CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini.

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
FE electronic box Construction of end piece OT module Electronic components Mechanics Cooling.
CLAS12 – RICH PARAMETERDESIGN VALUE Momentum range3-8 GeV/c  /K rejection factor Not less than 500  /p rejection factor Not less than 100 Angular coverage5.
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Don Lynch 9/15/05 HBD Safety Review 1 Mechanical Design And Installation Hadron Blind Detector (HBD) Don Lynch.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
Single PET-module Design Update 1 TRIMAGE Meeting Munich, Dec. 12,2014 WP 3 Design and optimization of PET-system Andreas Seebacher, raytest.
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
1 The Support Structural System for Sicbar and EC Detector of SciBooNE FermiLab/PPD/MD May 08, 2006 Edward Chi.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
Dec. 4, 2001 CERN-1 Hans de Vries VELO Mechanics  RF/vacuum foil  Rectangular bellow  Wake field suppressors  Cabling Summary & Outlook VELO mechanical.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Status report on MURAY telescope R&D
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
CLAS12 – RICH PARAMETERDESIGN VALUE Momentum range3-8 GeV/c  /K rejection factor Not less than 500  /p rejection factor Not less than 100 Angular coverage5.
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
MM detector construction One or several modules per sector considerations.
SoLID HGC Update Zhiwen Zhao,Weizhi Xiong, Gary Swift Haiyan Gao,Garth Huber 2015/09/12 1.
Physics requirement Radial envelope: 1265 mm to 1473 mm 12 wedges over 2  20 tungsten layers of 2.5 mm 10 tungsten layers of 5 mm Instrumented gap 1.25.
Septembre SLAC BeamCal W. Lohmann, DESY BeamCal: ensures hermeticity of the detector to smallest polar angles -important for searches Serves as.
B-layer integration with beam-pipe and services ATLAS B-layer upgrade E. Anderssen A. Catinaccio.
RICH Installation and integration in CLAS12 October 13 th 2015 D. Orecchini, S. Tomassini 1 CLAS12 RICH- Mid Term Review.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Mechanical Designs of The Central Detector Jinyu Fu
Update on the Gas Ring Imaging Cherenkov (GRINCH) Detector for A 1 n using BigBite Todd Averett Department of Physics The College of William and Mary Williamsburg,
TPC Integration P. Colas (thanks to D. Attié, M. Carty, M. Riallot, LC-TPC…) TPC layout(s) Services Power dissipation Endplate thickness and cost Mechanical.
Takeshi Matsuda LC TPC Collaboration March 5, 2008 TPC Endcap Materials.
CLAS12 Drift Chamber Prototyping
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
12/3/2015R. Mountain, Syracuse University LHCb CO2 Cooling EDR2.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
Concept Design for LBNF Far detector (LAr single phase)
CEDAR MECHANICS Liverpool Conceptual Design (Subject to funding from STFC) 1 CEDAR Mechanics Conceptual Design.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Eric Vigeolas, July the 3 rd Status The IBL detector construction already started and the components assembly (flex, modules, stave loagin) will.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
Cloudland Instruments Hawkeye Mechanical Design Snapshot Compiled April 8th, 2016.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
- PROPOSAL FOR A SOLUTION OF A “STRAW MODULE” INTEGRATION - INFN-LNF - SPAS -STRAW MODULES INTEGRATION- INFN-LNF-SPAS- December D. Orecchini – P.
Central Tracker Cabling and Mechanics Paola Gianotti26/4/111.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
SPS High Energy LSS5 Thermal contact & cooling aspects
Concept for LOKI detector system. Rear Detector 2 Spider Cob (central detector) Octant (Out detector) Maybe subdivided in two parts.
Progress with System Integration of the CBM Silicon Tracking Detector
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
"Drawer Mechanics - MiniDrawer"
CLAS12 – RICH RICH - TECHNICAL PARAMETERS PARAMETER DESIGN VALUE
- CT INSTALLATION PROCEDURE OVERVIEW -
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
cooling and supports of the forward endcap EMC
Mechanics for front-end Electronics Of T2K-II TPCs – A Few Conceptual Ideas D. Calvet, Irfu, CEA Saclay, Gif sur Yvette Cedex, FRANCE.
LumiCal mechanical design, integration with LDC and laser alignment
Integration issues at IHEP
First of all we will remind some numbers:
Hawkeye Mechanical Design Snapshot
SIT AND FTD DESIGN FOR ILD
Initial BIS installation
Integration and IR Hall
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
NPS mechanical design 01/31/2019 Jlab meeting
Presentation transcript:

CLAS12-RICH Mechanical Design Status-Report CLAS12 RICH Review September 5-6 th 2013 S. Tomassini, D. Orecchini1 D. Orecchini, S. Tomassini

Outline Mechanical Integration and installation in CLAS12 External Envelope Frame and closing panels The Electronic Box and PMTs array Composite Mirror Optimization Composite mirror Industrial feasibility Glass Mirrors Conclusions S. Tomassini, D. Orecchini2

Mechanical Integration S. Tomassini, D. Orecchini3

RICH: Mechanical Integration In CLAS12 Side view Front view RICHRICH LTCC S. Tomassini, D. Orecchini4

RICH inter-Module clearance: 50,8mm Note: The same of the LTCC modules S. Tomassini, D. Orecchini RICH: Mechanical Integration In CLAS-12 5

RICH: Envelope Frame main dimensions The RICH envelope frame is almost the same as the LTCC envelope The RICH envelope is fully compatible with the LTCC constraints. Can be constrained to the forward carriage frame without any modification of the frame itself S. Tomassini, D. Orecchini6 RICH weight  3000 lbs LTCC weight  3300 lbs max

RICH: Mechanical Installation In CLAS12 The LTCC installation tool and procedures can be reused for the RICH installation on the forward carriage frame because of geometry and weight compatibility. Only the brackets must be rebuilt. Installation tool LTCC S. Tomassini, D. Orecchini7

Panels for connectors Forward removable panel Upper removable panel Forward side Backward removable panel Photodetector System Lateral walls Lower base Smaller base Upper base Backward stiffening frame Forward stiffening frame Forward sideBackward side RICH: Mechanical Envelope Frame S. Tomassini, D. Orecchini8

Metal Envelope Frame: Loads and Constraints All components are made of: AL 6082 T6 alloy S. Tomassini, D. Orecchini9

Total Deformation Equivalent Von-Mises stress Metal Frame: FEM analysis results at the run position Total deformation at the run position is negligible (< 1 mm / 3000 mm) Stress in the material is negligible (< 14 Mpa) S. Tomassini, D. Orecchini10

Electronic Box & PMTs Array S. Tomassini, D. Orecchini11

RICH: Inside Pictorial Views S. Tomassini, D. Orecchini12 Spherical Mirror PMTs Array & Electronic BoxFlat Mirror & Aerogel Tiles Planar mirror & Aerogel Support

RICH Module Electronic Box -House all the PMT and FEE cards -Stand alone structure that can be assembled and tested separately -Gas and light tight -More efficient thermal power dissipation -Electronic components protection RICH: Electronic Box S. Tomassini, D. Orecchini13

‘’Support Board’’ PMTs connectors PMTs side “Support Board” FEE side ASIC plus FPGA boards Stiffening frame ASIC connectors Inside the Electronic Box Support Board made of Durostone material. S. Tomassini, D. Orecchini14 # 408 tubes

ASIC Board FPGA Board PMTs 8500 Support Board & Light-tight Cover PMTs 8500 Connectors (Integrated in the Support Board) PMTs Side Support Frame S. Tomassini, D. Orecchini ASIC Board ASIC Board Connectors (Integrated in the Support Board) FEE-Side FPGA Board Electronic Box: details 15

PMTs 8500 Connectors (Integrated in the Support Board) ASIC Board Connectors (Integrated in the Support Board) PMTs 8500 Support Board & Light-tight Cover FPGA Board ASIC Board Side Exploded View Side View Support Frame INSIDE RICH SIDE OUTSIDE RICH SIDE INSIDE RICH module OUTSIDE RICH module S. Tomassini, D. Orecchini - All the E-Cards and the Cables are outside the RICH Box. Minimizing heat dissipation. Electronic Box: Installation Scheme 16

