Summary of first round of testing of shim concept for modular coil assembly 8-28-06.

Slides:



Advertisements
Similar presentations
1 Making and staining a wet mount Refer to the Practical Manual Introduction Sections F.1 and F.2.
Advertisements

Testing Test Setup TapLok Insert Shear Key Copper Threads Friction Tests Collar Shear Tests NSTX TF FLAG JOINT REVIEW 8/7/03 Michael Kalish.
WING SUPPORT CONCEPTS FOR WINGS # 2,3,6,7 AND 9 GARY MCGINNIS 09/19/ – TAPPING HOLES FOR STUDS 2 – STUD AND INSERT WELDING 3 – WELDING BRACKETS.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 8/7/03.
Summary of Twisted Racetrack / Clamp Analysis K. D. Freudenberg.
1 Bolts in Tension pt1 Andrei Lozzi. The flanges at the end of the two turbine shafts seen above, are bolted together to form a very rigid friction coupling.
Vacuum Vessel Production Readiness Review
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Home Work #3 Due Date: 11 Mar, 2010 (Turn in your assignment at the mail box of S581 outside the ME general office) The solutions must be written on single-side.
FDR Station 3 lift fixture, laser screens and brackets T. Brown and L. Morris with analysis support from A. Brooks December 3, 2007.
Slide HALLD TAGGER MAGNET STRUCTURAL ANALYSIS Presented by William Crahen 6/10/09 Pole Plate analysis Vacuum chamber analysis Vacuum chamber tie rods and.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
Bridge Design Project Using SolidWorks and SolidWorks Simulation to design, test and build structures.
Chapter 27: Workholding Devices for Machine Tools
1 CM 197 Mechanics of Materials Chap 10: Strength of Materials Strains Professor Joe Greene CSU, CHICO Reference: Statics and Strength of Materials, 2.
Component Testing Test Setup TapLok Insert Shear Key Copper Threads Friction Tests Collar Shear Tests NSTX TF FLAG JOINT REVIEW 8/7/03 Michael Kalish.
ME104Q PAPER RIVER CHASM BRIDGE Team Boomerang Mechanical Engineering University of Rochester Executive Summary The premise of this experiment is built.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 4/10/03.
Fasteners / Joint Design Michael Kalish NSTX TF FLAG JOINT REVIEW 8/7/03.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
General idea of a couple of check rod system and adjustments
Component Testing Test Setup TapLok Insert Shear Key Copper Threads
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
DESIGN AND FABRICATION OF TURNING FIXTURE FOR ELBOW
ZDC/Dummy Absorber Exchange Crane Proposal Paul Debbins Ianos Schmidt Univ. of Iowa - Nov. 5, 2007.
VC Training Table Setup and Floating Agenda General –Air Supply Requirements Assembly –Assembling the System –Leveling the Table –Isolating.
Multiple Coil Lift Calculation. Purposes of the Study  To investigate the stress distribution in the MCWF and the lifting device.  To make sure mounting.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
George F. Limbrunner and Leonard Spiegel Applied Statics and Strength of Materials, 5e Copyright ©2009 by Pearson Higher Education, Inc. Upper Saddle River,
Weld Study Continued Filet weld on both sides Deflection (top flange removed) Stress Intensity (top flange removed)
Analyses of Bolted Joint for Shear Load with Stainless Steel Bushing and Frictionless Shim-Flange Interface Two cases of shim plates were investigated.
Poisson’s Ratio For a slender bar subjected to axial loading:
Stycast Insertion Part 3 and preliminary glue picture on samples
UPDATED Notes from the June 22 Conf. Call on Weld Details, Bushing Details, and C-C Bolts.
Modular Coil Assembly Bolted Joint PDR 2/22/07. Objectives The review objectives include... Define the location of additional inboard bolts Finalize the.
Poisson’s Ratio For a slender bar subjected to axial loading:
L0 and L1 Structure Deflections During Installation of Silicon Sensors C H Daly 8/24/2003.
Shear Problem Defined There are no bolts on the inboard side of the coil structure to account for shear forces. Bottom Line: friction alone will not prevent.
NCSX Modular Coil Joint Load/Stress Calculation By Leonard Myatt Myatt Consulting, Inc.
Focusing Coil Support Tube Stress Analysis under different static load Stephanie Yang, Oxford University MICE collaboration meeting at CERN March 29 –
1 Bolts in Tension pt1 Andrei Lozzi. The flanges at the end of the two turbine shafts seen above, are bolted together to form a very rigid friction coupling.
An Analysis of Shell Structure for Dead Load H.M. Fan PPPL September 16, 2005.
NCSX VACUUM VESSEL HEATING/COOLING PL Goranson Preliminary Results February 17, 2006 MDL Testing of Coolant Tracing NCSX.
Analyses of Bolted Joint for Bolt Preload and Shear Load
Mechanical Designs of The Central Detector Jinyu Fu
Hybrid Structure with Cooling John Cozzolino LARP Collaboration Meeting Port Jefferson, NY November 4-6, 2009.
Shear Test Assembly update
1 MC Assembly over the VV FPA Station 3 FDR Review July 13, 2007 T. Brown.
Twisted Racetrack Analysis Update
NSTX TF Flag Joint Design Review SUMMARY C Neumeyer 8/7/3.
Bushing Material The bushings are made of G11CR. However, it has been shown that deflections (and bolt stresses) due to shear loads not reacted by friction.
Proposed TF Joint Design Concept #1 C Neumeyer 3/23/9 Notes: 1)Several concepts included are based on ideas developed by R Woolley 2)No analysis has yet.
LARP Collaboration Meeting Racetrack Coil Fabrication
Nonlinear Analyses of Modular Coils and Shell structure for Coil Cool-down and EM Loads Part 1 – Results of Shell Structure and Modular Coils H.M. Fan.
Andrew Biehl.  The objective of this project is to develop a method for determining the nut factor of a bolted joint using the finite element method.
FEM Analysis of the Stage3 Support Frame H.M. Fan March 14, 2007.
Workshop 2 Steel Bracket Modified by (2008): Dr. Vijay K. Goyal Associate Professor, Department of Mechanical Engineering University of Puerto Rico at.
Building LEGO Robots For FIRST LEGO League By Dean Hystad
Twisted Racetrack Revisited Model Changes: Side A has 10 turns Clamps have been modified to as built geometry. Property Changes (linear results.
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
NCSX Modular Coil Joint Load/Stress Calculation By Leonard Myatt Myatt Consulting, Inc.
Gluing procedure for BGO, fast and slow scintillator Mózsi Bank Kiss & Tomi Ylinen Nov. 23, 2005.
Material Testing under Tension
Poisson’s Ratio For a slender bar subjected to axial loading:
Development of a low material endplate for LP1 and ILD
Step IV - Engineering Jason Tarrant – Integration Engineering
Step-by-step assembly instructions
Poisson’s Ratio For a slender bar subjected to axial loading:
Poisson’s Ratio For a slender bar subjected to axial loading:
Panel Riveting Dept. Adjustable Part Holding Fixture
Presentation transcript:

Summary of first round of testing of shim concept for modular coil assembly

Problem Shear loading in the inboard regions has no manner in which to be resolved

From Art and H.M. modeling Bottom Line: friction alone will not prevent sliding. (how much sliding that would ultimately result is unanswered)

Linear 20° H.M E = 8.5 Mpsi Freudenberg

Further Checking The stress plots between the two models agree well with each other. However, It appears that turning one coil non-linear at a time produces different compressive forces at coil joints (unbalanced) then cases where all coils exhibit like properties.

Concept to resolve shear forces Add shear pins to prevent this motion from occurring

Calculation for size and number based on largest shear force from shim abinb

What an individual shim would look like 53 pins on approx 2.5” centers 70 pins on approx 2” centers Design will be similar to the left figure (with 50 pins per section)

Pins and shims (up-close) Large clearance holes are needed to allow for alignment

SST Shims, G-10 Shims, bushings and pins

Test Fixture A prototype fixture containing 4 pins was designed and loaded

Stycast not shown Pins are 2” apart.625 Fixture

Welded stud bushing epoxy G-10 shim Steel shim Outer pull plate is invisible

Stud Welding The four half inch studs were welded on at the MDL laboratory onto the two pull plates. The pins had very little tilt to them and were fairly normal to the plates. The weld bead was then ground off and the studs were cut back to 3/8” long. This procedure can be performed at PPPL in the same manner as was done at MDL. All other parts of the fixture (excluding the studs), were machined at a local machine shop.

