The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

Sc Magnet test facility Consolidation Project presentation M. Bajko for the TEMB on behalf of the MSC TF section team 31. Aug
Booster Main Bending Magnet Test in SM18. Why The energy upgrade of the PS Booster main bending magnet requires endurance tests at high current (≈12 kA)
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
HQ TEST CERN by Marta Bajko CERN TE-MSC TF For Hi Lumi and LARP the 16 th of November 2011 CERN.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Superconducting IR Magnets CHEN, Fusan May 11, 2007.
CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 1 Incident September 19 th Architecture of powering and protection systems for high field.
LAUC Proposal: Feedboxes and System Engineering bnl - fnal - lbnl - slac US LHC Accelerator Research Program Michael Lamm LARP+LAUC DOE Review June 21,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
HC review, A. Perin, 12-MAY DFB Project LHC hardware commissioning review May 2005 Hardware commissioning of the DFBs and DSLs and connection.
Readiness of test stations for design validation Marta Bajko on behalf of the TE-MSC TF team CERN, 11 th December 2014 QXF design review, CERN.
5 th Joint Hi-Lumi LHC-LARP Annual Meeting 2015 SC Link Protection A.Ballarino 28/10/2015.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
A. BallarinoLASA, Milano,18/09/2012 High-Tc Superconducting Link Status of Task 7.5 FP7 Meeting at LASA-Milano A.Ballarino, CERN for the Task 7.5 Collaboration.
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
XVII SuperB Workshop and Kick Off Meeting - La Biodola (Isola d'Elba) Italy May 28 th June 2 nd 2011 P.Fabbricatore Sezione di Genova Reuse of Babar sc.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Teleconf ACS – FREIA 28th March 2017
Cryogenics storage and distribution
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
HL-LHC IT STRING and Series test of SC link
Testing of SC Magnets Status - November 2010
Test CERN Marta Bajko CERN
The HL-LHC Circuits: Global View and Open Questions
HFM Test Station Main Cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Feasibility and implication of installation of the string test in SM18 with a slope M. Bajko WP16.
SPS cryogenic proximity equipment and SM18 validation
The LHC - Status Is COLD Is almost fully commissioned
Powering the LHC Magnets
Hollow e- lens, Cryogenic aspects
ACCESS to magnet testing facilities
HO Corrector Magnets: decapole test and future plans
International Review of the Conceptual Design of the Cold Powering system for the HL-LHC Superconducting Magnets J.Ph. Tock
Update on circuit protection simulations of the HL-LHC Inner Triplet circuit Matthias Mentink, Circuit specifics + STEAM simulations: Samer Yammine, LEDET.
ESS RF Development at Uppsala University
EN-ICE Technical Committee SM18 activities & projects
TEST PLANS for HL LHC IT STRING
WP3 Meeting – December the 10th 2015 H. Prin
ILC Experimental Hall Cryogenics An Overview
HL-LHC Long term behaviour of magnets Test facility limitations
Review Bloc 4 and SM18 facilities and upgrade
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement TEST PLANS and HL LHC IT STRING M Bajko for the TC of HL LHC the 4th of June 2015

2 SUMMARY HL LHC Magnets TEST PLAN TIMELINE PERFORMANCE TEST PLAN. Distribution over the next years IT STRING for HL LHC SCOPE MANDATE Short term actions CONCLUSIONS

3 TIMELINE for the different test for HL LHC magnets From these it was defined the test stand readiness requirements ( see the presentation of Volker)

4 How this TIMELINE is made? Every single magnet test is part of the GLOBAL HL LHC planning set up for the C&S Review and most of the cases is linked to the fabrication of the magnets. It is designated to a test bench and we take as resources: 1.Cryogenic cooling 2.Electrical powering Those are services which are shared between benches and users Typical test is over 7 weeks and systematically includes a thermal cycle (TC) unless is produced in the USA and tested before sent to CERN. In that case no TC is considered so a total of 5 weeks for series and 6weeks for prototypes. PERFORMANCE TEST CAPACITY estimated to : 20 quench /magnet + Corrector test, Splice resistance, Magnetic measurement, High Voltage test From these It was defined the nr of test stands and integrated service ( demineralised water, cryogenic, electricity ect) capacity and availability for a given period. See presentation of Volker

PERFORMANCE test I SS = 22 kA ( we wish this for the model) I accept series = 108% I nominal = 18 kA First cool down to 1.9K Second cool down to 1.9K I nominal = 75% I SS = 16.5 kA No CRITERIA is defined for the : a.level of the FIRST QUENCH b.NUMBER of QUENCHES to I accept It is too EARLY for this… but we will be able to do 20 quenches/test During the TRAINING I accept SHOULD be attained and kept for 3h CONTINOUSE powering without quench After Thermal Cycle to RT MEMORY should be proven by 2 nd quench > I nominal I accept proto = 90% I SS = 20 kA This is the Cluster D vertical test stand for model magnet test + magnet dimension These are the horizontal benches: A, and B or C ELECTRICAL INTEGRITY U acceptance = 2 x U max and this is in aprox. 3 kV in He From these it was defined the test stand specification. See the presentation of Volker. PROTECTION is with EE, time reaction in the 2-3 ms range, with dump resistor of mOHM Courtesy of G. J. Coelingh Courtesy of P. Perret Courtesy of P. Fessia

6 TEST distribution over the years. Alternative solutions. 15 % of re-test has been included into the cost and schedule This peak is due to the high number of orbit correctors Ex. Alternative option under study for test CERN and 50% in Uppsala We build a test station for all type of magnets, but some of them will be tested elsewhere…. Courtesy of R.Ruben

7 IT STRING SCOPE Cluster E Cluster D Cluster A Cluster B Cluster C Cluster F DFH + CL IR PC IR STRING DSH

8 THE ZONES in the Building 2173 CLUSTERS F E D CLUSTERS C B A HORIZONTAL TEST BENCHES VERTICAL TEST CRYOSTATS SC LINK TEST STATION LN 2 TEST ZONE CRYOGENIC ZONE SUPERCONDUCTING RF CAVITY TEST ZONE

9 IT STRING short term ACTIVITIES Based on scope, the preliminary studies and cost estimates 1.Set up a TEAM and the modus operandi with GL and WPLs 2.ESTABLISH a COMPLET list of INGREDIENTS 3.Set up a possible TIMELINE and agree on that 4.WORK out a TEST plan 5.Work out a BUDGET and RESOURCES Check specifically those equipment which are only be used in Sm18 Extract from the Mandate ….

10 1. SET UP A TEAM AND A MODUS OPERANDI

HL LHC STRING Ingredients… mainly from the WPs and possibly series equipment Magnets: Q1, Q2a, Q2b, Q3,CP, D1 Power converters: 3 x 20 kA, 6 x 3 kA, 9 x 120 A Power distribution: DFH and Current leads + SC link ( DSH) Protection and EE system: 3 x switches x 20 kA, 3 x Dump Cryogenic equipment ( cooling and cryo distribution) Vacuum equippment 11 Cryogenic feed box 80 m Shuffling Module DFH 20 kA12kA 20 kA 6 x3 kA 9 x 0.12 kA Switch & Dump SC Link (DSH)Connection Module LHe 4.2 K He gas recovery Bus Bars Connection Module Converters D1 CP Q3 Q2bQ2a Q1 Test the COLLECTIVE BEHAVIOUR of ingredients tested individually SERVICE UPGRADE needed for : Cryogenic cooling: additional 6 kW power plant Demineralised water cooling: additional 55 m 3 /h ( aprox.0.5 MW) Primary water cooling: additional 2.5 MW for cryogenics Electricity : tbc 2. IT STRING INGREDIENTS These was defined and is part of the SM18 Test Facility UPG Project. See the presentation of Volker. DAQ, Interlock, Software for Analysis ect is to be test in the STRING

12 3. HL LHC STRING TIMELINE STRING Phase2 can not start before mid 2021 due to late arrival of the 1 st series of D1 STRING Phase1 can start in 2019 end with prototypes but Q3 will missing

Quench: provoked, natural, holding current, propagation, detection, protection, clic, dump, switch Cryogenics: cooling- warming speed ( Nb 3 Sn), heat load, recovery after quench, pressure, temperature, shielding Integration: layout, interconnections, systems around ( racks, cables trays, control cables et), total weight Powering: bus bar, connections, current leads, power distribution at warm and at cold, converters, water cooled cables Electrical integrity: splice resistance, electrical insulation Interlock Vacuum: leak detection, beam screen Instrumentation, DAQ systems, DB, QA, QC: specific or not to string Alignment Validation of a layout- integration Validation of installation sequence and procedures Validation of a system (of components) Validation of their collective behaviour Develop methods, techniques Develop tooling Develop procedures X definition of Installations Test Operation 2 support HWC OP GOALS in parallel: 4. HL LHC STRING preliminary TEST PLAN

14 5. SET UP THE IT STRING BUDGET This is a very preliminary budget probably a lot under estimated but gives an idea what can be….but it contains only non HL LHC items. The main ingredients will be paid and produced within the WPs and used for the time of the STRING before transforming them to spares.

CONCLUSIONS For all type of The HL LHC magnets we plan to have a test CERN although some of the will be tested elsewhere. The test plan is done including all magnets but the high order correctors The test plan is part of the general HL LHC planning and the corresponding test stand is identified for each of them ( vertical or horizontal A,B,C cluster ect, ) The definition of the performance test is well advanced These work led to a specification of the test stands, the ancillary ( ex. water cooling) or main ( cryogenic) services and a requirements for their readiness. It is giving also the indication of what and when should be done in simultaneous way ( STRING, SC link and magnet test) IT STRING activity has been started but is all preliminary. Actions are listed for the next coming mounts. Proposed timeline is given for 2 years of operation and in two phases starting at 2019 and in All services but electrical powering has been defined.