Consult21 Line Access Working Group Voice Line Access Sub-Group 27 Jan 2006 Martin Whewell Openreach MSAN Voice Access Product Requirements.

Slides:



Advertisements
Similar presentations
Carrier Pre-Select Meeting BT Systems Interface Roadmap
Advertisements

Current thinking. Subject to change. October 2011 BENEFITS OF BUILDING AN IN-HOUSE CONTENT DISTRIBUTION NETWORK (CDN)
11 Ofcom Consumer Switching final statement Next steps for BT Bev Bytheway-Jackson WBC Product Manager 10 th February 2014.
Current thinking. Subject to change. Rory Murphy Head of Digital Media Propositions & Customer Engagement BT Wholesale March 2011 BENEFITS OF BUILDING.
Emergency Services Workshop UK VoIP 999/112s John Medland – BT 999/112 Policy Manager.
EoI was introduced with Functional Separation
Extension to Flexible Appointment Portfolio: More Focused Appointments (MFAs)
11 Ofcom Consumer Switching 17 June 2014 Bev Bytheway-Jackson WBC Product Manager Tel:
Title Consult 21 Mike Reed - Openreach Name 21 st February 2006.
Geoff Hammond Head of Revenue Assurance. Agenda Revenue Assurance & CRAB Focus PPC Circuit Validation PPC Radial Distance Validation Questions.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect & Portfolio Working Group NGN Interconnect - PSTN Emulation Blended Rate.
Always consult the current Carrier Price List. Examples based on 10 March 2010 Price List Uncontrolled when downloaded
Roadmaps Andy Wright Natalie Walker Simon Brisbourne.
Issue: 1.1 on 23 rd April 2008 Code of Practice: Annex B Effective use of checker tools This document provides comprehensive guidance for CP/SPs regarding.
Broadband Product Road Map 2012/13 H2 2013/14 H1 2013/14 H2 20C Fibre 21C Migration from 20C IPstream to 21C Wholesale Broadband Connect Release AK 17.
©Ofcom Voice – the need to take a long term view on sector evolution Chris Rowsell 18 October 2007.
Thank you.
WLR3 Customer reference pack
Managing the Information Technology Resource Jerry N. Luftman
Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets.
Animated slides – showing jumpering changes and product architecture for WLR, LLU, SLU and GEA.
Consult21 Systems Work Package BT Architecture and eBusiness Derrick Evans 21CN Systems.
Click to edit Master title style TDM Access & TDM Backhaul PPC Forum June 12 th 2008 Ian Boothman Spyros Christou.
How Flexible is your Telephone Service?. Low Cost International Calls from Your Mobile Our system will make the International call for you All you pay.
©Ofcom NGN-based competition: An Ofcom perspective Dr Stephen Unger Director of Telecoms Technology 24 March 2005.
21CN Network Inventory Service Availability & Network Inventory Datasets 15 th September 2009 Paul Reed Owen Gardner Peter Davis.
MSO Access Network Alerts 17 th December Background  Objective – Update on the success of a pilot to identify Major Service Outages in the access.
©OTA O TA Office of the Telecommunications Adjudicator 1 11/10/20041 High Level Review and Status of Activities under the Telecommunications Adjudicator.
SEPARATING THE TRANSPORT LAYER, LEVELING THE PLAYING FIELD? Chris Witteman, Staff Counsel* California Public Utilities Commission *These.
For discussion purposes. No implementation assurances 1 Consult 21 Interconnect Working Group NGN Interconnect - PSTN Emulation Technical Consultation.
Going faster and staying in control - Building the world’s biggest NGN Tim Hubbard Head of Technology Futures.
STEERING BOARD Market sector representation ~ Debating Policy ~ Escalation of Issues ~ Agreement on when formal Consultation is required Engagement between.
Standard Contract Forum 31 January Customer Suite, BT Centre, London.
NGN Multi-Service Interconnect Link (NGN-MSIL) Robin Charles.
Anthony Stephens 21CN Customer Engagement 1 21CN High Level Consultation Plan The following plan provides a four month view of key consultation themes.
NGN Interconnect Update JOINING THE THREADS 25 May 2005 FOR WG DISCUSSION ON 3 JUNE.
Equal Access: Space, Power & Common Infrastructure – LLU and 21C Gary Williamson Openreach LLU Business Improvement Manager January 2006 Queries to
Consult21 Broadband Products Webinar – 18 th October 2007 Cleo Carris-Jones Mandy Ogbodobri Raf Leadbetter Intro: Bill du Cann.
Rafael Leadbetter Head of CNS broadband converged & multimedia services John Barton Voice Services & Interworking Design Authority Arvind Maheshwari WBCC.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Introduction to 21CN Resilience Tim Hubbard Head of 21CN Solutions Strategy.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
21CN Legacy Interconnection Working Group 17 th December 2004 Auditorium City Place, Gatwick.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
BT Wholesale TDM Circuit Strategy “Evolution rather than revolution” Consult 21 – Industry Webcall 29 th January 2009.
Obligatory Products: Consultation Closures Anthony Sheppard Portfolio Strategy.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
Consult21 Consult21 – Systems & Processes Expert meeting - Business Welcome.
WBC Quality of Service (QoS) Options 23 rd October 2008 Andy Maddocks Dave Brennan Paul Fishburn Paul Burke.
PPC Industry Forum, 4 December Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.
What’s New in Fault Diagnostics The Fault Diagnostics upgrade to 15.2 specification will be split into two upgrades for this release, the first.
PPC Industry Forum, 2 nd March, Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to check.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
CONSULT 21 Broadband and LLU Working Group BROADBAND AND LLU PRODUCTS - MIGRATION TO 21CN Ynyr Roberts BTW 16 th June 2005.
Consult21 Consult21 Working Group – Broadband and LLU 3rd Meeting 19 April :00 – 14:00 WELCOME.
Consult21 Information is subject to change and is for discussion purposes only. Any dates/timings are the current anticipated timescales and may be subject.
PPC Industry Meeting 1 st December Data & Connectivity Development. Wholesale Product Management (WPM) Disclaimer BT has taken reasonable care to.
Information in this presentation is subject to change NEXT GENERATION BROADBAND UPDATE Thursday 3 April 2008 Delivered over BT’s 21 st Century Network.
Consult21 Systems & Process Working Group 19th October 2005 Welcome.
MSAN Industry Experts Group 4 November 2005 Martin Whewell openreach Product Design.
Billing programme web call 11 th September 2008 Welcome Keith Wilkins Billing Development Graham Crane Consult21 & 21C Customer Experience.
Broadband and LLU Working Group 18 January Broadband and LLU Working Group Membership BT Industry representatives Terms of Reference To ensure a.
For discussion purposes. No implementation assurances Interconnect Links and Congruent Call pricing Robin Charles, Clive Feather and Ian Self The information.
Innovation in the Access Network- Our evolving portfolio and ecosystem
BT’s digital voice transformation programme
the first card insert text here.
MOD 258A Demand Estimation Sample Point – Shipper Report.
Guide to Broadband Ordering Options Version 1
Presentation transcript:

