1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

Demonstration of the Beam loading compensation (Preparation status for ILC beam loading compensation experiments at ATF injector in this September) (PoP.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
CTF3 commissioning status R. Corsini - CTF3 committee 17 th September 2009 Update on CTF3 Operations and schedule This time I will try to give a more complete.
Test Facilities Sami Tantawi SLAC. Summary of SLAC Facilities NLCTA (3 RF stations, one Injector, one Radiation shielding) – Two 240ns pulse compressor,
AWAKE electron source New Electron Source WP at CERN
Drive Beam and CTF 3 International Workshop on Linear Colliders 2010 October 22, 2010 Erik Adli, Department of Physics, University of Oslo and CERN Bernard.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
CTF3 photo injector laser status CERN 17 July 2009 CLIC meeting.
CTF3 BPMs October 18-22/2010 IWLC2010 CTF3 BPMs Lars Soby 1.
IWLC - 21st october 2010Califes CTF3 probe beam - Wilfrid Farabolini1 CTF3 Probe Beam Status 1.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
CTF3 Probe Beam G. A. Blair Royal Holloway Univ. London CTF3 Meeting, CERN 30 th November 2005 Introduction – UK Context Draft Proposal Future prospects.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
Contribution from Pakistan to CLIC & CTF-3 Project. NASIR ABBAS
CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector.
1 R. Corsini – CLIC Project Meeting CTF3 Update CTF3 Update R. Corsini for the CTF3 Team 1.
TBTS Test Program & Schedule G. Riddone
P. Urschütz - CTF3 Collaboration Meeting 2007 CTF3 commissioning & operation in 2006 P. Urschütz for the CTF3 operations team  Commissioning of the Delay.
1 CTF3 collaboration meeting Jan 2008 G.Geschonke Status of CTF3 G.Geschonke CERN.
Injector Options for CLIC Drive Beam Linac Avni Aksoy Ankara University.
Accelerator Activities at Spain Madrid CIEMA T CMAM Valencia IFIC Bilbao ESS Barcelona ALBA UPC Sevilla CNA 1 PAC-ILC May 2010.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
CTF3 Drive Beam studies results & Program Piotr Skowroński for the CTF3 team 30 December 2013 CLIC Workshop
Oleksiy Kononenko CERN and JINR
1 CTF3 Collaboration Board Jan 2008 G.Geschonke Status of CTF3 G.Geschonke CERN.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
Drive Beam Injector Drive Beam Accelerator X 2 Delay Loop X 5 Combiner Ring Two-beam Test Area 3.5 A  s 150 MeV 35 A ns 150 MeV 150 MV/m 30.
CLIC DB injector facility, photo-injector option studies LCWS, Granada, September 26 th -30 th,2011Steffen Döbert, BE-RF  CLIC DB injector  Thermionic.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
High-efficiency L-band klystron development for the CLIC Drive Beam High-efficiency L-band klystron development for the CLIC Drive Beam CLIC workshop,
R. Corsini CLIC work-package planning meeting 2-3 November 2011 Introduction to the session.
J.P.Delahaye Journees Thematiques DAPNIA “Accelerateurs” ( ) 1 The CLIC Study and the DAPNIA participation The world-wide scene about Linear Colliders.
Status of CTF3 G.Geschonke 1CTF3/CLIC Collaboration Board
Status and plans of drive beam components and tests Status and plans of drive beam components and tests CLIC review, March 1 st, 2016Steffen Döbert, BE-RF.
ELENA installation progress F. Butin / ELENA collaboration.
XB-10 1st December 2010TBTS Status- Wilfrid Farabolini1 Status of the CLIC Two-Beam Test Stand 1.
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
CALIFES A proposed electron beam test facility at CERN
Work packages : Overview of experimental verification, CTF3 and CLIC Zero R. Corsini for the CLIC/CTF3 Collaboration Basically all WP scientific and.
CLIC work program and milestones
Phase Feed-Forward Piotr Skowroński (CERN)
Linac beam dynamics Linac dynamics : C. Bruni, S. Chancé, L. Garolfi,
First Year of Operation at the Two-beam Test Stand
CTF3 Collaboration Board May 2009 G.Geschonke
PHIL: A TEST BEAMLINE AT LAL Specifications of PHIL
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
CLEX* Status and Plans CTF3 complex CLEX
Status of the CLIC main beam injectors
Operation of the High-Charge PHIN RF Photoinjector with Cs3Sb Cathodes
TBL, Status, Plans, Experiments
Have a chance to operate your own beam at CERN
Oversea collaborators
The situation is far better than I had thought.
CTF3 Collaboration Technical Meeting January 2008
WP11: electron and proton beam testing
Measurements, ideas, curiosities
SuperB project. Injection scheme design status
Electron Source Configuration
Advanced Research Electron Accelerator Laboratory
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Explanation of the Basic Principles and Goals
CLIC Feasibility Demonstration at CTF3
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Two-beam Test-stand Design and Construction Status
Presentation transcript:

