Boulby Laboratory (UK) Middlesborough Whitby Staithes York.

Slides:



Advertisements
Similar presentations
Report from the Particle Astrophysics Advisory Panel Particle Astrophysics Advisory Panel Report.
Advertisements

Some recent studies using Models-3 Ian Rodgers Presentation to APRIL meeting London 4 th March 2003.
LBNE Reconfiguration Jim Strait, LBNE Project Director Fermilab Community Advisory Board August 23, 2012.
TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
11/05/06GDR-Neutrino à Orsay (LAL)1 GDR-Neutrino (10-11 mai 2006) L. Mosca (CEA-Saclay) The MEMPHYS project (Laboratory excavation) MEgaton Mass PHYSics.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
An Introduction to the Boulby Underground Labs
Underground Facilities Stub 2 Stub 2a,3 ‘H’ Area JIF Area The underground research facilities have evolved since dark matter studies began at Boulby. There.
DMSAG 14/8/06 Mark Boulay Towards Dark Matter with DEAP at SNOLAB Mark Boulay Canada Research Chair in Particle Astrophysics Queen’s University DEAP-1:
Background Measurements and Boulby for JRA1 Tim Lawson University of Sheffield IAP, Paris, 14 th February 2006.
Dark Matter Searches with Dual-Phase Noble Liquid Detectors Imperial HEP 1st Year Talks ‒ Evidence and Motivation ‒ Dual-phase Noble Liquid Detectors ‒
Report from Low Background Experiments Geant4 Collaboration Workshop 10 September 2012 Dennis Wright (SLAC)
Pyhäsalmi (site review) W. H. Trzaska on behalf of the Finnish LAGUNA team.
NSF VISION in PARTICLE and NUCLEAR ASTROPHYSICS Richard N. Boyd  The Present  Dark Matter  Ultra high energy cosmic rays  Ultra high energy gamma rays.
October 12th, 2006L. Mosca LAGUNA Meeting in Zurich 1 IPP- ETH Zurich October 12th, 2006 LAGUNA Meeting WG 7: Safety and Environment Report by L. Mosca.
By Kristine Kovacs The Big Bang and Beyond
Office of Science U.S. Department of Energy SLAC Users Organization Meeting July 6, 2004 Dr. Robin Staffin, Associate Director Office of High Energy Physics.
INDIA-BASED NEUTRINO OBSERVATORY (INO) STATUS REPORT Naba K Mondal Tata Institute of Fundamental Research Mumbai, India NUFACT Scoping Study Meeting at.
The neutrons detection involves the use of gadolinium which has the largest thermal neutron capture cross section ever observed. The neutron capture on.
Towards a Future Long-Baseline Neutrino Experiment Bob Wilson Colorado State University CERN Prototype/Beam Test Meeting CERN, 20 October 2014.
PANDAX Results and Outlook
Search for Dark Matter at CJPL with PANDAX
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
Neil Spooner - SheffieldUKNF 23-04/09 Physics and Astronomy High Impact, World Leading Science in STFC priority areas ATLASDark Matter Neutrino physics.
John Womersley Particle Physics in CCLRC John Womersley Director of Particle Physics, CCLRC Zeuthen May 2006.
Boulby International Subsurface Astrobiology Laboratory (BISAL) Charles Cockell, Sean Paling, David Pybus, David McLuckie et al.
DRIFT II & DTM recent work 2010/11 UK: Sheffield, Edinburgh, STFC AIM: Directional Detection of WIMP Dark Matter - Identify a Galactic Signal US: Occidental,
ZEPLIN II Status & ZEPLIN IV Muzaffer Atac David Cline Youngho Seo Franco Sergiampietri Hanguo Wang ULCA ZonEd Proportional scintillation in LIquid Noble.
Status of DRIFT II Ed Daw representing the DRIFT collaboration: Univ. of Sheffield, Univ. of Edinburgh, Occidental College, Univ. of New Mexico Overview.
L. MoscaNNN07 Conf - 2 to 5 Oct NNN07 Conference at Hamamatsu 2 to 5 October 2007 Report on LAGUNA Large Apparatus for Grand Unification and Neutrino.
Status and Plans The Boulby Underground Science Facility (UK)
L. MoscaEPIPHANY Conf 6-8 Jan EPIPHANY Conference at Cracow “Physics in Underground Laboratories and its connection with LHC” - 6 to 8 January 2010.
NSF Dark Matter Program P5 Meeting, Sept 24-25, Dark Matter Searches Summary of NSF Dark Matter Projects Direct Detection (including co-funds with.
Recommendations for Science at SNOLAB Andrew Hime On behalf of the Experiment Advisory Committee Aug. 17, 2005 SNOLAB Surface Building.