Consult21 Line Access Working Group Voice Line Access Sub-Group 27 Jan 2006 Martin Whewell Openreach MSAN Voice Access Product Requirements

martin whewell Jan 06 Openreach For Discussion purposes – no commitment to delivery  Meeting Objectives To progress the development of an new Voice Product To agree the methodology of the working group To encourage industry consensus on requirements To seed the drafting of a fully rounded requirements specification......But NOT to resolve issue of signalling interface standards

martin whewell Jan 06 Openreach For Discussion purposes – no commitment to delivery BT Wholesale High Level Portfolio Design CP Openreach WLR Line/ Select Svcs CPS Calls Voice Mail IPStream SMPF Fixed Text Fullfil Assure Bill

martin whewell Jan 06 Openreach For Discussion purposes – no commitment to delivery BT Wholesale High Level Portfolio Design CP1 Openreach WLR Line/ Select Svcs Alt Calls Fullfil Assure Bill CP2 Voice Sig i/c

martin whewell Jan 06 Openreach For Discussion purposes – no commitment to delivery Wholesale Line Rental Upstream Supply of WLR Components Provide Copper Field Repair Jumper Circuits Line Diagnos tics Supply Line Card Configure Services Allocate Number Backhaul and Core Network Jumper records Line Plant Inventor y Circuit Number s Numbe r/Servic e Profiles Routeing/ Diagnostics and MIS NTE and D-side copper MDF and E-side copper Line Card and Access Conc Call Control Trace Calls Directory Entry Process Data/Inventory Physical Component

martin whewell Jan 06 Openreach For Discussion purposes – no commitment to delivery Example Service Wrap Provision Order for line through openreach B2B gateway Real-time transactional ebXML Line card and network configuration supplied to openreach by BT Wholesale Multi-product orders and migrations as per WLR Repair openreach B2B gateway KCI Touch-points Billing Consistent Line rental charges Composite openreach bill Performance KPIs as per WLR

martin whewell Jan 06 Openreach For Discussion purposes – no commitment to delivery WLR3 High Level Product Requirements Here’s an example specification which was used for the collection of requirements for WLR3 which may be used as a starting point for the definition of the new Voice Product

martin whewell Jan 06 Openreach For Discussion purposes – no commitment to delivery  Next Steps Agree Product Naming Industry to ratify HLRD Formal submission or SoR Resolution of Signalling interface specification Plan future activities