March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.

Slides:



Advertisements
Similar presentations
Structure of the front-end DAQ for DIS PARITY in Hall A Bogdan Wojtsekhowski with Bob Michaels and Albert Shahinyan Jlab, 12/1/ 2006 The issues: e/pi rejection.
Advertisements

E status report Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting December 13 th 2007.
Compton integrating method Beam test summary PREX/Happex Collaboration Meeting Alexandre Camsonne.
The Big Family Readiness Review 1 st Run Period: Threshold Pion Production 2 nd Run Period: Transversity & d2n 3 rd Run Period: A y & 3 He(e,ed)
HyCal reconstruction: current situation current situation and future tasks. V. Mochalov, IHEP (Protvino)
G2P Target installation and Beyond. Schedule Pivot before.
Hall A Gmp / DVCS Fall preparation September 16 th 2014 Hall A meeting Alexandre Camsonne 1.
CDF Silicon Workshop th May 2006 New BLM & BLM electronics Jose E. Garcia, Jennifer Gimmell, Ulrich Husemann.
Conducting a Test Beam Experiment - Page 1 To begin with, elect an experimental spokesman, who can act as a coordinator. Survey the area to understand.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
E08-005: A y 0 in Quasi-Elastic 3 He(e,e’n) Scattering Elena Long Hall A Collaboration Meeting December 17 th, /17/2013Hall A Collaboration MeetingElena.
Short Range Correlations E07006 Run coordinator report SRC-E07006.pdf SRC-E07006.pptx.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
Hall A 12 GeV DVCS Status report December 16th 2013 Hall A collaboration meeting Alexandre Camsonne.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
AnDY Hardware. Run 12 Layout Detector set: – ZDCs, BBC-Y, BBC-B, PreShower phase 1, Ecal phase-1, Hcal phase-2.
Beamline - Harp stepper motor controller cards, software – in process, Javier - Dispersive and non-dispersive measurement capability? - Ninth dipole, Doug.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
2014 DVCS Run Preparations DVCS and GMP Symbiosis Charles Hyde.
AM Software Review. Hall C after 12 GeV Upgrade Beam Energy: 2 – 11 GeV/c Super High Momentum Spectrometer (SHMS) –Horizontal Bender, 3 Quads, Dipole.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
Updates on Using CAEN 1495 as MLU in Trigger Compton DAQ Performance at 440 kHz HV Status R. Michaels, Nov 19, 2013 p. 1 / 5.
Jin Huang M.I.T. Hall A Analysis Workshop Dec 14, JLab.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
Hall A DVCS calorimeter Operation Safety procedure September 18 th 2014 Alexandre Camsonne DVCS Readiness Review.
Hovanes Egiyan Jefferson Lab. Main Hall B Beamline Components Beam Tuning Procedure HV System in Hall B Temperature Sensors Summary 10/19/ Hovanes.
Preparation for E Pi0 Collaboration Meeting Tuesday Feb R.Lindgren.
E : (GMp) Precision Measurement of the Proton Elastic Cross Section at High Q 2 Vincent Sulkosky Massachusetts Institute of Technology for the.
Lead Fluoride Calorimeter for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory October 31 st 2008.
HPS T EST R UN C ONTINGENCY P LAN S. Stepanyan JLAB.
Hall A DAQ meeting January 12 th Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus.
MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.
NTOF DAQ status D. Macina (EN-STI-EET) Acknowledgements: EN-STI-ECE section: A. Masi, A. Almeida Paiva, M. Donze, M. Fantuzzi, A. Giraud, F. Marazita,
SoLiD/PVDIS DAQ Alexandre Camsonne. DAQ limitations Electronics Data transfer.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Calorimetry for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory Workshop on General Purpose High Resolution.
E & E status report Maxime DEFURNE CEA-Saclay/Irfu/SPhN 1.
SBS/A1n Fast DAQ Alexandre Camsonne October 19 th 2012.
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
Hall A Installation Review John J. LeRose 2/25/2009.
X>2 & SRC May 3rd – May 10th, 2011 Xiaohui Zhan Argonne National Lab.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
APEX DAQ rate capability April 19 th 2015 Alexandre Camsonne.
Moller Polarimeter Upgrading for PREx in 1)Mollar Analysis & Upgrading Works during/after 2009 PVDIS 2)Flash ADC based DAQ dead-time measurement.
SBS / A1n DAQ Alexandre Camsonne 02/27/2013. APV25 Standard VME access ok : can configure board Check address assignment in VME64X crate Need to debug.
ONCS Subsystem Status Chris Witzig (BNL), Stephen Pate (NMSU) DC Meeting PHENIX Collaboration Week 22-June-1998 Chain Test Software Subsystem Support Tests.
The GMp Experiment in 2014 Vincent Sulkosky Longwood University for the E Collaboration Hall A DVCS Collaboration Meeting December 19-20, 2013.
DAQ ELECTRONICS 18 March 2015MEG Collaboration Meeting, Tokyo Stefan Ritt.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
Hall A Update Thia Keppel User Group Board of Directors January 2015.
Understanding the 3 He Nuclei: Asymmetry Measurements in Quasi- Elastic Ge Jin University of Virginia For the E Collaboration.
Danilo Domenici – LNF. Detector Upgrades Overview CSN1 - 4 Maggio 132 Inner Tracker QCAL CCAL.
Overview of E906 Electronics, Readouts, and DAQ System E906 DAQ workshop Ting-Hua Chang (7/6 – 7/7/2009)
Counting Mode DAQ for Compton
Data Acquisition (DAQ) Status
Hall A Compton Electron detector overview
VETROC for Edet DAQ Bob Michaels (presenting) Scott Barcus Alexandre Camsonne Ben Raydo and the GRINCH group (Todd Averett et. al.) Compton Meeting.
Sergey Abrahamyan Yerevan Physics Institute APEX collaboration
during Fall GMp run (high current)
Example of DAQ Trigger issues for the SoLID experiment
AM Software Review.
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
Possible parasitic measurement during Fall GMp run
August 19th 2013 Alexandre Camsonne
Experiment DAQ and trigger GMn SBS Collaboration Meeting
Presentation transcript:

