS limit 3 RMS window Threshold Scan Rate-Method - Noise Rate x Threshold Worst Case Histo of 48 channels WARNING ERROR

Noise Nominal Threshold Threshold Test Values –Negative Chambers 10 fC 12 fC 14 fC –Positive Chambers 6 fC 7 fC 8 fC If Noise Rate < 1000 Hz threshold Previous studies of LHCb Muon Group has shown that chambers can have electronics noise up to few kHz All data is kept for further analysis if needed WARNING ERROR OK WARNING ERROR OK

Output Parameters The main parameters available for visualization are: Slope (mV) Offset (mV) Cdet (pF) 100 Hz (from noise curve) Noise 3 levels of threshold around the nominal threshold ENC (fC) In this file it is also reported the values of the LHCb FEB test database (Potenza) Offset Max.Noise Rate Slope threshold^2

Diagnostics Results Diagnostics are reported on file. To track down the problematic channels the front-end board addresses and channels are indicated together with result values. Keep history of tests. If more than one test is done to the same chamber we intent to not delete the previous information but add the new test information on the chamber file.

Estimation of Measurement Error One single channel tested for 5 different capacitances (47, 56, 100, 180 and 220 pF) (100 measurements to each capacitance) 5 16-channels capacitor boards were built The results showed that it is possible to measure a channel input capacitance with a precision of RMS= ~0.04 fC (~5 pF) but this is a hard task since we would need a calibration curve for each channel. The bottom plot shows linearity behaviour of equivalent noise charge versus ASD input capacitance. It must be noted that for the bottom graph horizontal error bars represent 5% capacitance tolerance while vertical error bars represent Gaussian standard deviation. (fC) When evaluating different channels of a group of boards the system looses precision due to spread on FE characteristics, RMS = ~0.3 fC (about 20 pF). It is enough to evaluate single channels. Tested chambers

INFN Chambers ~ 130 Chambers TESTED ~ 200 Chambers at LNF < 100 Chambers (M2-M5) STILL TO BE BROUGHT TO LNF

Tested Chambers LNF - Frascati 128 Output Files Analyzed / 119 Good LNF59-M5R4, 22-M3R3 Firenze41-M5R4 Ferrara06-M5R2 LNF M5R4 (~230pF) LNF M5R3 (~130pF) After cuting bad chambers

Tested Chambers Firenze e Ferrara FIR M5R4 (~230pF) FER M5R2 (~120pF)

Cross-Check with Cosmic Acquisition Acquisition using cosmics was done on the tested chambers. –Only one dead channel found, due to transportation (Frascati >> CERN). –A new problem that was not being detected by our system was found on less than 0.5% of the channels. –Studies has shown that those channels have an particular shape (Threshold x Noise Rate). The characteristics of the circuit is altered (?). –Low Eff. on cosmic acquisition –Rate capability (in this case it might not be detected for low capacitance chambers) –Lower minimum detectable voltage >> In principal a simple check on the curve shape or optimization of diagnostic parameters would be enough but we have to see for low capacitance chambers. Normal shape Malfunctioning channels Cosmic Acquisition Low. Eff

Goal of Project The goal of this project is to implement an automatic and fast system to be used also for non experts → mass production test. Chambers that do not pass on the tests must be seen more carefully by experts (by now when we have a bad channel, it is solved at the same moment and than a new test is done). We aim to reduce drastically the number of chambers to be rechecked at the end.

Conclusion Goal – Automatic and fast (5-10 minutes) system has implemented to test a big number of chambers Project is already in use to test the INFN MWPC Chambers –~130 chambers tested System has shown to be very efficient –Test of high capacitance chambers (M5R4) gave positive feedback –Tests of low capacitance chambers will give us important feedback –Cross-check with cosmic acquisition test has been positive Only 0.5% of channels has presented an unexpected kind of problem and probably it will be possible to detect it on an upgraded version –We are studying it and diagnostics will be upgraded