AASHTO Standing Committee on Research July 26, 2011 Accelerating solutions for highway safety, renewal, reliability, and capacity Update.

Slides:



Advertisements
Similar presentations
Moving transportation into the future Strategic Highway Research Program.
Advertisements

Overview What is the National ITS Architecture? User Services
Chris Albrecht, AICP I-Walk Webinar March 1, 2011 Transportation Research, Data, and Safe Routes to School.
FHWA’s Sustainable Highways Initiative And Self-Evaluation Tool
MAP-21 Performance Management Framework August 8, 2013 Sherry Riklin Bob Tuccillo Angela Dluger The Moving Ahead for Progress in the 21st Century Act (MAP-21)
AASHTO SUBCOMMITTEE ON CONSTRUCTION AUGUST 2010 SHRP 2 Renewal Program Overview.
Title Subtitle Meeting Date Office of Transportation Performance Management MAP-21 Moving Ahead for Progress in the 21 st Century Performance Management.
SHRP 2 Naturalistic Driving Study [Presenter’s Organization] [Presenter’s Name] [Presenter’s Title] Accelerating solutions for highway safety, renewal,
Stimulating Innovation and the U.S. Economy through the U.S. DOT’s Small Business Innovation Research (SBIR) Program The National Transportation Systems.
SHRP2 Implementation | July 22, 2014 Implementation Update AASHTO RAC Meeting, July 22, 2014 Debra Elston, Director, Office of Corporate Research, Technology,
Safety Implementation Update AASHTO RAC Meeting, July 22, 2014 Ann Brach, TRB, Director, SHRP 2 Debra Elston, Director of Corporate R&T, FHWA.
AASHTO Subcommittee on Maintenance - PTWG July 18, 2011 System Preservation Research Roadmap Implementation and Tracking Stephen R. Mueller, P.E., MPA.
SHRP2 Implementation Update to the Standing Committee on Highways Pam Hutton, AASHTO May 29,
Traffic Incident Management – a Strategic Focus Inspector Peter Baird National Adviser: Policy and Legislation: Road Policing.
Progress Report Reliability Focus Area Subcommittee on Systems Operation and Management June 2009.
Moving Research into Practice.  Implementation is the routine use of a SHRP 2 product by users in their regular way of doing business.  Users can include.
AASHTO Subcommittee on Rail Transportation Sept. 18, 2012 Kevin Chesnik.
4/07/09 Briefing to Senate & House Committees on Labor American Recovery and Reinvestment Act of 2009 STATE ENERGY SECTOR PARTNERSHIP AND JOB TRAINING.
Low Cost Safety Improvements Pooled Fund Study (PFS) presented by Kim Eccles, P.E. Senior Engineer, VHB.
Federal Highway Administration,, US DOT Freight Modeling Research, Funding, and Collaboration Tianjia Tang, Ph.D., PE Office of Freight Management and.
1 TAMPering with Research- How Research was used in developing GDOTs Transportation Asset Management Plan (TAMP) Georgene M Geary, P.E. State Research.
U.S Department of Transportation Federal Highway Administration Federal Transit Administration MAP-21 Moving Ahead with Progress in the 21 st Century Linking.
FHWA Research and Technology Federal Highway Administration Nice to do or NEED TO DO Debra Elston Federal Highway Administration Turner-Fairbank Highway.
Accelerating solutions for highway safety, renewal, reliability, and capacity SHRP 2 Outreach and Implementation AASHTO Technology Implementation Group.
Releasing Your Inner Innovator Kathleen Penney CH2M HILL.
PROJECT DESCRIPTION BORDER WAIT TIME WORKING GROUP.
1 SHRP 2 Implementation Outcomes and Products July 28, 2010 Accelerating solutions for highway safety, renewal, reliability, and capacity.
SHRP 2 - FIRST DEMO PROJECT KEG CREEK, IOWA R04 – “BRIDGE DESIGNS FOR RAPID RENEWAL” Sandra Larson, P.E. Iowa Department of Transportation Research and.
AASHTO Research Advisory Committee July 24, 2012 Accelerating solutions for highway safety, renewal, reliability, and capacity Innovation in Lean Times.
Implementation Overview Research Advisory Committee July 24, 2012.
1 National Cooperative Highway Research Program (NCHRP) Research for Improved Highway Operations and Maintenance National Cooperative Highway Research.