1 CTF3 collaboration meeting 2007 G.Geschonke Status Status of CTF3 G.Geschonke CERN

2 CTF3 collaboration meeting 2007 G.Geschonke Status DL CLEX building in CTF3 Programme 2006 Thermionic gun CR TL GHz production (PETS line) and test stand Photo injector / laser tests from 2006 Linac

3 CTF3 collaboration meeting 2007 G.Geschonke Status Next steps: 2006 (shown at last collaboration meeting) Fully commission Delay Loop - done Separate Linac from rest of machine -done 30 GHz power testing -done Construction of CLEX building - started Install and commission Combiner Ring - ongoing Combiner Ring and TL1: Optics: INFN ü Magnets: BINP/CERN/Lure/CIEMAT/ INFN ü Power supplies: CERN ü RF deflectors: INFN ü Septa: CIEMAT MoU not signed yet Kicker: CIEMAT/CERN ü pulser: CIEMAT/CERN ü 3 GHz source: CERN ü Controls: CERN ü BPM electronics: LAPP / CERN ü Vacuum chamber + BPM: INFN MoU not signed yet If the expected contributions will be provided, the Combiner Ring will be built to schedule

4 CTF3 collaboration meeting 2007 G.Geschonke Status DL CLEX building in CTF3 status 2006 Thermionic gun CR TL GHz production (PETS line) and test stand Photo injector / laser tests from 2006 On schedule so far Linac Combiner Ring installation ongoing, commissioning start in April 2007 Beam up to here Laser at CERN RF gun under construction TL1 commissioned

5 CTF3 collaboration meeting 2007 G.Geschonke Status CTF3 in 2006 Linac Delay Loop Transfer Line TL2 and Combiner Ring 30 GHz RF power testing Beam up to here

6 CTF3 collaboration meeting 2007 G.Geschonke Status RF power plant 10 s-band klystrons 3 GHz 35 – 45 MW, 5.5  s 9 with pulse compressors: factor 1.9 – 2 (1.6  s) 3 L-band travelling wave tubes 40 kW, 3  s 1.5 GHz BW >200 MHz 1 L-band klystron 22 MW, 5.5  s RF Pulse compression LIPS BOC first 5 klystrons: ~ 5000 hours operation in klystrons replaced 3 thyratrons replaced phase and amplitude stability under investigation

7 CTF3 collaboration meeting 2007 G.Geschonke Status CTF3 main activities in 2006 a) Commission Delay Loop GHz bunching system, beam dynamics studies Three 40 kW travelling wave tubes at 1.5 GHz installed travelling wave wide-band buncher for fast phase coding at 1.5 GHz fast phase switch, 5-pulse recombination 1.4 us train length, 3.5 A peak current

8 CTF3 collaboration meeting 2007 G.Geschonke Status CTF3 main activities in 2006 b) Operation for 30 GHz CLIC component testing 100 MW produced at 30 GHz, operation for 30 GHz now routine, largely automatic, supervision from CCC Separation wall decouples operation of linac for 30 GHz testing from installation

9 CTF3 collaboration meeting 2007 G.Geschonke Status CTF3 main activities in 2006 c) Installation of : Combiner Ring and Transfer Line TL1 TL1 installed, commissioned with beam, Combiner Ring injection region commissioned, Combiner Ring installation: all magnets, septa, kicker installed, vacuum chambers and beam diagnostics will be installed before March 2007

10 CTF3 collaboration meeting 2007 G.Geschonke Status Improvements Big effort to improve operational reliability water temperature stability for RF pulse compression: new system gives stability within ± 0.02 degrees ! automatic system for 3 GHz conditioning, as well as 30 GHz operation for CLIC structure copnditioning/testing supervision from CCC now possible Beam dynamics studies: Emittance measurements, better understanding of the machine: model fits machine

11 CTF3 collaboration meeting 2007 G.Geschonke Status 1. period: DL commissioning, Beam dynamics studies operation for 30 GHz at nights and weekends 2. period: operation for 30 GHz power production only, installation of TL1 and CR 3. period: Commissioning TL1 and CR injection, operation for 30 GHz at nights and weekends Operation nearly all year !

