Presentation is loading. Please wait.

Presentation is loading. Please wait.

Cesg-1 CCSDS Engineering Steering Group: Report to the CCSDS Management Council (CMC) and Interagency Operations Advisory Group (IOAG): Fall 2010 BSI,

Similar presentations


Presentation on theme: "Cesg-1 CCSDS Engineering Steering Group: Report to the CCSDS Management Council (CMC) and Interagency Operations Advisory Group (IOAG): Fall 2010 BSI,"— Presentation transcript:

1 cesg-1 CCSDS Engineering Steering Group: Report to the CCSDS Management Council (CMC) and Interagency Operations Advisory Group (IOAG): Fall 2010 BSI, London, UK 03 November 2010 SEA Updates Nov 2010

2 cesg-2 SYSTEMS ENGINEERING (SE) AREA Peter Shames (AD) Takahiro Yamada (DAD) Nov 2010

3 cesg-3 1.Information Architecture WG (& ISA BoF, re-chartering) 2.Security WG 3.Delta-DOR WG 4.Timecode WG (completed, Pink Sheets, ready for review) 5.Time Synchronization & Correlation BoF (charter produced) 6.Space Link Security BoF (joint w/ SLS, reported in SLS) 7.SANA Steering Group (WG completed, Yellow Book RIDs resolved) SEA Responsibilities Overall architecture for space mission communications, operations, and cross-support Coordinate and collaborate with the other areas about architectural choices and options Support the CESG in evaluating consistency of all area programs of work with the defined architecture Create such working groups and BoFs as are required to progress the work of CCSDS A.CURRENT GROUPS WITHIN THE AREA Systems Engineering Area Report Nov 2010

4 cesg-4 SE Area Report SE Area Report B. Meeting Demographics PlenarySecurity Time Cor&Sync BOFDDORDDOR + SMIA/ISA BOFIA ASI CNES1 11 CNSA13 CSA1 1 DLR 2 1 ESA32125 INPE JAXA 12 NASA8441113 RFSA2 11 UKSA 1 Other TOTAL 161266924 Meeting Duration 12.50.54 1.5 Agency Diversity 6535422

5 cesg-5 1.Information Architecture WG Goals: Develop a high level Information Architecture Reference Model Define Registry Reference model & associated registry information model (w/ IPR WG) Re-charter IA WG to develop Information Services Architecture (ISA, SOA-like) reference model and services (draft charter Nov 2010) Working Group Status: IAWG developed top down registry reference model & prototypes, info model & services interfaces, IPR WG developed bottom up XML registry & prototypes to be coordinated in joint meetings, IPR not present for these working meetings Extensive discussion on the Registry Reference Model Magenta Book, derived from ebXML (White) and Information Services Architecture recommended practice (White); expect Registry Reference Model Red Book for review Dec 2010 Presentations were given in the SM&C WG and RASIG meetings. Agree to do joint prototyping of SM&C Directory Service using ISA Registry framework. Revised charter for Information Services Architecture WG has been drafted Working Group Summary Situation: status:OKCAUTIONPROBLEM IPR not present, good meeting with SM&C Good C.SUMMARY TECHNICAL STATUS Systems Engineering Area Report Nov 2010

6 cesg-6 2.Security WG Goals: Develop security overview & threat assessment, and security architecture, framework and related standards Current focus (security architecture, algorithms, key management, mission planners, glossary) Working Group Status: Progress Algorithm document (BB draft Red-1) updated, to be completed in Winter 2010. Planning for implementation & testing, Yellow Book. Security Architecture sent to AD, to be sent to CESG this Fall. Mission Planners Guide to be sent to Tech Editor this Fall. Key Management Green Book completed, to be sent to Tech Editor. KM Blue Book (White) for symmetric KM making good progress, discussed with SM&C. Security Glossary, need to substitute ISO definitions where available, to be complete by Winter 2010 Network layer security – IPSec with Encapsulating Security Payload (ESP), only relevant in near Earth (out to Lunar) operations domain. Good joint progress on Space Link Layer Security WG, reported in SLS Working Group Summary Situation: status:OKCAUTIONPROBLEM Advancing and producing good products. Good Systems Engineering Area Report Nov 2010

7 cesg-7 3.Delta-DOR WG Goals: Develop detailed requirements for delta differential one-way ranging (Delta-DOR) service Coordinate work in other WGs (SLS/Ranging, CSS/CSTS, MOIMS/Nav, CSS/SM) Develop integrated vision of service and interoperability points Working Group Status: Magenta Book: second Agency review completed, 30 RIDs resolved, sent MB to AD for publication in Fall 2010. Delta-DOR Raw Data Exchange Format (DRDEF) Blue Book draft (Red-1): AD issues were resolved. Book to be submitted for CESG Review by Nov 2010, complete agency review of Red-1 by Feb 2011. Schedule for the Green Book has been pushed to Spring 2011 Good progress on early & near term 3 agency interoperability validation, all three agencies committed to doing interoperability testing, YB test report being planned WG reports that not having NASA rep for face to face meetings hampered progress (budget issues) Working Group Summary Situation: status:OKCAUTIONPROBLEM Making very good progress Very Good Systems Engineering Area Report Nov 2010

8 cesg-8 4.Timecode WG Goals: Update timecode formats Explore need for time and synchronization standards Working Group Status: No meeting in London Revised Pink Sheets for Time Code reviewed & RIDs resolved WG ready to disband once Pink Sheets are published WG has done validation prototyping, has completed tests and finalized interoperability report, submitted to Secretariat for agency review Working Group Summary Situation: status:OKCAUTIONPROBLEM Ready to completeWaiting on agency review Systems Engineering Area Report Nov 2010

9 cesg-9 5.Time Correlation & Synchronization BoF Goals: Develop outline for White Paper and requirements for time correlation and synchronization standards Develop WG charter BoF Status: BOF met on Wednesday afternoon with limited attendance (Greenberg (JPL), Pitts (MSFC), Sank (GSFC), Enrich (ESA), Gracher (FSA)). Discussed requirements, priorities, and agency interests ESA’s main objective is a Magenta Book identifying best practices for time correlation with current standards NASA is interested in advocating methods to achieve much more accurate time correlations for space missions. NASA has a long term goal of establishing a standard for synchronization of the clocks on vehicles within a remote operational network. Agree to start with the Time Correlation Magenta Book and to advocate for higher accuracy time stamp with other groups, then assess requirements for time correlation and synchronization Draft charter has been sent to AD to be forwarded to CESG status:OKCAUTIONPROBLEM Start-upRequires broader agency support Systems Engineering Area Report Nov 2010

10 cesg-10 6.SANA Operations Goals: Operate the Space Assigned Numbers Authority (SANA) Operations Status: SANA operator in place, met this week with several WGs, created web site including a set of candidate registries based on existing CCSDS documents Draft Yellow Book procedure CCSDS 313.0-Y-0.1 sent for final CESG review Requests new “SANA Considerations” section and WG interaction on registry items Draft “candidate registries” need to reviewed by WGs, simple procedure developed for handling “grandfathered” registries already documented Met with SIS-AMS,DTN, SLS-SLP, SEA-SEC, MOIMS SM&C & Nav, CSS-CSTS SANA Steering Group met CESG Chair, SEA AD, SANA WG rep Need to identify at least two other members to ensure stakeholder & agency balance Need to develop policy for CCSDS OID registry management Operations - Summary Situation: status:OKCAUTIONPROBLEM Making good progress SANA operator very responsive Systems Engineering Area Report Nov 2010

11 cesg-11 SANA Web Site http://www.sanaregistry.org Nov 2010

12 cesg-12 D. Cross Area Meetings Joint IA/IPR Meeting No meeting held, MOIMS IPR not present for meetings Propose combining all interested participants into new ISA WG that is being chartered, MOIMS AD has stated no objection Joint SM&C / IA Meeting Present the space Information Services Architecture (ISA) reference model, the registry service architecture and its relationship to the rest of the CCSDS services Discussed the relationship between the SM&C “directory service” and the ISA framework Agreed to coordinate with SM&C - To demonstrate implementation of the SM&C Directory service using the ISA Registry reference model and prototype implementation - To evaluate the SM&C MAL as a possible messaging layer for ISA, along with HTTP Sec WG / SDLS Meeting Joint meeting was productive and work is largely on track Have identified no “show-stopper” from security point of view with how and where the security block is to be inserted in the space link frames Details reported by SDLS WG chair in SLS report Will require resources for interoperability testing … Systems Engineering Area Report Nov 2010

13 cesg-13 SEA / CSS Reference Architecture SIG Relationship between CCSDS Reference Architecture and RASDS and ISA seems to now be quite well understood and agreed There is agreement on a reference architecture framework consisting of the RASDS Viewpoints (Enterprise, Functional, Connectivity, Communications, Information), with an added Service Viewpoint ala the Cross Support Services Architecture (also used in IOAG SISG efforts) and some expansion of the Information Viewpoint ala the RASIM Growing recognition that there is a need for the sort of UML or SysML architecture modelling framework that was halted in the earlier RASDS work SEA recommends adopting a streamlined approach that focuses immediately on two items: 1. Revisit the RASDS and quickly develop the conceptual framework for modeling the Service Viewpoint and the extended Information Viewpoint 2. Work with the ESA modeling team to refine the set of viewpoint specifications that they apply to the ExoMars modeling effort, which is intended to verify the framework and provide useful models of ExoMars D. Cross Area Meetings, contd Systems Engineering Area Report Nov 2010

14 cesg-14 Time Code WG Time CodePink Sheets sent to Secretariat Time Code Test ReportYellow Book done (Aug 2010) Time Correlation & Synchronization BoF Time Correlation & SyncWhite Paper in discussion Time Correlation & SyncWG Charter agreed (to CESG Nov 2010) SANA Operations SANA Policy & ProceduresYellow Book CMC review (Nov 2010) SANA Web Site OperationalCandidate registries for review CCSDS GlossaryDraft version Dec 2010 E. SUMMARY: MAJOR ACCOMPLISHMENTS AND CONCERNS IN LAST REPORTING PERIOD, contd Systems Engineering Area Report Nov 2010

