10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT.

Slides:



Advertisements
Similar presentations
05-October-2007 Heppenheim,DLR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 05 October 2007.
Advertisements

09-Dec Toulouse,FR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, END of Sprint 2006 Meeting Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 20.
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
November SLS RFM and RNG REPORT 18 November 2004.
7-Apr-2014-cesg-1 Joint CMC-CESG Meeting NH Conference Centre, Nordwijkerhout, Netherlands Hosted by ESA/ESTEC 7 April 2014 CCSDS Engineering Steering.
30-March-2015-cesg-1 Martin Suess (AD) Rick Barton (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Security WG: Report of the Winter 2007 Meeting Colorado Springs, CO USA January 20, 2007 Howard Weiss NASA/JPL/SPARTA
Security WG: Report of the Spring 2015 Meeting Caltech, Pasadena CA USA 27 March 2015 Howard Weiss NASA/JPL/PARSONS
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
07-Apr-2014-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Cesg-1 June 2010 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
10-Dec-2012-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Cesg-1 CCSDS Engineering Steering Group: Report to the CCSDS Management Council (CMC) and Interagency Operations Advisory Group (IOAG): Fall 2010 BSI,
Security WG: Report of the Fall 2014 Meeting BSI, London UK 14 November 2014 Howard Weiss NASA/JPL/PARSONS
SIS_DTN 1 SIS-DTN Forward Planning October 2013 San Antonio Fall 2013.
SIS_DTN 1 SIS-DTN Status: LTP, BP, SSI Arch October 2013 San Antonio Fall 2013.
1 26 October 2005 Space Internetworking Services Report to the CCSDS Management Council 26 October 2005 R. Durst, D. Stanton.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
SIS-DTN Friday FRIDAY SCHEDULE SIS-DTN WORK ITEMS (FROM FRAMEWORK)
Security WG Status Review ESA European Space Operations Centre Darmstadt, Germany 16 April 2012 Howard Weiss NASA/JPL/SPARTA
Cesg-1 SLS REPORT 7 May 2010 Jean-Luc Gerner (AD) Gilles Moury (DAD) SPACE LINK SERVICES (SLS) AREA SLP and NGU sections Only.
PS 1 12 June 2006 SEA Opening Plenary Rome, Italy, 12 June 2006.
Information Architecture WG: Report of the Winter 2007 Meeting January 20, 2007 Dan Crichton, Chair NASA/JPL.
Security WG: Report of the Fall 2008 Meeting DIN, Berlin Germany October 17, 2008 Howard Weiss NASA/JPL/SPARTA
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/PARSONS November 2014 BSI, London.
Information Architecture WG: Report of the Fall 2010 Meeting October 29, 2010 Dan Crichton, Chair Steve Hughes (presenting) NASA/JPL.
November MOIMS AREA PLENARY NAVIGATION WG REPORT November 2004 CONSULTATIVE COMMITTEE FOR SPACE DATA SYSTEMS.
Wyn Cudlip BNSC/QinetiQ Presentation to WGISS25 China, February 2008 CCSDS Liaison Consultative Committee on Space Data Systems.
Security WG: Report of the Spring 2005 Meeting April 14, 2004 Howard Weiss.
Information Architecture WG: Report of the Spring 2004 Meeting May 13, 2004 Dan Crichton, NASA/JPL.
Cesg-1 22 October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
1 19 September 2005 Space Link Services Area report to CMC Reston, Virginia, USA, 26 September 2005.
Delta-DOR WG: Report of the Spring 2010 Meeting Portsmouth, VA, USA May 7 th, 2010 Roberto Maddè ESA/ESOC,
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
Information Architecture WG: Report of the Spring 2006 Meeting June 16, 2006 Dan Crichton, Chair NASA/JPL.
Apr12-cesg-1 Chris Taylor (AD) Stuart Fowell (DAD) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA.
1 24 January 2007 SIS Report to CESG/CMC 24 January 2007 R. Durst, D. Stanton.
Information Architecture WG: Report of the Fall 2005 Meeting September 16, 2005 Dan Crichton, Chair NASA/JPL.
Apr SLS-SLP WG Goal: Progress TM, AOS Space Data Link Protocol Pink Sheets to Blue (OID frame)* Hold due to FSH/Insert Zone/Security discussion.
Security WG: Report of the Spring 2010 Meeting Renaissance Hotel Portsmouth, VA May 7, 2010 Howard Weiss NASA/JPL/Cobham
Security WG: Report of the Spring 2012 Meeting European Space Operations Centre Darmstadt, Germany 19 April, 2012 Howard Weiss NASA/JPL/SPARTA
Cesg-1 28 April October 2008 Bob Durst (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA.
November SECURITY WORKING GROUP REPORT November 2004.
Information Architecture BOF: Report of the Fall 2003 Meeting October 28, 2003 Dan Crichton, NASA/JPL.
07-Apr-2014-cesg-1 Jonathan Wilmot (WG Chair) Ramon Krosley (DWG Chair) SPACECRAFT ONBOARD INTERFACES SERVICES (SOIS) AREA APP WG.
Information Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Steve Hughes, NASA/JPL.
May SPACE LINK AREA MID-TERM REPORT SUMMARY TECHNICAL STATUS 1.DATA COMPRESSION WG Goal : specify an image compression algorithm fulfilling identified.
Security WG: Report of the Fall 2004 Meeting November 19, 2004 Howard Weiss.
1 CCSDS Security Working Group Fall 2011 Meeting 1-2 November 2011 University of Colorado Boulder, Colorado USA Howard Weiss NASA/JPL.
1 19 September 2005 Space Link Services Area report to CESG Atlanta, Georgia, USA, 19 September 2005.
Security WG: Report of the Fall 2015 Meeting ESA/ESOC, Darmstadt DE 12 November 2015 Howard Weiss NASA/JPL/PARSONS
CSS AREA REPORT 24 January 2007 Colorado Springs, USA CSS AREA: CSEG/CMC Report, Winter 2007 Meeting Erik Barkley (NASA/JPL) Area Director Yves Doat (ESA)
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
SIS_DTN 1 DTN BP Protocol Specification May 2010 Cleveland OH 2012.
SIS_DTN 1 DTN BP Protocol Specification May 2010 Boulder 2011.
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
Security WG: Report of the Fall 2003 Meeting October 28, 2003 Howard Weiss, NASA/JPL/SPARTA.
CMC meeting, Nov., 2009 Page 1 JAXA CCSDS Status November, 2009 ESA/ESTEC Noordwijk, Netherlands Kaneaki Narita JAXA CCSDS Secretary Office.
0 CCSDS Systems Engineering Area: Security Working Group Howard Weiss NASA/JPL/Cobham (Parsons) October 2011.
Security WG: Report of the Spring 2013 Meeting Bordeaux, France 18 April, 2013 Howard Weiss NASA/JPL/PARSONS skype:
Wireless WG Monthly Teleconference
CCSDS SOIS Wireless WG Monthly Webcon: 04-Aug-2015
[Area Name] Area Report [Name] (Area Chair) [Name] (Area Deputy Chair)
SPACECRAFT ONBOARD INTERFACES SERVICES
SPACE INTERNETWORKING SERVICES (SIS) AREA
Wireless WG Monthly Teleconference
Wireless WG Monthly Teleconference
SPACECRAFT ONBOARD INTERFACES SERVICES
SPACECRAFT ONBOARD INTERFACES SERVICES
Presentation transcript:

10-Dec-2012-cesg-1 Keith Scott (AD) Dai Stanton (DAD) SPACE INTERNETWORKING SERVICES (SIS) AREA REPORT

10-Dec-2012-cesg-2 2 SIS Area Report Meeting Demographics PlenaryCFDP BoFMIADTNDTN-Interop TestVoice ASI CNES11 CNSA 1 (CLTC/BITTT) 1 CSA2 DLR11 1 ESA1 11 INPE JAXA NASA RFSA 1 1 UKSA Other* 1 TOTAL 6 Meeting Duration Agency Diversity

10-Dec-2012-cesg-3 3 Goals: WG review of ‘Digital Motion Imagery’ Red 1 CESG changes Review Green Book published 11/10 for accuracy Discuss future projects Review Interoperability Test Plan Working Group Status: Red 1 released for Agency Review first week of April Ready to perform first prototype / interoperability test by early Summer 2013 Remarks Productive meetings but less participation than in previous meetings Ready to begin reviewing RIDS Red 1 Agency Review began four months later than originally expected--schedule updated in CWE Plans Considering 2 future projects– 1) Motion Imagery Device Control Service with SM&C & possibly 2) joint project with DTN for video application with bundle streaming service Modified ESA/NASA Columbus HD video test plan to cover all required elements in the MIA Digital Motion Imagery xxx book – will serve as interoperability test report (will request waivers for commercial standards) Slight update to Green Book published November 2010 SIS Area Report status:OKCAUTIONPROBLEM Comment: Productive Meetings Working Group Summary Situation: Motion Imagery Applications (MIA) WG

10-Dec-2012-cesg-4 Goals: Review and agreement on the all new chapter 3 material of the Blue Book Proximity Operations and Docking Voice added and reviewed Search and Rescue Voice added and reviewed, more information is needed. EVA and Vehicle to Vehicle voice has been added. New crew IP voice conference, IP phone calls from Space and Audio file handling and voice/text conversion standards added Audio File Formats added and reviewed. Review and update of the security annex of the Blue Book Proposal to update the Green book postponed until after finishing the Blue Book Establish plan and schedule for Blue Book completion (schedule in framework updated Working Group Status: Tasks assigned for final update of Blue Book for review by Spring meeting (come out of Spring meeting to start Red-1 agency review) Plans: Propose a joint meeting with DTN in the Fall (2013) to discuss streaming service over BP Rework the book to add Blue-Book specific material Section 3.5 (human outpost coms) will be moved to a future book status:OKCAUTIONPROBLEM comment: very productive meeting Schedule in CWE Updated Working Group Summary Situation: Voice WG SIS Area Report

10-Dec-2012-cesg-5 Goals: Review Solar System Internetworking Architecture Green Book Presentations on Erasure Coding under LTP and DTNPerf tool Formulate BP-for-CCSDS test cases Review future security work with SEA-Security WG Update on NASA DTN Activities Review progress on DTN interoperability and deployment / infusion efforts (JAXA, METERON) Working Group Status: LTP testing ready to begin (1 implementation ready, 1 nearly ready – need to identify developer) Coordination of registries between IANA / SANA worked out and moving forward (need to poke dtnrg) Joint / Cross-Area Meetings Informal coordination between SIS-DTN and SEA-Security WGs to coordinate future security Plans Proceed with LTP Testing Complete BP-for-CCSDS test plan and execute Interim meeting with CSS-CSA WG to discuss the interrelationship among all the books dealing with SSI Architecture status:OKCAUTIONPROBLEM comment: Working Group Summary Situation: SIS Area Report Delay/Disruption Tolerant Networking (DTN) Working Group

10-Dec-2012-cesg-6 Goals: Determine if there is enough agency interest to form a WG to update CFDP Initial poll for agency resources to do the work (NASA, ESA) Identify possible updates to CFDP (‘white book’) In order to form a reasonable resource estimate (~50 work weeks, including all documents and interoperability testing) Identify potential WG chair BoF Status: There does seem to be agency interest and a body of work that would be worth doing to update CFDP Joint / Cross-Area Meetings No Plans Move forward with WG formation status:OKCAUTIONPROBLEM comment: BoF Summary Situation: SIS Area Report CFDP 5-Year Refresh BoF

10-Dec-2012-cesg-7 1.Need to spin up WGs for Book Renewals: SCPS-TP SIS Area Report: Other

10-Dec-2012-cesg-8 1.CFDP-over-Encapsulation Working Group Submitted for RED-1 Agency review 2.Motion Imagery and Applications Working Group Book out for Red 1 Agency Review Opportunity for real-world interoperability test between NASA & ESA in early 2013 Beginning plans for future MIA books 3.Delay Tolerant Networking Working Group About to start LTP interoperability testing Reviewed BP for CCSDS book; started building interoperability test requirements and test cases Good discussions of interoperability and deployment use cases 4.Voice Working Group Revising Blue Book; general agreement on the content of the all new book Target Red-1 agency review following Fall 2013 meeting Proposal to update Green Book after finishing Blue Book 5.Other CFDP Refresh BoF held; will propose WG formation Joint JAXA / NASA DTN interoperability testing Need to spin up SCPS-TP refresh WG May be pro-forma Current resource agreements and schedules reflected in CWE. SIS-DTN Network Management projects have not started due to resource constraints; resources for these have not been identified yet Prototyping resources for some prototypes have yet to be identified, but we don’t anticipate any issues SIS Area Report: Summary

10-Dec-2012-cesg-9 SIS Resolutions Resulting From Spring 2013 Meeting Will propose formation of CFDP 5-year Refresh WG