12 CTF3 collaboration meeting 2007 G.Geschonke Status CLEX building Construction on schedule Equipment installation from May 2007, Beam foreseen from March 2008 June Jan 2007

13 CTF3 collaboration meeting 2007 G.Geschonke Status Collaborating institutes * India has not signed the CTF3 MoU, but has an agreement with CERN for the development of novel accelerator technologies new member Discussions with : Pakistan, Iran, UK (Cockcroft Institute, J.Adams Institute), JLAB, EPFL, INFN Milan 16 members involving 21 Institutes Collaboration with RAL within PHIN

14 CTF3 collaboration meeting 2007 G.Geschonke Status Ongoing work (2006 and later) INFN vac chambers, BPI, installation, optics, operation CIEMAT correctors, BINP quadrupoles LURE quadrupoles CERN magnets, BPM, infrastructure, installation NWU RF bunch length monitor LAPP BPI/BPM electronics INFN vac chambers, BPI, wiggler, installation, optics, RF deflectors CIEMAT correctors, septa, kicker + pulser BINP quadrupoles, sextupoles LURE quadrupoles CERN Infrastructure, RF power, installation, magnets, Beam diagnostics, vacuum Uppsala Bunch phase monitor LAPP BPI/BPM electronics RRCAT optics, 5 bending magnets, Al vacuum chambers TSL magnets CERN Infrastructure, vacuum, magnets, installation HIP Helsinki CERN CIEMAT SLAC structure testing Ankara Universities, INFN, JINR Dubna automatic conditioning RRCAT software CERN IAP Project is covered including TL2. PSI additional modulator NWU: Beam loss monitoring

15 CTF3 collaboration meeting 2007 G.Geschonke Status Ongoing work in CLEX (2006 and later) Instrumentation Test Beam Line not presently funded (FP7 GADGET proposal) CEA Dapnia Saclay overall responsibility CERN CEA laser beam line, laser beam conditioning LAL RF gun for photo injector Uppsala University Two Beam Test Stand CERN PETS and Accelerating structure CIEMAT magnet movers, PETS prototype,(+ series ????), PETS tank (series ???) UPC & IFIC : BPM development + electronics (series ???) CERN overall responsibility, optics, RF equipment, diagnostics, infrastructure, quadrupoles ??? Pakistan: stainless steel vacuum components + ??? Iran: RF + Beam dynamics simulations

16 CTF3 collaboration meeting 2007 G.Geschonke Status Photo Injector Phase 1: off-line testing from 2007 Phase 2: Gun in CTF3: earliest spring 2008 ????? smaller emittance, faster phase coding, no “satellite bunches” Cs 2 Te photo cathode 3% QE 40 hours life time pulse train: 1.5  s, charge per bunch: 2.33 nC bunch spacing 0.67 ns number of bunches: 2332 diode pumped Nd:YLF laser 10  J IR / bunch 0.37  J UV on cathode /bunch LAL CERN RAL Present status: RF gun being built, Laser at CERN, needs to be finished with strong involvement from CERN, INFN Frascati and Milan Laser is needed also for CALIFES injector !

17 CTF3 collaboration meeting 2007 G.Geschonke Status Plan for 2007 start with beam 2. half March, Commission Combiner Ring operation Install vacuum system for Combiner Ring operate for 30 GHz production like in 2006: nights and weekends, supervised by CCC full-time during installation of TL2 Install equipment in CLEX from May 2007 Install TL2: Finish optics, detailed layout produce all vacuum elements produce magnets, power converters Very ambitious, spill over into 2008 ?

18 CTF3 collaboration meeting 2007 G.Geschonke Status 12 GHz Decision to change CLIC structure development from 30 GHz to 12 GHz For 30 GHz: bunch repetition frequency in Linac: 1.5 GHz increase by x2 in DL x5 in CR  15 GHz For 12 GHz: bunch repetition frequency in Linac: 1.5 GHz increase by x2 in DL x4 in CR  12 GHz small circumference change in CR can be accomplished with wiggler  no effect on hardware  30 GHz structure programme continues for the moment  12 GHz PETS in TBL  12 GHz PETS and accelerating structures in Two Beam Test Stand smaller nominal beam current: can be increased by higher current in linac and higher RF power (shorter pulse) Effect on CTF3:

19 CTF3 collaboration meeting 2007 G.Geschonke Status DL CLEX building in Conclusion 2006 Thermionic gun CR TL GHz production (PETS line) and test stand Photo injector / laser tests from Linac Beam up to here 2007

20 CTF3 collaboration meeting 2007 G.Geschonke Status Conclusion Highly motivated team, excellent collaboration between all partners Programme almost on schedule Commissioned up to including TL1 and CR injection Combiner Ring to be completed in 2007, TL2 in 2007 (?) CLEX : many components covered by collaboration some still missing Already demonstrated: full Beam Loading operation of linac Phase coding of bunches Bunch Interleaving in Delay Loop

21 CTF3 collaboration meeting 2007 G.Geschonke Status Meeting Objectives Define some open questions: BPM / BPI: electronics TBL diagnostics – monitor + read-out PETS TBL: Advance on tank design Open topics not covered: TBL RF + other diagnostics - discussions with EPFL started, analog front-end ? TBL series components: quadrupoles, PETS, diagnostics Machine protection Radiation monitoring