15 cesg-15 IA WG (ISA BoF) RASIM Reference Model Green Book being updated for SOA Registry Reference ModelMagenta Book drafted (expect Red-1 Dec 2010) Information Services ArchitectureConcept Paper updated (WP Jan 2011) ISA WG CharterDraft prepared (to CESG Nov 2010) Sec WG Security AlgorithmsIntegrated Blue Book drafted (Red-1 Winter 2010) Key ManagementGreen Book to CESG (Nov 2010) Symmetric Key ManagementBlue Book being drafted (WB Winter 2010) Mission Planners Security GuideGreen Book final to editor (Nov 2010) Network Layer SecurityGreen Book in planning (WB Fall 2010) Security GlossaryExpect to put in SANA (Winter 2010) Delta DOR WG D-DOR Reference ModelMagenta Book RIDs processed (Blue Winter 2010) D-DOR Data ExchangeBlue Book to Agency review (Red-1 Nov 2010) D-DOR OverviewGreen Book draft begun (GB Apr 2011) E. SUMMARY: MAJOR ACCOMPLISHMENTS AND CONCERNS IN LAST REPORTING PERIOD Systems Engineering Area Report Nov 2010

16 cesg-16 Systems Engineering Area Report Submit Time Correlation and Synchronization WG charter for approval (Nov) Submit Information Service Architecture (IA WG re-chartering) for approval (Dec) Forward D-DOR Magenta Book for final approval for publication (Nov) Forward D-DOR Raw Data Exchange Blue Book for Red-1 review (Dec) Forward Security Reference Architecture Magenta Book for Red- 1 review (Nov) Forward Security Key Management Green Book for final approval for publication (Nov) Forward Mission Planners Security Guide Green Book for final approval for publication (Nov) Request Secretariat to insert SANA Registry web site in the CCSDS web site as the main registrar Nov 2010 Forthcoming Resolutions from SEA:

17 cesg-17 SYSTEMS ENGINEERING AREA: ITEMS TO BE BROUGHT TO CMC ATTENTION 1.CCSDS Procedures update Out for final CMC review, needs badly to be published 2.SANA Considerations The SANA YB requests that the CCSDS Procedures & Publications manuals be updated to reference a mandatory “SANA Considerations” section, to be discussed SANA asks that the CMC appoint at least two other members to the SANA Steering Group to ensure stakeholder & agency balance SANA Operator has created candidate registries, including a CCSDS Glossary, need to have these reviewed by Areas & WGs and approved for release (or not) All new WG projects should analyze SANA issues as part of their process, and ensure that they address them, potentially with support of the SANA operator 3. SEA IA and MOIMS IPR WGs Working groups have been operating increasingly well as a joint effort for a few years now SEA AD recommends that these two groups be re-organized into one, with a new charter that is focused on the Information Services Architecture and also incorporates the present registry- repository and information modeling and architecture tasks A new ISA WG charter has been drafted and is being finalized 4. Words of appreciation The SEA wishes to thank the workshop organizers for doing an excellent job of arranging the facility, and managing meetings rooms Nov 2010

18 cesg-18 Nov 2010

19 cesg-19 Quoted from Procedures Manual, A02.1-Y-2.1a 1.4.2 b) Consensus. The entire CCSDS technical organization is run by a process of consensus, and it is the CESG that decides if the standardization process has come up with a result that reflects a real consensus. Consensus does not necessarily mean that unanimous agreement has been reached, but that the result incorporates the best set of compromises that all parties can agree to. 1.4.3 CESG Responsibilities h) reviewing requests from ADs to advance specifications in their Areas along the various document tracks, and making consensus recommendations to the CMC when it feels that documents and related materials are ready for publication as CCSDS products, in their various interim and final stages of maturity; Nov 2010

20 cesg-20 SEA Meeting Objectives SEA CCSDS Procedures Pending Secretariat finalization Security WG Security Architecture (MB)RB, being edited for agency review Encryption & Authentication (BB)Combined into “folio” Algorithm RB, final edits Mission planner (GB)WB, 3rd draft Key Management (GB, MB)GB, draft to editor after meeting, MB discussions Standard security sectionMandatory Information Architecture WG RASIM, including Use Cases & patterns (MB)GB needs updates for ISA IA / IPR Registries (BB)Being prepared for RB review; NASA implementation underway SOA & Web Services Ref Arch (MB)IA shifting to Information Services Architecture focus Delta-DOR WG Overview document (GB)WB Draft distributed to the WG Standard practice (MB)RB had 2nd Agency review, RIDs to be processed Data Exchange standard (BB)RB draft to editor Fall 2010 (after Fall Meeting) Time Code WG Time Code Standard (BB)Finish interoperability test report then agency review Time Correlation and Synchronization BoF Draft charterUpdate draft charter, gather requirements and initiate white paper SANA WG Work completedSANA YB in CESG review Updated: Shames Nov 2010


Download ppt "Cesg-1 CCSDS Engineering Steering Group: Report to the CCSDS Management Council (CMC) and Interagency Operations Advisory Group (IOAG): Fall 2010 BSI,"

Similar presentations


Ads by Google