AASHTO SCOHTS SUB COMMITTEE ON SAFETY MANAGEMENT STATUS UPDATE APRIL 29, 2009 Chicago, Illinois.
ITS Program Update Moving Towards Implementation of Wireless Connectivity in Surface Transportation Talking Freight Webinar January 19, 2011.
ITS : A National and Regional Perspective Tony Kane American Association of State Highway and Transportation Officials ITS –DC DOT Workshop Howard University.
SHRP2 Safety Implementation 2013 Mid-Continent Transportation Research Symposium – August 15, 2013 Gateway Hotel and Conference Center – Ames, IA Monique.
Implementation Overview SHRP 2 Oversight Committee June 18, 2012.
Working Together to Save Lives An Introduction to the FHWA Safety Program for FHWA’s Safety Partners.
Efficiency through technology and collaboration SHRP2 and Every Day Counts Products September 9, 2015 David Otte - KYTC Jason J. Siwula, PE – KYTC.
ITS Standards Program Strategic Plan Summary June 16, 2009 Blake Christie Principal Engineer, Noblis for Steve Sill Project Manager, ITS Standards Program.
NCHRP AASHTO’s Research Program State DOTs Funds (5.5% of SP&R given voluntarily) Problems Applied research focus National issues Shared issues Contract.
TRB SAFETY ACTIVITIES TRB SAFETY ACTIVITIES A BRIEF SUMMARY.
Weather Information for Surface Transportation: AASHTO Activities June 13, 2006 WIST Workshop Presented by Leland D. Smithson AASHTO SICOP Coordinator.
Working Smart for the Customer’s Benefit Pam Hutton AASHTO SHRP2 Implementation Manager June 11, 2013.
James McMinimee, P.S.E. July 27, 2011 AASHTO SCOR/RAC Meeting Salt Lake City, Utah.
National Cooperative Highway Research Program (NCHRP)
2010 SCOHTS Annual Meeting Ken Campbell SHRP2 Chief Program Officer Accelerating solutions for highway safety, renewal, reliability, and capacity.
Accelerating solutions for highway safety, renewal, reliability, and capacity AASHTO Design Subcommittee Albuquerque, NM July 17, 2008.
Context and Priorities April 9,  Why FHWA Focuses on Improving Operations  FHWA Operations Program Areas  Key Current Program Priorities.
Connected Vehicles Workforce FHWA Vehicle-to-Infrastructure
TraCS National Model Overview T3 Webinar Thursday, June 12, 2014 David Meyers Program Manager for Traffic and Criminal Software (TraCS) Program Iowa Department.
PHASE 1 OF SHRP 2 DATA IMPLEMENTATION & OVERSIGHT WATER SCIENCE AND TECHNOLOGY BOARD Update on TRB Activities July 29, 2015 PHASE 1 OF SHRP 2 DATA IMPLEMENTATION.
Module 2-1 The Foundation For Road Safety Management Policy History and Institutional Structures of Road Safety Management Think about it …
Connecticut-Delaware-District of Columbia-Maine Maryland-Massachusetts-New Hampshire-Vermont New Jersey-New York-Pennsylvania-Rhode Island Region 1.
SHRP2 Reliability Implementation | February 2013 When Research Meets the Road Reliability Focus Area February 7, 2013.
Strategic Highway Research Program 2 – Safety Component (SHRP2 Safety) 2012 Update Forrest Council.
SHRP2 Capacity Implementation | February 2013 When Research Meets the Road Capacity Focus Area February 4, 2013.
Greta Smith, P.E. Associate Program Director, Project Delivery AASHTO Subcommittee on Design June 5, 2013.
FHWA Update SHRP2 Implementation and Other Agency TSMO R&D Efforts Tracy Scriba, FHWA 12/8/15 1.
International Outreach Overview TRB Annual Meeting, 2007.
USDOT ITS and Operations Training Grant Zammit Operations Technical Service Team Manager Office of Technical Services – Resource Center
Overview of SCOH Strategic Plan AASHTO Subcommittee on Design 2010 Annual Meeting Rick Land, Vice Chair AASHTO Highway Subcommittee on Design and Chief.
1 NTOC Talking Operations – Road Weather Management – September 30, 2008 PERFORMANCE MEASURES FOR ROAD WEATHER MANAGEMENT Roemer Alfelor FHWA Road Weather.
Improving Safety in the NASTO States by Using SHRP2 Solutions
Moving transportation into the future
Pam Hutton, PE AASHTO SHRP2 Implementation Manager Ken Jacoby, PE
Innovation in Lean Times
Accelerating solutions for highway safety and performance
FHWA TSMO / SHRP2 Research
Status Update AASHTO RAC
Presentation transcript:

AASHTO Standing Committee on Research July 26, 2011 Accelerating solutions for highway safety, renewal, reliability, and capacity Update

Overall Status ~100 contracts; 20 complete; 70 active; a few yet to be awarded 313 separate research entities involved SAFETY-LU extension added $47.8 million; additional funds with FHWA Extended cooperative agreement with FHWA to March 2015 Increasing focus on preparing for implementation

Safety Highlights Naturalistic driving study in place in all 6 sites: NY, PA, IN, FL, NC, WA 650+ vehicles on the road Data coming in: 40,000+ trip files 2 minor crashes Roadway data collection to begin this fall: Fugro Roadway First analysis projects later this year Data sharing policies, procedures, website

Behind the scenes … 2-year design process 1-year site contractor ID process Manufacture of 2500 custom-designed data acquisition systems Review/approval by 8 (now 6) ethics boards Outfitting the sites (leases, hiring, security, IT, equipment, training, site inspections) 11 custom software to support & installation; custom hardware to support installation Site support & coordination; trouble-shooting

Example Uses of NDS Data Improve roadway geometry, signing, markings Improve design of vehicles and in-vehicle devices, warning systems, etc. Improve driver education for teens Develop assistance for older drivers Data-based laws regarding use of hand-held devices (by teens, truckers, all drivers) Planning, highway operations, fuel efficiency, environmental effects

Renewal Highlights TRB’s 1 st e-book: DOT-RR project agreement strategies Web-based tools: geotech designs; choosing utility location technologies Demos: IA-replace bridge in 2 weeks; NY- replace bridge over weekend Risk workshops, real-time PCC smoothness measurement, composite pavements, NDT technologies, performance specs for rapid renewal, use existing pavements in place

More Examples of Products Modular and composite pavements Risk manual for innovative contracting Integrating utility and DOT priorities Railroad-DOT mitigation strategies Reducing personnel fatigue Innovative project management Performance and incentive specs Corridor/network planning for renewal

Reliability Highlights Foundational projects: definitions, measurement, monitoring, training, institutional change/practices Strategic implementation planning workshop Archive for reliability data “Capstone” project: framework for improving reliability, integrates all results

Capacity Highlights TCAPPS: for collaborative decision making TPICS: for economic impact analysis Performance measurement All available in as a web-based tool (beta version) Adding: GHG, smart growth, private sector involvement

Capacity: Pilots Advanced travel demand models: state and local agencies in Jacksonville, FL, and Sacramento, CA Collaborative decision making tool: CO, WA, MN Green house gas workshops: MA, MN, CO, WA Pilots of ecological tools: CA, CO, OR, WV Strategic plan for freight: global freight research consortium; modeling/data symposium and innovation award

Preparing for Implementation TCCs developed plans FHWA, AASHTO, NHTSA reviewing, coordinating Steering group: TRB, FHWA, AASHTO, NHTSA May workshop: cross-cutting implementation issues

Implementation Coordination Staff Jim McMinimee, AASHTO Joe Conway, Ken Jacoby, FHWA Tim Johnson, NHTSA Jerry DiMaggio, SHRP 2

Thank You For more information, see SHRP 2 website: For presentations from 6th safety symposium: Sixth_SHRP_2_Safety_Research_Symposium_498.aspx Sixth_SHRP_2_Safety_Research_Symposium_498.aspx For recent press on NDS: / / participants-in-effort-to-save-lives/ participants-in-effort-to-save-lives/ watch-drivers-watch-the For beta version of TCAPP’s web tools: