Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.27 AR 2014Page No.: 1 Activity Report 2013 WG A3.27 The Impact of the Application.

Slides:



Advertisements
Similar presentations
1 The mission of Study Committee A3 is to facilitate and promote the progress of engineering and the international exchange of information and knowledge.
Advertisements

Study Committee Representatives Annual Report December, 2012
CIGRE Paris Session Sunday 24 th – Friday 29 th August, 2014 Monday 25 th … General Assembly Tuesday 26 th … SC A3 meeting Wednesday 27 th AM …
AG.03: CIGRE SC A3 Green Book planning
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.28 AR Page No. 1 Activity Report WG A3.28 Switching phenomena.
International Symposium on Standards for UHV Transmission System Impacts on UHV Substation Equipment On behalf of CIGRE WG A January 2009,
Study Committee A3 HIGH VOLTAGE EQUIPMENT CIGRE SC A3 meeting in Paris, August 26, 2014 Page No. 1 Working Group Activity Report 2014 JWG A3/B5/C4.37 System.
Study Committee A3 HIGH VOLTAGE EQUIPMENT CIGRE SC AG1 meeting in Berlin, March 4, 2015 Page No. 1 Working Group Activity Report 2015 JWG A3/B5/C4.37 System.
CIGRE WG C PRACTICES IN INSULATION COORDINATION OF MODERN ELECTRIC POWER SYSTEMS AIMED AT THE REDUCTION OF INSULATION LEVELS WG Composition: WG.
1 AG.03: CIGRE SC A3 Green Book proposal (based on experience of Brazilian NC to publish CIGRE textbooks) CIGRE SC A3 Green Book Project Team Paulo Fernandez.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
1 60 th CIGRE Technical Committee meeting Paris France, 1 September th informal CIGRE Technical Committee meeting Montreal Canada, 3-4 October 2012.
Doc.: IEEE /0217r0 Submission March 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG March 2015 Agenda Date: Authors:
Study Committee A3 HIGH VOLTAGE EQUIPMENT Activity Report 2014 WG A3.30 SUBSTATION EQUIPMENT OVERSTRESS Convener: Antonio Carvalho - BR Secretary: Jorge.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.26 AR 2014Page No.: 1 Activity Report 2014 WG A3.26 Influence of shunt capacitor.
INTERNATIONAL ELECTROTECHNICAL COMMISSION Report on SC 17A Activity HV switchgear & controlgear Denis Dufournet Anne Bosma A3-14 (AG 01 ) 013 IWD.
Amantegui Javier (SP) CIGRE Study Committee B5 1 CIGRE STUDY COMMITTEE B5: MISSION AND CHALLENGES Javier Amantegui (Spain) Chairman of CIGRE-SC-B5 “Protection.
How an idea becomes an IEC standard Gary Johnson Chairman IEC SC45A
SC-A3 (High Voltage Equipment) SCA3 meeting, Delft (Neetherlands), March 12, 2014 A. Mercier (Convener) WG: A3.35 report Guidelines and Best Practices.
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
1 CNC-CIGRE Study Committee Report October 18-20, 2010 VANCOUVER CIGRÉ SC – A3 High-Voltage Equipment Hubert Mercure.
1 Accredited Standards Committee C63 ® - EMC ANSI ASC C63 Subcommittee 7 Spectrum Etiquette Report to C63 H. Stephen Berger Chair, SC7 November 13, 2014.
Privecsg ecsg 1 IEEE 802 EC Privacy Recommendation Study Group Update to 802 Sept Interim meetings Juan Carlos Zuniga, InterDigital.
Legislative Policy Committee ISAC Board approved concept at their meeting in December.
IEEE Robotics and Automation Society: Meetings & Conferences Report T. J. Tarn IEEE RAS Vice-President for Conferences October 2005 IEEE RAS.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.24 AR 2014Page No.: 1 Activity Report 2014 WG A3.24 Tools for Simulating Internal.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A Page No.: 1 Activity Report 2014 WG A3.33 Experience with equipment.
CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
1 Accredited Standards Committee C63 ® - EMC ANSI ASC C63 Subcommittee 7 Spectrum Etiquette Report to C63 H. Stephen Berger Chair, SC7 May 7, 2013.
CISPR/TC77 Joint Task Force Activity Update ACEC meeting in Paris, June 2006 Prepared by Donald N. Heirman Chairman CISPR Subcommittee A.
CIGRE WG C4.503 – Numerical techniques for the computation of power systems, from steady- state to switching transients WG Composition:  Jean Mahseredjian.
Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB.
Doc. IEEE n: Submission Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG 4n discussion.
Timeline for the oneM2M Partnership Project Timeline and Milestones [Joachim Koss, ETSI] Contribution to oneM2M plenary, 14 Mar 2012 Doc: Source: [ETSI]
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Report to Main C63 Committee Stephen R Whitesell Chair, SC5 November 12, 2015.
Coordination Activities by JICCG for UHV technology standardization Hisatoshi Ikeda Co-Chairman of IEC/JICCG Toshiba Co. & Kyushu Institute o f Technology.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 8 Bob DeLisi Chair 2015 November 11.
Doc.: IEEE /176r1 Submission March 2000 John Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
CIGRE JWG A2/C4.52 – High-Frequency Transformer and Reactor Models for Network Studies WG Composition:  WG Convener: Bjørn Gustavsen  WG Secretary: Angelica.
CIGRE WG C4.24 – Power Quality and EMC Issues associated with future electricity networks WG Composition:  Convener: Francisc Zavoda; Secretary: Sarah.
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
WG Composition: WG Convener: Bjørn Gustavsen
GCOS IP and Update on CEOS Response
September 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for September 2016]
September 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Opening Information for September.
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
ISO TC268 SC1 - Smart Community Infrastructures -
NG60 SG March 2015 Agenda Date: Authors: March 2015
CIGRE WG C4.28 Extrapolation of EMF measurements
CIGRE WG C4.33 – Impact of Soil-Parameter Frequency Dependence on the Response of Grounding Electrodes and on the Lightning Performance of Electrical Systems.
<SECTION> GOLD Affinity Group
WG Composition: WG Convener: W. A. Radasky
TGad September 2010 Closing Report
CNC-CIGRE Study Committee Meeting October 19, 2008 Winnipeg CIGRÉ SC – A3 High-Voltage Equipment Hubert Mercure Hydro-Québec / IREQ.
API SC 10, Work Group 3 Update:
Convergence Bidding Working Group – 10/22/09
November 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for November 2016]
Report of the Nautical Cartography WG Mikko Hovi, Chair NCWG
<month year> doc.: IEEE < e> January 2012
Next Steps Advisory group debrief call Circulate meeting summary
<month year> doc.: IEEE <030158r0> January 2004
Submission Title: TG 4n discussion items for September 2015 meeting
November 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for November 2016]
September 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for September 2016]
September 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Opening Information for September.
STUDY COMMITTEE A1- ROTATING ELECTRICAL MACHINES
September 2016 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Closing Report for September 2016]
Presentation transcript:

Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.27 AR 2014Page No.: 1 Activity Report 2013 WG A3.27 The Impact of the Application of Vacuum Switchgear at Transmission Voltages Convener: R. Smeets (Netherlands)Year of Kick-off: 2009 Secretary: L. Falkingham (UK) Number of Members: 31 Regular Members: 26 Corresponding Members:5 Retiring Members: New Members: WG title and general information A3-14 (AG 01 ) 015 IWD

Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.27 AR 2014Page No.: 2 Technical activities & discussion items Progress of work, documents to be discussed during the SC A3 meeting and future program Recent meetings: April 2012: Tokyo, Japan (6 th ) November 2012: Berlin, Germany (7 th ) May 2013: Galveston, USA (8 th and last) Draft TB submitted to SC. Tutorial given CIGRE Colloquium, Vienna, Sept (1.5 h) Tutorial given ISDEIV (vacuum switching conf.), Russia, Sept (2 h) Tutorial given IEEE Switchgear Committee, USA May 2013 (3 h) Tutorial given CIGRE Colloquium Auckland, Sept (1 h) Tutorial given ICEPE (switchgear) Conference, Matsue, Japan Oct (2 h) Poster at CIGRE 2012 Conference Electra paper 2014

Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.27 AR 2014Page No.: 3 Publications Publication on behalf of the WG (Title, way of publication, stage of preparation, approximate date of final version Draft TB submitted to SC. Chapters: 1. Executive summary 2. Introduction 3. Differences between SF6 – vacuum: device implications 4. Differences between SF6 – vacuum: system implications 5. Existing experience 6. Expectations, hesitations of applications of HV VCB in the future 7. Products on the market and in development 8. Standardization and testing 9. Summary and conclusions Draft ready for circulation within the SC: Q Aim for final version for approval: Q Electra paper Q2 2014

Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.27 AR 2014Page No.: 4 Membership with approval of the last SC meeting