Presentation is loading. Please wait.

Presentation is loading. Please wait.

SIS_DTN 1 DTN BP Protocol Specification May 2010 Cleveland OH 2012.

Similar presentations


Presentation on theme: "SIS_DTN 1 DTN BP Protocol Specification May 2010 Cleveland OH 2012."— Presentation transcript:

1 SIS_DTN 1 DTN BP Protocol Specification May 2010 Cleveland OH 2012

2 SIS_DTN 2 Status Goals of this activity Advance BP towards Blue Book status Current activity Updates to the RIDs of the last BP working group have been worked with final disposition resolved for all - RID responses are mostly complete - Addition of Delay-Tolerant Payload Conditioning (DTPC) in the resolution of RID ESA-CT-2. - Addition of an Annex for Aggregate Custody Signal (ACS) - Will include RIDs into a red-2 version At the last working group meeting forward work was proposed for the red-1 document - Status of the Bundle Security Protocol in relation to BP - Generation of a yellow book - Generation of an RFC to move the SANA registries forward May 2010

3 SIS_DTN 3 Backups May 2010

4 SIS_DTN 4 May 2010


Download ppt "SIS_DTN 1 DTN BP Protocol Specification May 2010 Cleveland OH 2012."

Similar presentations


Ads by Google