1 1 Reasonably Foreseeable Compliance Measures Sandi Potter Engineering Geologist.

Slides:



Advertisements
Similar presentations
The Committee and Research – Where are we and where might we be going?
Advertisements

Stormwater Management Program Training Presented By FAU Environmental Health & Safety Phone: Fax: Web:
TM/WSP 5-9 Nov Group D1- Nuclear fuel cycle, nuclear waste QUESTIONS / DIFFICULTIES  Why is the NPP decommissioning required / necessarily?  How.
Identify source area and COCs Determine nature and extent of discharge Evaluate potential risks to public health and the environment Develop Investigation.
Alternatives Categorical Exclusion Training Class.
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
June 19, 2014 CONTROL OF TRASH ENTERING WATERWAYS IN CALIFORNIA DRAFT WATER RESOURCES CONTROL BOARD POLICY.
California’s New Onsite Wastewater Treatment System Policy Richard Sanchez, REHS, MPH President California Conference of Directors of Environmental Health.
An Overview of Recent Changes To the EEP Restoration Plan and Mitigation Plan Templates Steven D. Roberts Vegetation Senior Specialist
Connecticut Department of Energy and Environmental Protection.
© 2004 West Legal Studies in Business A Division of Thomson Learning 1 Chapter 45 Environmental Law Chapter 45 Environmental Law.
1 Risk Assessment Develop Objectives And Goals Develop and Screen Cleanup Alternatives Select Final Cleanup Alternative Communicate Decisions to the Public.
TIA Solid Waste Consultants, Inc.1 Presented by Miriam Zimms, Senior Consultant TIA Solid Waste Consultants, Inc. Tampa, Florida Pollution Prevention Conference.
TRP Chapter Chapter 4.2 Waste minimisation.
Investing in the logistics necessary for Africa's Oil and Gas Industry.
BAT as a main tool for minimisation of the negative impact of industrial activities Aivi Sissa Tallinn – Estonia 27 – 28 March 2008.
Hubbard Construction Company d/b/a Mid Florida Materials Request for Special Exception Request for Solid Waste Facilities Permit to operate a Class III.
New Ag Waiver for the San Diego Region (including Temecula Valley) Water Quality Workshop Rancho California Water District November 6, 2008 Presented by.
Storm Water Pollution Prevention Training
ERT 417 WASTE TREATMENT IN BIOPROCESS INDUSTRY W ASTE M INIMIZATION & M ANAGEMENT.
The Targeting Outcomes of Programs (TOP) framework.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
Synopsis EIA Purpose of EIA Origin Key Elements NGO Participation Content Analysis 1.
Section 3: Mining Regulations and Mine Reclamation
1 Resuming Operations at WIPP Frank Marcinowski Acting Associate Principal Deputy Assistant Secretary for The Office of Environmental.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
Module 6: Alternatives. 2  Module 6 contains three sections: – 6.1 Development and Screening of Alternatives – 6.2 Detailed Analysis of Alternatives.
Greenhouse Gas CEQA Significance Threshold Stakeholder Working Group April 30, 2008 SCAQMD Diamond Bar, California.
Reclaimed Wastewater Quality Criteria, Standards, and Guidelines
© 2004 West Legal Studies in Business A Division of Thomson Learning 1 Chapter 24 Environmental Law.
Clark County’s Municipal Stormwater Permit Stormwater Manual and Code Update National Pollutant Discharge Elimination System & State Waste Discharge General.
Chapter 39 Environmental Law. 2  Under what common law theories may polluters be held liable?  What is an environmental impact statement? What is the.
Notebook Ref Summary of the Issue Part of a Tier II antidegradation review should incorporate the consideration of feasible alternatives, some of.
1 Completing the CEQA Checklist Terry Rivasplata.
City of Tallahassee Wastewater Treatment System Hydrogeology Workshop – 2005 May 12 – 13, 2005.
1 Findings and Board Resolution Steven Blum. 2 CEQA Findings in the Board Resolution  Resolution or separate appended document contains findings critical.
1 Responding to Comments Janet Cox TMDL/Planning Communications Region 2.
©2001 West Legal Studies in Business. All Rights Reserved. 1 Chapter 25: Environmental Law.
1 Economic Analysis Steven Blum Alan T. Monji Environmental Scientist Region 9.
1 1 CEQA Scoping Naomi Feger Planning TMDL Section Leader Region 2.
TMDL for Diazinon in Chollas Creek Watershed TMDL for Diazinon in Chollas Creek Watershed Linda Pardy (858) Jimmy.
16.3. Bellringer The Environmental Impacts of Mining Because of the potential environmental impact of mining on a large scale, mining is one of the most.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
Evaluating New York GreenLITES for CDOT Projects Carrie Wallis-ATKINS Art Hirsch-TerraLogic July 12, 2011 Presentation to Colorado Department of Transportation.
1 1 The Project Description: Framing the CEQA Analysis Terry Rivasplata.
ISO Session 3 Environmental Management and Ethics in Management.
1 “Fair Argument” Test Triggering EIR: Friends of “B” Street v City of Hayward Facts & Issue Trial court: city abused discretion in adopting negative declaration.
1 Roles of the State and Regional Boards in the basin Plan Amendment Process.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
Infection Control Risk Assessment
Introduction to the California Environmental Quality Act (CEQA)
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Section 3: Mining Regulations and Mine Reclamation
Lecture 15 Environmental auditing
NORTH TRUNK SEWER REPLACEMENT PROJECT
Overview What is the CEQA environmental review process?
Section 3: Mining Regulations and Mine Reclamation
Sacramento County Stormwater Quality Program
Section 3: Mining Regulations and Mine Reclamation
Section 3: Mining Regulations and Mine Reclamation
Model Water Efficient Landscape Ordinance
CITY OF MARSHALL CHLORIDE ISSUES NOVEMBER 22, 2016
5. IMPACT ASSESSMENT WORLD CAFÉ: ALTERNATIVES ANALYSIS
Section 3: Mining Regulations and Mine Reclamation
Purpose & Need Categorical Exclusion Training Class – Presented by the Office of Environmental Services.
INDOT Storm Water Management
Effective Off-Site Air Quality Mitigation
Sacramento County Stormwater Quality Program
Presentation transcript:

1 1 Reasonably Foreseeable Compliance Measures Sandi Potter Engineering Geologist

22 Why do we consider options for compliance? “An agency…shall perform, at the time of the adoption of a rule or regulation requiring the installation of pollution control equipment, or a performance standard or treatment requirement, an environmental analysis of the reasonably foreseeable methods of compliance” CEQA §21159(a)

33 Required Analysis  The environmental analysis shall, at minimum, include all of the following for each alternative compliance measure:  An analysis of reasonably foreseeable alternative means of compliance with the rule or regulation  An analysis of the reasonably foreseeable environmental impacts of the methods of compliance  An analysis of reasonably foreseeable feasible mitigation measures CEQA §21159(a)

44 The Environmental Analysis Must Consider…  A reasonable range of:  Environmental factors  Economic factors  Technical factors  Population and geographic areas  Specific sites “Nothing in this section shall require the agency to conduct a project level analysis” CEQA §21159(c) and (d)

55 Level of analysis… “In the preparation of this analysis, the agency may utilize numerical ranges or averages where specific data is not available; however, the agency shall not be required to engage in speculation or conjecture.” CEQA §21159(a)

66 What is a Compliance Measure?  An on-the-ground action to implement the TMDL  An action by which a discharger might comply with a regulation, performance standard, or treatment requirement  Examples  Installation of trash interceptor  Repair of eroding roads  Isolation or removal of mine waste CEQA §21159(a)

77 Present a Range of Compliance Measures  You need only include a reasonable range, not every conceivable compliance option  No need to consider every subtle variation on a given compliance measure

88 What is Reasonable?  Standard BMPs in common use  Proven technology  Documented and readily available innovative techniques

99 What May Not be Reasonable?  Untested technology or technology in very early stages of development  A very costly compliance option when there are many more economical options available  Explain in the SED why suggested compliance measures were not considered

1010 What is Feasible? “’Feasible’ means capable of being accomplished in a successful manner within a reasonable period of time, taking into account economic, environmental, legal, social, and technological factors.” Guidelines §15364

1111 Economic Considerations  For other types of “projects” CEQA focuses only on environmental impacts or social and economic impacts only to the extent that they result in secondary, indirect environmental impacts  When we require a “performance standard” we need to consider economic factors (CEQA §21159(c))

1212 Economic Analysis  Remember…  Your cost estimate will be based on your list of reasonably foreseeable compliance measures  If you develop your list in the impacts section you will have consistency throughout your analysis  We have a session dedicated to Economics later today

1313 Determining Potential Impacts of Compliance Measures  Develop a list of compliance measures from implementation plan  Determine environmental impacts for each compliance measure  Recommend mitigation measures to reduce impacts

1414 Examples of Implementation Requirements from TMDL Implementation Plans (1) Reduce erosion from roads by 50% (2) Prohibit discharges of human waste from all vessels (3) Reduce erosion from mine waste

1515 Impacts & Mitigation Measures Abandoned mine site, Marin County

1616 Examples: Reasonably Foreseeable Compliance Measures Implementation Action Compliance Measure Reduce Erosion from Mine Waste  Re-grade and plant  Remove, bury and cap on site  Remove and dispose off site

1717 Examples: Environmental Impacts Implementation Action Compliance Measure Environmental impacts Reduce Erosion from Mine Waste Remove and dispose of off-site Earthmoving could cause dust Haul trucks could increase traffic and noise

1818 Impacts and Mitigation Measures Major redevelopment project, Monterey County

1919 Possible Mitigation Measures Action Compliance Measure Impacts Mitigation Measures Reduce Erosion from Mine Waste Remove and dispose offsite Earthmoving could cause dust Haul trucks could increase traffic and noise Daily watering of bare soil Implement traffic control measures Implement noise reduction measures

2020 Mitigation Measures Watering and dust control during grading

2121 Summary  Translate your TMDL implementation plan actions into likely on-the-ground compliance measures  Document your rationale for determining that compliance measures being evaluated are “reasonably foreseeable”  Identify impacts associated with compliance measures  List possible mitigation measures to reduce or eliminate impacts

2222 What’s Next?  Training exercises to practice identifying reasonable foreseeable compliance measures and environmental impacts & mitigation measures  Breakout sessions after lunch today (compliance measures) and tomorrow morning (impacts and mitigations)  Bioaccumulatives  Nutrient/Pathogens  Sediment/Temperature  Trash

2323 Questions?