17 RICH MODULE BACK SIDE VIEW Photodetector system HV Calbles Routing Ways FE E_Cards Cables HV Calbles Routing Ways FE E_Cards Cables S. Tomassini, D. Orecchini OUTlet Cooling air pipes Inlet Cooling pipes Cables & Pipes ‘’Routing Ways’’ Cables & Pipes connectors panel RICH: Utility lines and signal readout cabling Same cable routing and connectors panels as LTCC

PMTs Box Electronic Box: Thermal Power Dissipation S. Tomassini, D. Orecchini18 Air flux Air speed ADVANTAGES: - More flexibily – the PMT Box is outside the rich module. - More efficient heat dissipation. 20°C 30°C Power to dissipate = 400 W Two parallel ways are planned: Cooled water serpentine around the PMT box (80%) Room temperature air flux (20%) Water Cooling Coil Air Outlet nozzles Air Inlet nozzles Cooling water coil

Mirror Design S. Tomassini, D. Orecchini19

Mirror Geometry S. Tomassini, D. Orecchini20 Spherical MIRROR radius: 4000mm Height: 1480 B2: 2820 B1: 1666 FLAT PANEL SPHERICAL MIRROR The flat mirror has the same surface of the aerogel array The spherical mirror is split into six sub-mirrors

Flat Mirror & Aerogel Support S. Tomassini, D. Orecchini21 Substrate Weight = 17 kg Aerogel Weight  35 kg Total Weight = 58 kg Tiles are constrained by a mesh of stretched nylon wires Each Glass Mirror is glued on three independent jack and stiffened by a frame. The stiffening frame acts as housing of the aerogel tiles Six independent glass mirrors. Glass Thickness 0.8 mm Glass Mirror  6 kg

Exploded View S. Tomassini, D. Orecchini22 = + + CFRP Panel GLASS Mirror & Mount frame Aerogel Bricks Assembly

S. Tomassini, D. Orecchini23 Glass Mirror and Aerogel tile Support Glass thickness = 0.8 mm

S. Tomassini, D. Orecchini24 FEM analysis of the CFRP flat panel Installation Operation g g Total Thickness= 9.6 mm CFRP stacking sequence

S. Tomassini, D. Orecchini25 Spherical Mirror and Mount Frame Geometry Front View Back View Frame Detail Split into Six sub-mirrors because of coating reasons. Max coating surface about 1 m^2 Substrate Weight = 10 kg CFRP frame Weight = 7 kg

FEM analysis of the SYM mount frame S. Tomassini, D. Orecchini26 g g Simply supported here MirrorMirror M i r ro r Installation Operation

Mirror Substrate: Industrial feasibility S. Tomassini, D. Orecchini27 CFRP mirrors Riba Composites (Italy) Thales-Alenia-Space (Italy-France) CMA (Usa –Tucson) We are in contact with many industries with proved expertise to manufacture substrate for spherical and planar mirrors. Glass mirrors Media-Lario (Italy) - Produced glass mirrors for MAGIC II and is working for the CTA telescope

CONCLUSIONS S. Tomassini, D. Orecchini28 RICH mechanic is fully compatible with the LTCC and CLAS12 forward carriage frame Installation tools and procedures for the LTCC can be reused for the RICH because of geometry and mass compatibility. New installation brackets are planned to align the installation tooling wrt gravity center. Tubes and electronic cards are housed in a single box that can be dismounted, maintained and assembled outside. Thermal power of about 400 W will be extracted by means of air flux and an auxiliary water cooling coil system. CFRP material substrate are necessary in order to fulfill the goal of light weight, high stiffness and accurate mirror geometry. Mechanical deformations in the operating position are very small for both spherical and flat mirrors The flat panel and spherical mount frame can be manufactured as single part. Reflective film coating of large curved surface is possible up to 1 m^2. Glass mirror technology derives from terrestrial telescope field and is commercially available.