Installation and Commissioning of the ATLAS LAr Readout Electronics

Slides:



Advertisements
Similar presentations
ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
Advertisements

Readout of the ATLAS Liquid Argon Calorimeters John Parsons Nevis Labs, Columbia University Representing the ATLAS LAr Collaboration ATLAS.
Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
S 1 Summer Student Sessions 13 August 2008 Chew Soo Hoon University Of Malaya, Malaysia Jan Stark LPSC, Grenoble, France
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
The First-Level Trigger of ATLAS Johannes Haller (CERN) on behalf of the ATLAS First-Level Trigger Groups International Europhysics Conference on High.
Pascal PERRODO, ATLAS-LAPP
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
Overview of ATLAS Liquid Argon Frontend Crate Electronics John Parsons Nevis Labs, Columbia University LAr Electronics ASSO Review, June ATLAS.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
LAr Frontend Board PRR Introduction 1.Overview of FEB functionality 2.FEB performance requirements 3.Development and evaluation of FEB 4.Organization of.
Mainz: Contributions to the LArg-Calorimeter Purity monitoring of the liquid argon and temperature measurement in the three cryostats - Old electronics.
Status of opto R&D at SMU Jingbo Ye Dept. of Physics SMU For the opto WG workshop at CERN, March 8 th, 2011.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
A Serializer ASIC for High Speed Data Transmission in Cryogenic and HiRel Environment Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group.
Preliminary Design of Calorimeter Electronics Shudi Gu June 2002.
Hadron Calorimeter Readout Electronics Calibration, Hadron Calorimeter Scintillator Upgrade, and Missing Transverse Momentum Resolution due to Pileup Zishuo.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
A. Sukhanov, BNL1 NCC Electronics Readout of pad structured sensors ● High dynamic range ● Summing signals from 6 detectors on one preamp ● NCC should.
The ATLAS Tile Calorimeter: Commissioning and Preparation for Collisions Presented by Oleg Solovyanov On behalf of the Tile Calorimeter Collaboration of.
1 A ROOT Tool for 3D Event Visualization in ATLAS Calorimeters Luciano Andrade José de Seixas Federal University of Rio de Janeiro/COPPE.
Introduction Construction, Integration and commissioning on the surface Installation and commissioning after installation in the cavern Selected performance.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
A. Gibson, Toronto; Villa Olmo 2009; ATLAS LAr Commissioning October 5, 2009 Commissioning of the ATLAS Liquid Argon Calorimeter Adam Gibson University.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
1 I discuss only the Barrel EM Lar - most advanced This is the FEC (Front End Crate at the back of the EM calorimeter. This is what is mostly discussed.
28/03/2003Julie PRAST, LAPP CNRS, FRANCE 1 The ATLAS Liquid Argon Calorimeters ReadOut Drivers A 600 MHz TMS320C6414 DSPs based design.
Algorithms for the ROD DSP of the ATLAS Hadronic Tile Calorimeter
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Status of NA62 straw electronics Webs Covers Services Readout.
8/18/2004E. Monnier - CPPM - ICHEP04 - Beijing1 Atlas liquid argon calorimeter status E. Monnier on behalf of the Atlas liquid argon calorimeter group.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Nirmalya Parua March 17, 2003 The RunII Calorimeter Nirmalya Parua (For the Calorimeter Group) Shifter’s Tutorial March 17, 2003  Overview Of the D0 Calorimeter.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Links from experiments to DAQ systems Jorgen Christiansen PH-ESE 1.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade Tiankuan Liu On behalf of the ATLAS Liquid Argon Calorimeter Group Department of.
FPGAs in ATLAS Front-End Electronics Henrik Åkerstedt, Steffen Muschter and Christian Bohm Stockholm University.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Test Beam Results on the ATLAS Electromagnetic Calorimeters Lucia Di Ciaccio – LAPP Annecy (on behalf of the ATLAS LAr Group) OUTLINE Description of the.
Standard electronics for CLIC module. Sébastien Vilalte CTC
LHC Symposium 2003 Fermilab 01/05/2003 Ph. Schwemling, LPNHE-Paris for the ATLAS collaboration Electromagnetic Calorimetry and Electron/Photon performance.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
17 Apr 2002 MCLARG Electronics Meeting News HEC Preshaper PRR passed on Thursday Apr 11 LECC02 (Workshop on LHC Electronics) will be held in Colmar, France.
1 Status report on the LAr optical link 1.Introduction and a short review. 2.The ASIC development. 3.Optical interface. 4.Conclusions and thoughts Jingbo.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
The ATLAS Liquid Argon Calorimeter: Overview and Performance Huaqiao ZHANG (CPPM) On behalf of the ATLAS Liquid Argon Calorimeter Group.
EPS HEP 2007 Manchester -- Thilo Pauly July The ATLAS Level-1 Trigger Overview and Status Report including Cosmic-Ray Commissioning Thilo.
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Calorimeter Status Electronics Installation and Commissioning
D. Breton, S. Simion February 2012
Installation and Commissioning of the ATLAS LAr Readout Electronics
ATLAS calorimeter and topological trigger upgrades for Phase 1
CMS EMU TRIGGER ELECTRONICS
VELO readout On detector electronics Off detector electronics to DAQ
LHCb calorimeter main features
Regional Cal. Trigger Milestone: Production & Testing Complete
Example of DAQ Trigger issues for the SoLID experiment
Commissioning of the ALICE-PHOS trigger
The ATLAS LAr. Calibration board K. Jakobs, U. Schaefer, D. Schroff
PID meeting Mechanical implementation Electronics architecture
The LHCb Front-end Electronics System Status and Future Development
Calorimeter Upgrade The Tevatron and Dzero Upgrades
Presentation transcript:

Installation and Commissioning of the ATLAS LAr Readout Electronics Jingbo Ye Southern Methodist University For the ATLAS Liquid Argon Calorimeter Collaboration Installation and Commissioning of the ATLAS LAr Readout Electronics

Installation and Commissioning of the ATLAS LAr Readout Electronics ATLAS LAr Calorimeter Physics goals dictate the calorimeter design Higgs search in H, H ZZ4leptons (lepton = e, ) requires precise measurement of photon and electron. SUSY search using missing ET needs precise measurement of visible energy. Low event rate in searches for Higgs and other new physics (W’ev, Z’ee) require high efficiency, high resolutions (E and spatial). High (20 MeV to 2 TeV) dynamic range to maximize discovery potential. The ATLAS LAr calorimeters Almost hermetic: ||  4.9 High granularity: ~190 000 cells EM Accordion (Pb/LAr) e/: (E)/E(GeV) = 10%/√E  0.7%. Hadronic Endcap (HCAL) Forward Cal (FCAL, Cu/LAr) Installation and Commissioning of the ATLAS LAr Readout Electronics

ATLAS LAr Calorimeter Readout Front-end Crate Back-end Crate There are many other boards in BEC Pulser + 128 distributors 16 bit DAC Cali. Detector cell preamp SCA, 40 Msps PU FPGA+DSP Calculate E,  ADC Event builder Optical Link, TX 1.6 Gbps Optical Link, RX Slink To DAQ 1 ~150 m 12.8 Gbps input, 8 FEBs 10 FEB 100 L1Trigger ROD shaper  L1 trigger interface L1 trigger processors TBB L1Trigger LHC Clock+fanout TTC interface Controller optical Installation and Commissioning of the ATLAS LAr Readout Electronics

ATLAS LAr Calorimeter Readout Front-end readout Requirements Readout channel: ~ 190,000 Dynamic range: 16 bits (3 gains plus 12 bit ADC), signal shapped to prevent electronics pileups. Data rate: 40MHz sampling and analog storage (SCA); L1 trigger on board up to 100 kHz. Rad-hard requirements (with safety factor): TID 850 Gy NIEL 1E13 n/cm2 (1 MeV eq.) SEU 4E12 h/cm2 (E > 20 MeV) 40 Msps 1.6 Gbps serial data rate Installation and Commissioning of the ATLAS LAr Readout Electronics

ATLAS LAr Front-end Board Optical link TX (Sub. System, DMILL, COTS) TTCRx (DMILL) SPAC (DMILL) SCA Controllers (DSM) GainSel (DSM) ADCs (COTS) SCAs (DMILL) Shapers (AMS) Preamps (sub. System) Mix of three rad-hard technologies, 16 pos. Vreg, 6 neg. Vreg. Installation and Commissioning of the ATLAS LAr Readout Electronics

ATLAS LAr Calorimeter Readout Back-end readout Requirements Input data rate at 12.8 Gbps from 8 FEBs Data processing speed meet 100 kHz L1 trigger requirement. On-line monitoring, histograming and control request signal generation. Optical link receiver FEB 1 FEB 8 FEB 2 FEB 7 FPGA Data check, Re-formate 720 MHz DSP E > Eth, Time, 2, 10 m process Output evnt Build/hist Slink To ROB/DAQ 12.8 Gbps input data ROD motherboard Two or four processing units. Process speed meets 100 kHz L1 requirement. TTC interface to run on LHC clock. VME interface. Installation and Commissioning of the ATLAS LAr Readout Electronics PU

Front-end Electronics Design challenges Large readout channels (~190k). High density frontend boards (128 channels per board). Low power (~ 0.8 W) per channel, but ~100 W per FEB  water cool. Large dynamic range (16 bits resolution achieved by 3 gains with a 12 bit ADC). Measure signals at bunch crossing frequency of 40 MHz. Store signals during L1 trigger latency of up to 100 bunch crossings. Digitize on board and read out 5 samples/channel at a max. L1 rate of 100 kHz. Event build and data serialization on board. Send 1.6 Gbps data through optical data link to backend. Optical data link used to reduce coherent noise. Mixed small analog and MHz to GHz digital signals on the same board. Very low jitter clock (<20 ps) for high speed serial data transmission. High reliability over expected lifetime of > 10 years. Components and subsystems must tolerate expected radiation levels of 10 yrs LHC operation  large number of rad-hard ASICs development and extensive rad-hard evaluations on both ASICs and COTS. Installation and Commissioning of the ATLAS LAr Readout Electronics

Installation and Commissioning of the ATLAS LAr Readout Electronics ASICs SCA the 144 cell analog pipeline used on FEB to provide analog signal storage during L1 latency of up to 2.5 s (100 bunch crossings). Design and developed in rad-soft technology, and then migrated to rad-hard using the DMILL technology. Production tests: robotic test station to test 50000+ chips. FEB Technology Components AMS BiCMOS shaper (32) DMILL SCA(32), SMUX, TTCrx, CFGCTRL, SPAC_slave, DSM (0.25m) GainSele(8), QPLL, CLKFO, SCAC(2), DCU2(2) RHBip 1 VREG (19) Calib. board Technology Components AMS BiCMOS HF Switch (128) DMILL Opamp (128), DAC, CALogic(6), SPAC_slave, TTCrx, delay(2). RHBip 1 VREG (5) Installation and Commissioning of the ATLAS LAr Readout Electronics

Production Close to Completion FEB: 1619 boards delivered with 1611 needed (with spares). Each FEB went through 6 hours Highly-Accelerated-Stress-Screening test to simulate the first few weeks of LHC operation and to weed out “infant mortality”. All tests (digital and analog) have been completed at Nevis, BNL and LAL (Orsay). Meet clock jitter < 20 ps requirement for high speed data transmission. Calibration board: About 80 boards have been produced, tested and delivered to CERN, enough for the barrel commissioning. The rest boards (~40) are still been worked on in lab and will be delivered to CERN soon. Controller board: All 123 boards have been produced, tested. Most of them have been delivered to CERN. Tower builder board: All 135 boards have been produced, tested and delivered to CERN. Installation and Commissioning of the ATLAS LAr Readout Electronics

Installation and Commissioning of the ATLAS LAr Readout Electronics Beam Test Results Beam tests using a real detector module with the production version of the readout electronics have been carried out. Preliminary data indicate the electronics system is working up to its design spec: 20 GeV electron 180 GeV electron Data MC comparison Installation and Commissioning of the ATLAS LAr Readout Electronics

Installation and Commissioning Status EM barrel front-end crates (32) fully equipped except two half crates. Tests are under way and “fast” tests have been successfully carried out. Endcap front-end crates start to be equipped and readout. Cabling, including optical fibers are in place for the barrel; for the endcaps, we are waiting for the cable chains. Cooling (both air and water) and other services are either done or catching up. Problems on the LVPS are been closely monitored and worked with the vendor. Back-end electronics installation matches well with front-end. Long term stability is being checked on a 3 full crates readout configuration and has been running for one month. With more LVPS coming in, this test will be expanded to all equipped crates. Racks and crates for ROD system, powered, tested with the Injector. Connection with FEBs in progress. Equipping the front end crates Endcap in place Installation and Commissioning of the ATLAS LAr Readout Electronics

Installation and Commissioning of the ATLAS LAr Readout Electronics LAr Commissioning Barrel cryostat is cooling down, now cold and filled with LAr, ready to raise HV. Cosmic muons run to commission the detector and the readout system. Will start in summer 2006 Cosmic muons will be recorded with LAr + Tile. MC and analysis tools are prepared. Results: stay tuned. Installation and Commissioning of the ATLAS LAr Readout Electronics

Installation and Commissioning of the ATLAS LAr Readout Electronics Conclusions The ATLAS Liquid Argon calorimeter readout electronics system is in its installation and commissioning stage. This readout system is designed to fulfill the requirements from physics goals set for the ATLAS experiments. In order for the front end electronics to work on the detector, in radiation environment, large number of ASICs have been developed using various rad-hard technologies. This system has reached its design goals through tests from past beam tests. More results will come soon from the cosmic muon runs this summer. These results will further test the system design goals with the whole system working together. Installation and Commissioning of the ATLAS LAr Readout Electronics