Sample Preparation (Awaiting Insertion of the Stycast) Imagine from cell phone (poor quality) 1/32” Groove for Stycast run off (two places)

Sample Preparation (Insertion of the Stycast) Mixed Stycast 2850 with catalyst 23LV Extracted using Walgreens syringe Stycast was inserted from the top filling all four holes in this orientation

Stycast Support Weight First two holes (with pins up) were filled with 3cc’s of Stycast to the top 3cc’s were then placed in the other two holes and the top plate was placed down.

More Preparation pictures pool Final Step (assembling top pull plate onto fixture) Another View of Stycast Pool

Shim Test Fixture loaded into pull fixture Independent measuring extensometer installed on outer lower block via magnetic mount Max Load tested so far = 15,000 lbs (3750 lbs/pin) Stroke and load are measured by the 5-0 kip load cell on top of the machine (just outside the picture)

The “one armed bandit” Hard to see, but the probe touches the bottom of the shim piece here. Close up of the bandit

Prototype testing Max loading of 15,000 lbs

First test

2 mil offset

Test Setup #2: left and right side measuring All tests showed approximately 6-7 mils of deflection at 15,000 lbs

Finite Element Analysis Experimental demonstrated in deflection for 15,000 lbs (3750 lbs/pin)

FEA Loading and setup 200 lb preload applied to bolts 15,000 lb tension load (top hole) Model is fixed at bottom hole Mesh Frictionless contact between g-10 shims and outer pulling plates Elastic Modulus SST = 28 Mpsi G-10 = 7 Mpsi Stycast 2850 = 1.05 Mpsi from Fermilab paper (TM-2339-E)

Deformation Deflection (x 1e-2 in ) Stycast has frictionless contact with bushing, thus only compressive loading is seen by the Stycast. Upward movement of 1.75 mils.

Stress Intensity on pins Very Localized peak stress near the root of the pin, σ nom approx 14 ksi

Post testing Observations The analysis underestimated the experimentally observed deflection by a factor of 3.5. Why did this happen?

Post test Pictures Top Pull Plate removed

Pictures of Stycast and bushings Top View: Bushing are not concentric No cracking is seen. ISO view: Large gaps 1/8” are seen in the level of the stycast compared to the sst shim,

Pictures of Stycast and bushings More gap pictures and a view of the relief groove milled into the shim.

Air Bubbles After removing bottom pull plate and breaking the stycast, Multiple air bubbles were observed throughout the material (largest bubble approx dia = 3/16”) Bubble Bubbles

Updated Analysis [Model changes to reflect post test observations] Gaps Introduced around pins on one side (see pictures above). Modulus reduced by 50% (estimate) to account for bubbles. Resulting Deflection is 7.35 mils gaps No gaps on reverse side

Solutions and Path Forward. Inject Stycast from the side of each hole (instead of top) using Zerc fittings and hypodermic needle. Two holes will be drilled to allow for insertion and vacuum pulling of stycast around each bushing. Deair stycast until bubbling has ceased using vacuum (Use prototype to test Stycast mixture for presence of bubbles) Limit stirring of Stycast Test Stycast samples in LN2 environment to test compressive strength.

Appendix: Bubble Solution To ensure a void-free embedment, vacuum deairing should be used to remove any entrapped air introduced during the mixing operation. Vacuum deair mixture at 1-5 mm mercury. The foam will rise several times the liquid height and then subside. Continue vacuum deairing until most of the bubbling has ceased. This usually requires 3-10 minutes. To facilitate deairing in difficult to deair materials, add 1-3 drops of an air release agent, such as ANTIFOAM 88, into 100 grams of mixture. Gentle warming will also help, but working life will be shortened.