John Womersley John Womersley Director, Science Programmes Science and Technology Facilities Council Technology Gateway Centres.
Outlook on Underground Science Thomas Bowles Los Alamos National Laboratory / University of Washington American Physical Society Meeting Philadelphia April.
A large water shield for dark matter, double beta decay and low background screening. T. Shutt - Case R. Gaitskell - Brown.
Neutron Monitoring Detector in KIMS Jungwon Kwak Seoul National University 2003 October 25 th KPS meeting.
Cost and Engineering Working Group Introduction Jim Strait Fermilab LBNE Project Manager Deputy Chair, Cost and Engineering Working Group LBNE Reconfiguration.
North-East Northamptonshire Project Highlight Report No. 5 Period January 2015 Thursday February 5 th 2014.
Poster Design & Printing by Genigraphics ® Neutrino Interactions Studying the properties of neutrinos will shed light on the origin of the.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
DARK MATTER IN THE UNIVERSE? PRESENTED BY L. KULL AT THE R.H.FLEET SCIENCE CENTER December 14,2005.
1SNOLAB 21 August 2006 ZEPLIN A Direct Dark Matter Search Programme using Liquid Xenon CCLRC – Rutherford Appleton Laboratory, UK Edinburgh University,
LAr1 Plans at FNAL Bruce Baller - Fermilab. Outline LAGUNA Meeting - Mar  LBNE LAr detector overview  Prototyping plan  1 kton prototype.
Build on success to show feasibility of scale-up and physics capability [Brunel, Durham, Sheffield, Sussex, AAE Ltd., e2v Ltd., Rhyal Ltd., Technodyne.
ZEPLIN I: First limits on nuclear recoil events Vitaly A. Kudryavtsev Department of Physics and Astronomy University of Sheffield, UK For the UK Dark Matter.
Deep Underground Science and Engineering Laboratory at Homestake1 Richard DiGennaro, LBNL DUSEL Project Manager 20 June 2008 Facility Planning for DUSEL.
DARK MATTER SEARCH Carter Hall, University of Maryland.
ZEPLIN III Position Sensitivity PSD7, 12 th to 17 th September 2005, Liverpool, UK Alexandre Lindote LIP - Coimbra, Portugal On behalf of the ZEPLIN/UKDM.
Muon-induced neutron background at Boulby mine Vitaly A. Kudryavtsev University of Sheffield UKDMC meeting, ICSTM, London, 27 June 2002.
Dark Matter, The Boulby Underground Facility and Astroparticle Physics Nigel Smith STFC RAL Particle Physics Department.
Long-Baseline Neutrino Facility LBNF Far Site Conventional Facilities (FSCF) Scope and Interface Overview Tracy Lundin as borrowed from Headley & Willhite.
Deep Science at Boulby Underground Laboratory:
The Princeton NaI Experiment (SABRE) Frank Calaprice Princeton University Cosmic Frontier Workshop SLAC March
UKDMC Status Report 05/07/99 1. NaI SMALL ARRAY 2. NAIAD (50 kg scale up) 3. ZEPLIN I (Lq Xe with PSD) 4. ZEPLIN IIa (two phase Lq Xe) ZEPLIN IIb (advanced.
Long-Baseline Neutrino Facility LBNF LBNC: Far Site Update and Planning Mike Headley LBNF Far Site Facilities Project Manager January 11, 2016.
Alex Howard, Imperial College Slide 1 July 2 nd 2001 Underground Project UNDERGROUND PROJECT – Overview and Goals Alex Howard Imperial College, London.
SNOLAB Science & Scientific Development Andrew Hime On behalf of the Experiment Advisory Committee Aug. 15, 2005 SNOLAB Surface Building.
1 South Parade, Doncaster, South Yorkshire, DN1 2DY, UK Tel: +44 (0) Fax: +44 (0) ALAN AULD GROUP LTD The design of a pan-European.
Laguna-LBNO-Pilot Implementation Model for an underground science infrastructure at Pyhäsalmi ECONOMIC REALIZATION PLAN FOR THE INFRASTRUCTURE DEVECON.
23/11/05BENE meeting at CERN1 (22-25 November 2005) L. Mosca (CEA-Saclay) The MEMPHYS project MEgaton Mass PHYSics in a Large International Underground.
Presentation to Board of Education 1 August 2014 Facilities Capital Plan Board of Education Update August 28,
Deep Science at Boulby Underground Laboratory:
LBNF/DUNE Update Public Meeting Sanford Lab Update
LAGUNA and beyond GDR Neutrino at Orsay-PNO October 11th, 2010
UK Status and Plans Scientific Computing Forum 27th Oct 2017
Community PP science reviews
XAX Can DM and DBD detectors combined?
Preliminary Project Execution Plan
Presentation transcript:

Boulby Laboratory (UK) Middlesborough Whitby Staithes York

Boulby Laboratory

Stub B Stub A Low Background Lab ZEPLIN - IIZEPLIN - III DRIFT-I Lab Mess Gas/fire sensor control Workshop Store DRIFT -II Store / DRIFT -II Phase B Materials clean-off Change area Air shower Boulby Dark Matter Detectors

Activity at the Boulby Facility The ZEPLIN III dark matter experiment is continuing at Boulby, through second data run. Results from first run are now published (see next) The DRIFT II dark matter experiment is supported by NSF. Recent visit by NSF (Jim Whitmore) very successful and awaiting extension funding for post Recent upgrade successful (see next). The DRIFT III dark matter proposal underway. SKY0 climate change experiment completed (cloud formation by cosmic rays). Next generation SKY-I experiment proposed for Boulby. LAGUNA ( kton neutrino physics) design study continues. Boulby is one of 7 European sites being considered (see next). Technical feasibility of cavern confirmed by AAE Ltd. mining consultants Geo-physics and detector research projects also underway Science at Boulby is strongly supported by the mine company CPL: There is an executive board that oversees this - Graham Clarke (CPL manager); Geof Tomlinson (Sheffield); David Petley (Durham Geophysics); Mike Cowling (Crown Estates); Sean Paling/Neil Spooner

Neil Spooner - SheffieldCOSMO /09/09 August 2009 First science run Recent ZEPLIN III Result ZEPLIN III at Boulby two-phase 8 kg (fiducial) 31 2 ” PMTs bottom only

Recent DRIFTII Upgrade Multi-panel 0.9μm thick DRIFT cathode cathode tested at full voltage (32.5kV)

DRIFT II is now volume limited.... not background limited No compromise on directional sensitivity needed to achieve this DRIFTII SD Limit This new SD llimit is achieved with no compromise on directional sensitivity (others experiments on plot do not have this) this is ~x1000 better than any competitor directional WIMP detector

DRIFT III Concept for Boulby

LAGUNA - new ramp complete 440 page design document completed for Boulby New Ramp down into hard dolomite rock at m depth completed (this is m below the salt level of the Palmer lab)

LAGUNA at Boulby GLACIER Liquid Argon Cavern Design completed by AMCO Ltd amd AAE Ltd. diamater 80m

ANSYS Geo-technical simulations by AAE Ltd. confirm technical feasibility of LAGUNA at Boulby LAGUNA Cavern is Feasible at Boulby

Conclusion We (including CPL) are waiting hopefully for STFC to honour commitment to interim support while we put in place alternative funding and new experiments. Palmer lab operating costs are ~£300K/year (JIF/PPARC capital investment was £3.1M). Decommissioning costs are high because of the need to remove all materials from the Palmer excavation for safety reasons. Boulby continues to produce world leading science and is in demand (e.g. NSF, Danish agencies....)