March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014

Introduction Beam available in Hall A March 11 th (13 th ? ) 3 days of tune ~2 week of beam for commissionning Commission new beamline Recomission spectrometer

Hall A upgraded systems Mostly beamline – ARC (Doug) – Compton (Dave, Bob, Alexandre ) Dipole displacement change Electron detector vacuum can modified Putting back in place background scintillators and detector to check photon rates – Moller ( Sasha, Roman ) Upgraded quads

Hall A standard beamline Need recomissionning – BCM ( Luke / Bob) 1 MHz receiver to VtoF to scalers All cabled from receiver to scaler Test with generator – BPM / Raster (Luke / Bob ) Cables ready Setup ADC for readout

HRS for GMp Standard detector and additionnal FPP straw chamber New lead glass trigger Main GM P trigger S0 S2m Main electron DVCS trigger S0 Cerenkov Efficiency trigger done with VME V1495 logic module ( Bob) New filters for ADC Large effort from Bogdan and GMp collaboration ( Kalyan, Yang, Barack, Longwu)

Left HRS VDC

Left HRS scintillators Scintillators all working being calibrated

Left HRS scintillators Scintillators all working being calibrated

Left HRS Cerenkov

Left HRS straw chamber

Left HRS pion rejector ( Longwu)

Right HRS Installed a bit later being debugged Running on adaql1 computer Most channels working Noisy/missing channels investigated

Right arm VDC

Right HRS Scintillators

Right shower preshower

High Voltage (Bob) Lecroy crates Mainframe being fixed Use laptop or intel CPU to control the boards which run server and emulates crate control System in place in both HRS and beamline Compatible with Roman JAVA gui

EPICS A little bit more complicated with firewall Best way so far – Accelerator account and cryptokey – Login to acclogin.acc.jlab.org using cryptokey – Login hlal00 using your accelerator account – Execute menubar Console in counting house Dedicated account being investigated

Scripts ( Kalyan, Bob, Alexandre ) Checking running on new adaq1 computer Reenable Start/End run script, EPICS / scaler logging Will try to post to standard HALOG and new accelerator HALOG ( Luke )

Target Cells/Cell Blocks

Counting house Computer moved and network – Left HRS DAQ running on new adaq1 computer and old adaql2 – Right HRS running on adaql1 planning to setup adaq2 2 consoles installed Some phones installed

Prelimary Run plan from Luke

Documentation Started wiki page for run information GeV_March_2014_running GeV_March_2014_running Weekly meeting Mondays 10:30 A110 Meeting

Conclusion Beamline – Need BCM, BPM at start – Moller – Finalize cabling BCM, BPM, raster HRS – All detectors in place : Left HRS almost ready besides straw chamber Right HRS being debugged NMR being worked but can borrow one if needed, can set will hall probe at beginning Left HRS mostly read. Reasonable shape to take data, need more checks for bad channels and normalization for cross sections