AESO Update to PCC March, 2014. 2 AESO March 2014 Update The AESO published its updated long-term plan on Jan 31 st, 2014 –Forecasting 2.4% overall load.

Slides:



Advertisements
Similar presentations
Reliability in British Columbia
Advertisements

Reliability in the International Arena Alberta Perspective
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Reliable Power Reliable Markets Reliable People Challenges and Opportunities in the Power Industry in Alberta CERI Conference October 22 & 23, 2007 Warren.
Electricity planning and approval in Alberta Laura Bowman staff lawyer Environmental Law Centre January 7, 2010 Bill 50.
Alberta’s Future Electricity Needs: What’s the Real Story? Economic Developers of Alberta Annual Professional Conference April 10, 2014 John Esaiw, Director.
Canada’s Nuclear Future So What’s Going On Up there Anyway eh?? WNFC 2008 Miami Milton Caplan President, MZConsulting Inc.
Public Service Company of New Mexico
AGM Finance Update Derrick Sturge, Vice-President, Finance & CFO June 4, 2014.
NTTG Economic Study and Biennial Study Update NTTG Economic Study and Biennial Study Update NTTG Study Cycle.
 2005 Pinnacle West Capital Corporation Palo Verde Hub Participant Meeting May 27, 2005 Arizona Public Service Company Tom Glock – Manager Power Operations.
Reliable Power Reliable Markets Reliable People Future Demand and Energy Outlook (2008 – 2028) Assumptions, Methodology and Processes April 2, am.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
KERN RIVER GAS TRANSMISSION COMPANY Wyoming Pipeline Authority Casper, Wyoming August 21, 2007 John Dushinske Vice President of Marketing & Regulatory.
Reliable Power Reliable Markets Reliable People 24 Month Reliability Outlook Stakeholder Information Session Tuesday, January 19, 2010 Jerry Mossing and.
Stakeholder Information Update Edmonton-Calgary 500 kV Transmission Development December 14, 2005 Introduction Neil Millar, vice-president, Transmission.
NWPP MC Initiative WECC Update March 25th, 2015 Kathy Anderson
Jeffery J. Gust IOWA INDUSTRIAL ENERGY GROUP FALL CONFERENCE Tuesday, October 14, 2014 MidAmerican Energy Company.
AESO Update to PCC July 16, AESO July 2014 Update The AESO published its updated long-term plan on Jan 31 st, 2014 –Forecasting 2.4% overall load.
AESO Update to PCC October 7, AESO October 2014 Update The AESO has published 20 year regional plans on its website –Forecasting 2.4% overall.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
Stakeholder Information Update Edmonton-Calgary 500 kV Transmission Development September 29, 2005 Introduction Neil Millar, vice-president, Transmission.
1 American Electric Power Company Transmission Formula Rate AEP Appalachian Transmission Co., Inc. AEP Indiana Michigan Transmission Co., Inc. AEP Kentucky.
Montana Ambassadors Helena, Montana February 25, 2011.
Increasing Access to the Grid NIPPC September 8, 2005 Brian Silverstein VP, Operations and Planning Bonneville Power Administration.
Wyoming Infrastructure Authority Developing Electric Infrastructure for the Future of the West Energy Gateway Update Presented by Darrell T. Gerrard Vice.
The Need for Electric Transmission Improvements in Dane County.
Texas Nodal Transition ACCOUNTABLE EXECUTIVE DESIGNATION Electric Reliability Council of Texas March 30, 2007.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Arizona ACC Biennial Transmission Assessment Navajo Transmission Project Update May 22, 2008 Presentation by Ben Hoisington Project Administrator, DPA.
Energy Gateway Update for Wyoming Infrastructure Authority January 27, 2009 Darrell Gerrard Vice President Transmission System Planning.
Powering Alberta AESO Annual General Meeting May 14, 2009 Reliable Power Reliable Markets Reliable People.
1 Spare Transformer Equipment Program (STEP). 2 STEP Objectives Industry initiative to increase the number of available spare transformers for use following.
Cigre B5 – 06 Working Group Presentation Protection and Control Asset Program Management John Robertson March 25, 2008.
Energy Beyond Hydropower Atlas Chapter 13 Figure 13.1 – Energy Consumption No PNW sources of natural gas or crude oil Refining crude oil – 4 north Puget.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
PJM©2010 PJM Regional Transmission Planning Experience Andrew Ott Senior Vice President, Markets 2010 NASUCA Mid-Year Meeting June 15, 2010.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
ATC Planning Zone Meeting Teresa Mogensen Director, Transmission Planning & Service Scott Barnhart Manager, Transmission Planning.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Relationship of Regional Resource Adequacy Standards to Utility Planning PNW Resource Adequacy Steering Committee Meeting June 27, 2007.
G&T Update – Western Farmers Electric Cooperative OAEC MR/PR Fall Meeting (2015)
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
Reliable Power Reliable Markets Reliable People Hanna Region Transmission Development Ramaiah Divi, P.Eng Manager, Central System Planning.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
Yellowhead Area Transmission System Development
RiversidePublicUtilities.com Arts & Innovation RiversidePublicUtilities.com MOD GENERATOR TESTING REQUIREMENTS RESOURCE PLANNERS LeeAnne Uhler, Regulatory.
© 2000 PACIFICORP | PAGE 1 SOUTHWEST UTAH AREA STUDY SEPTEMBER 2014 Nathan Wilson/Talmage Daley Need to review the LOADS before Friday.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
THE POWER OF POSSIBILITY AESO current limits for Alberta-BC transfers Jeff Palermo – KEMA/AESO.
AESO Update to PCC October 15, AESO October 2015 Update AESO currently developing 2015 Long-term Plan –Exploring low growth scenario corresponding.
Transition Plan Network Operations Model Change Requests 5/26/2010.
LINE 69H REBUILD AND CONVERSION PROJECT ERCOT Regional Planning Group April 21,2016.
PJM© Market Efficiency RTEP Proposal Window PJM TEAC 1/9/2014 – Market Efficiency Presentation.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 5/09/2011 West of Cascades – North (WOCN) Path BPA Studies Path Definition (for studies) 
Alaska Legislature Senate/House Resources & Energy Committees February 2010.
TransmissionHub Quarterly Market Update June 8, 2015 Kent Knutson, Director Hub Services, PennWell Corporation Sponsored by.
NMT – Network Operations Modeling & Telemetry - Project
Visibility Ramu Ramanathan 10/1/2007.
NETCO CANADA BUSINESS PLAN January 9, 2002 CONFIDENTIAL
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
SunZia Project Description
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
Alternative ICAP Proposal
Bringing Power from the North
AESO Update to PCC October 7, 2014.
AESO Update to PCC July 16, 2015.
Presentation transcript:

AESO Update to PCC March, 2014

2 AESO March 2014 Update The AESO published its updated long-term plan on Jan 31 st, 2014 –Forecasting 2.4% overall load growth over the planning horizon, 3.5% in the oil sands region – termTransmissionPlan_Web.pdfhttp:// termTransmissionPlan_Web.pdf The AESO has selected 5 entities to enter the RFP stage for the 500 kV Fort McMurray West project –Alberta PowerLine – owned by Canadian Utilities Limited and Quanta Capital Solutions Inc. –Athabasca Transmission – owned by AltaLink LP and AEP Transmission Holding Company LLC. –NorSpan Partners LP – owned by EPCOR Utilities Inc. and LS Power Associates LP. –TAMA Transmission LP – owned by MidAmerican Energy Holdings Company and TransAlta. –TransCanada/Elecnor – owned by TransCanada PipeLines Limited and Elecnor S.A. The successful entity will be selected in Dec 2014 with a target in-service date of 2019 for the 500 kV line

AESO march 2014 Update Path 1 operational limits increased in January 2014 –Winter import limit increased to 830 MW from 780 MW –Summer limit to be updated during Q AESO has received regulatory approval to proceed with a 240 kV double circuit line that will connect to Path 1 via a 500/240 kV substation –Projected in-service date is 2017 –WECC Path Rating process for Path 1will be initiated soon AESO continues to work with BC Hydro on joint studies to identify infrastructure and/or market products required to restore Path 1 to its current WECC Catalog path rating (1200 MW import, 1000 MW export) 3

Thank you