Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Developments Transmission Workgroup 5 th April 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EU Implementation Programme Action TR1003: All to consider how to address EU developments going forward and send any identified issues to:
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
UNC Mod 485: CMP-LTUIOLI Progress Update 3 April 2014.
European Developments: Capacity Transmission Workgroup 6th October 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Project Nexus Workgroup Unique Sites 4 th November 2014.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EU Gas Balancing Code – Nomination Update [Revised to reflect action TX1002] Action TX1002: EU Balancing Code/Nominations: Provide an overview of what.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Assignment of NTS Entry Capacity Transmission Workstream 06 November 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
MIPI European Transparency Project (ETP) Transmission Workstream 7 th October 2010.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
MOD0164 Bi-Directional Connection Point Overrun Charge Calculation Stuart Waudby (Centrica Storage Ltd.)
European Developments Transmission Workgroup 1 st December 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Developments Transmission Workgroup 3 rd May 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
EU Phase 2 Delivery & UK Link Programme; Impacts on Gemini Process European Workgroup 1 st May 2014.
EU Phase 3 Customer communications
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
Workgroup meeting October 2014
Capacity Conversion – 616s
20th April 2016 Teleconference
EU Implementation Programme
18th July 2016 Teleconference
20th April 2016 Teleconference
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
20th April 2016 Teleconference
18th July 2016 Teleconference
Proposer: National Grid NTS Panel Date: 17th April 2014
Exit Overruns in the Enduring Regime - draft MOD principles
Workgroup meeting October 2014
Nominations 11 July 2014.
Presentation transcript:

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Workgroup 0493: EU Gas Balancing Code - Daily Nominations at Interconnection Points (IP) Phil Lucas 1 st May 2014

Background  EU Balancing Code implementation required by October 2015  Nominations process: timescales and rejections, etc.  NG are not currently exercising the option to approach our NRA for a 12 month extension  EU CAM Code implementation required by November 2015  ‘Single nomination’ process for bundled capacity  EU Interoperability Code in ‘comitology’ – it was expected that implementation would be required for October 2015  Nominations matching process  Data exchange 2

Framework for IP Nominations 3 EU Balancing Code EU Capacity Allocation Mechanism (CAM) EU Interoperability Code Code ENTSOG Business Requirements Specification (BRS) for Nominations EASEE-gas Message Implementation Guidelines (Nominations and Matching Process)

Solution 1.New terms 2.Application 3.Nominations and Renominations – General 4.Processing of Nominations 5.Processing of Re-nominations 6.Rejection and Revision of Nominations and Renominations 7.Physical or Locational Trades at IPs 4

1. New Terms; and 2. Application  Additional terms required in new Nomination process  Rules apply in respect of each System Entry Point and Connected System Exit Point at an Interconnection Point (as now)  Transitional requirements in September 2015  For gas days up to and including 30th September 2015 – existing process  For gas days 1st October 2015 onwards – new process 5

3. Nominations and Renominations General  ‘Single Sided’ and ‘Double Sided’ nominations  Communications (User to Transporter)  Acknowledgment  Quantity types – ‘Processed’ and ‘Confirmed’  Multiple nominations per User per Day  Initiating Transporter and Matching Transporter role  Matching rule publication 6

Nominations at IPs Examples 7

4. Processing of Nominations  Submission window: D-30 to D-1 (13:00)  Default Nomination Rule – Nominated Quantity deemed to be zero in absence of User Nomination  Mandatory information requirements  Determination of Processed Quantity by NG  Notification of Confirmed Quantity: by D-1 (15:00) 8

5. Processing of Renominations  Submission window: D-1 (15:00) to D (02:00)  Negative Implied Flow rate validation  Daily nomination must not exceed the volume deemed to have already flowed at effective time of flow rate change  Mandatory information requirements  Determination of Processed Quantity by NG  Notification of Confirmed Quantity – by Hour Bar minutes  Effective time of flow rate change – Hour Bar minutes 9

Single Side Nomination Processing 10

Double Sided Nomination Processing 11

6. (A) Rejection  National Grid NTS may reject Nominations or Renominations:  Absence of mandatory information  Not submitted by User or its User Agent  In a Transportation Constraint, nominations above capacity entitlement  Negative value or Negative Implied Flow rate  Absence of a Double Sided Nomination to match against  Absence of matching information from Adjacent Transporter  Timing and consequence –  User notified within 120 minutes of Hour Bar  Prevailing Confirmed Quantity applies 12

6. (B) Revision  National Grid NTS may revise Processed Quantity:  In a National Grid NTS Transportation Constraint / Emergency  To match capacity entitlement  To a value deemed appropriate (Emergency only)  In the case of multiple Confirmed Quantities, the revisions will pro-rated  National Grid NTS may revise Confirmed Quantity:  Where the Adjacent Transporter has revised its Processed Quantity 13

7. Physical or Locational Trades at IPs  Confirmation lead time – Hour Bar +120 minutes  Opportunity for User to provide Renomination/s up to next Hour Bar  In absence of such Renomination/s, National Grid NTS will revise the previously determined Processed Quantity  In the case of multiple Confirmed Quantities, the revisions will pro-rated  User may subsequently revise subject to availability of Renomination process 14

Regime Comparison 15 Current Arrangements at Interconnection Points Prospective Arrangements at Interconnection Points One type of Nomination / Renomination‘Single Sided’ and ‘Double Sided’ Nominations and Renominations No details of User’s counterparty at IP requiredDetails of User’s counterparty at IP required One Nomination per System Entry Point or Connected System Exit Point at the IP per User One or more Nominations per System Entry Point or Connected System Exit Point at the IP, depending on the types of nomination used and the number of counterparties per User No NG NTS interaction with Adjacent Transporters at IPsNG NTS interaction with adjacent TSOs at IPs to undertake Nomination ‘matching’ process. Specification of an Initiating and Matching Transporter role. Nomination submission period: D-30 to D-1 13:00 (DM Output) D-30 to D-1 14:30 (Input) Nomination submission period: D-30 to D-1 13:00. Note that the adjacent Transporters may not offer the same earliest submission time. Renomination submission period: 15:00 D-1 to 03:00 D Renomination submission period: 15:00 D-1 to three hours prior to the end of the Gas Day Typically 1 hour processing timeProcessing time up to 2 hours Communications as per UK Link Manual / GeminiCommunications as per file formats or equivalent data format developed by ENTSOG Limited ability to reject a nomination (e.g. validation failure). Application of Overrun Charges for nominations in excess of capacity entitlement. Additional reasons for Transporter to amend or reject a nomination. Application of Overrun Charges for nominations in excess of capacity entitlement

Working Towards 1 October 2015  NG discussions with adjacent TSOs to agree nominations framework principles and implementation date/s - Q onwards  The Nomination information required in the Interconnection Agreements (IA) will be included with the other EU code IA changes  NG discussions with adjacent TSOs may lead to variations to Mod

Next steps  What topics do stakeholders want NG to cover at the next Workgroup on the 22nd May? 17

Appendix Matching Examples 18

Example 1 – “Easy” match (Double Sided Nom)

Example 2 – “Easy” match (Single Sided Nom)

Example 3 – “Easy” match (Multiple Double Sided Nom)

Example 3 – Lesser Rule (Double Sided Nom)

Example 4 – Overrun (Double Sided Nom)