MICE VC 10-Oct-2013 Alain Blondel 1 MICE NEWS VC 162 LOTS OF THINGS HAPPENED! have arrived at RAL: -- EMR (see report today) -- AFC2 see pictures -- SS2.

Slides:



Advertisements
Similar presentations
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Advertisements

Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014.
1 MICE CM31 Key schedule drivers for Step IV Schedule table Milestone summary Comment on Step V Step VI Andy Nichols, STFC, 3/11/11.
June 26, 2009TLH, NFMCC Friday Meeting1 MICE Updates MICE News Overview ISIS and MICE Schedules DAQ Review Spectrometer Update Aspirational Schedule Terry.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Alain Blondel MICE VC 9 september 2010 Spokesmouse report o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May.
1 RF Power infrastructure Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
Project Managers Report Video Conference 172 Roy Preece 11 th December 2014.
MICE Video meeting Alain Blondel 7 December MICE -- what running strategy? reflections on steps I and II.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
MICE - UK Project Progress Roy Preece 30 th April 2013.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for EPAC (Vittorio Palladino) o VC 20th May o VC 17th June o CM27 (RAL) 7th-10th July,
MICE: overview K. Long, 18 March, Contents ► Introduction ► Beam line ► Infrastructure ► MICE steps ► Phase II (comment) ► Conclusions.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM28.
CM37 Alain Blondel step IV physics success 1 « STEP IV operations : Physics »
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
1 MICE CM28 PM Report Progress since CM27 Schedule, dates, milestones Electrical substation Visiting RAL Andy Nichols, STFC 4 th October 2010.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Goals & Status MICE CM 33 Thanks go out to the organizers: Paul Soler, Ryan Bayes and Valerie Flood.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be Jun at IIT and the 19th at Fermilab right before the.
MICE magnetic measurements: AFC considerations Alain Blondel see a previous discussion for reference in CM35 (Feb 2013 slides by V. Blackmore, A. Blondel.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Spectrometer solenoid 2. Magnetic shielding 3. Next Collaboration meeting.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
MICE VC Alain Blondel 30 August MICE VC 103 MICE news -- see Malcolm's news for an inventory. -- great funding news all summer from USA! (phase.
Spokesmouse’s News Agenda: o VC 22nd April o 12th-13th May posters for IPAC (Vittorio Palladino) o VC 20th May o IPAC May o VC 17th June o CM27 (RAL)
RLSR 16/4/2015 UK Financial Plan & Risks. Content Finances – Cost to Completion Risks – Top level to completion – R9 working space – Summary 2 RLSR 24/11/2014.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
2 Oct 2008PC We have only 1 hour today May need to be brief.
Alain Blondel MICE VC 12 March 2009 Brief MICE news 1. Decay solenoid: operations will restart in early July. Criteria for acceptance have been specified.
MICE VC Alain Blondel 1 MICE NEWS MICE VC 161 Agenda Overall schedule Magnetic field mitigation review Status of things.
MICE VC116 Alain Blondel 18 December MICE NEWS See more details in Macolm’s MICE news!
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting CM36 will be Jun at IIT and the 19th at Fermilab right before.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 MICE PM Report General Update –Phase I nearing completion –MICE Power –Actions for Decay solenoid & target –Follow-ups from last VC –Conclusions MICE.
Status of the MICE Construction Project Resource Loaded Schedule Review 29 th April 2014 Roy Preece.
MICE CM32 25 th February 2012 Magnet Group Report Vicky Bayliss Victoria Blackmore John Cobb Mike Courthold Roy Preece Mike Zisman 1.
MICE CM33 – system test? Alain Blondel 1 CM 33 wrap-up TOWARDS CM34.
1 How the Muon Ionization Cooling Experiment Found a Home MICE hall at RAL in Spring
MICE, Uni-Geneva and the transnational access to MICE (MICE-TNA)
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 5, 2016.
The MAP 3-Year Plan Mark Palmer Fermilab September 26, 2014.
Schedule to completion, Risk and Critical Interfaces Roy Preece STFC RAL RLSR 16 th April 2015.
Schedule and Milestones Roy Preece STFC RAL FAC 17 th April 2015.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
MICE RLSR – 13Nov2013 Alain Blondel 1 MICE Project Board 14 November 2013 Alain Blondel.
US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 16, 2015.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Muon Ionisation Cooling Experiment Overview
Resource Loaded Schedule and Budget Profile
MICE CM28 Engineering Session Summary (On behalf of Wing)
Status of the MICE Construction Project
UK Financial Plan & Risks
MICE NEWS MICE VC 155 Next Collaboration meeting will be
Presentation transcript:

MICE VC 10-Oct-2013 Alain Blondel 1 MICE NEWS VC 162 LOTS OF THINGS HAPPENED! have arrived at RAL: -- EMR (see report today) -- AFC2 see pictures -- SS2 see pictures -- RF amplifier from Daresbury (see pictures) has been published -- emittance measurement paper has been passed -- Magnetic field mitigation review (see also MICE note 419) Tom Taylor et al endorsed decision to go ahead with Partial Return Yoke warned of potential forces to magnets (report is posted on indico page under my name)  projects  MICE  field mitigation reviewhttp://indico.cern.ch have been burned -- HTS lead on SS1  magnet warm up, new leads in order (4 weeks) -- (not new) Decay solenoid had a burned cold lead: requires opening and surgery. to be repaired until February/April 2014

MICE VC 10-Oct-2013 Alain Blondel  Provisional MICE SCHEDULE update: June 2013 STEP I STEP IV (possibly w/o field: Q2 2014) Q to Q STEP VI Run date: EMR run Oct 2013 Under construction: Target date Q Step V run possible 2018 Slip since october 2012 = 2 months we are here!

MICE VC 10-Oct-2013 Alain Blondel 3

4 AFC2 at RAL John Cobb: “it looks just like #1” AFC1 did not pass the acceptance criteria and will be sent back to Tesla

MICE VC 10-Oct-2013 Alain Blondel 5 RF amplifier from Daresbury First amplifier installed last week Simplified TIARA configuration accepted by RF group - powering into one load reduces stress on deadline and uses fewer components and decouples from mods to mezzanine floor. Waveguides and dummy load components received from UMISS last week Prefabricated water panel arrives from DL end next week Air system components are all here, Installation can begin after EMR run #2 (i.e. next week)

MICE VC 10-Oct-2013 Alain Blondel 6 installation of first MICE RF amplifier behind the north wall (=right bank of the «muon river»)

MICE VC 10-Oct-2013 Alain Blondel 7 Dear MICE, I'm sure you'll all be very happy to hear that the emittance paper has now been published in EPJC, and is viewable at Many, many thanks to everyone who helped get it there! Best, Victoria

MICE VC 10-Oct-2013 Alain Blondel 8

9 Upcoming MICE VCs Thursday 24 October we will have a special MICE Video conference to present the main conclusions of the reports to MPB and RLSR Next collaboration meeting 6-8 November Organization: V. Blackmore, A-B. J. Cobb S oftware workshop 4-5 November. registration is open November RLSR November MPB November FAC Upcoming Agenda