GEO ADC meeting, Washington DC, USA, Sep. 2007 Slide # 1 DA-07-03 DA-07-03 Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Washington DC,

Slides:



Advertisements
Similar presentations
Slide 1 WGISS CEOS WGISS 23, Hanoi, May 2007 Report on CEOS Plenary and CEOS SIT meeting Ivan Petiteville (ESA), WGISS Chair May 2007, Hanoi, Vietnam.
Advertisements

© GEO Secretariat Agenda Item 3. GEO UPDATE. © GEO Secretariat Membership 67 members and 43 Participating Organisations – New Members:Latvia, Moldova,
IN-05 Gap Analysis Definition Identify and address critical gaps in observational networks that reflect, in particular, the needs of developing countries,
© GEO Secretariat Virtual Constellations..new planning process which takes account of international users and their requirements from the outset of satellite.
1 GEOSS Monitoring & Evaluation. 2 1st GEOSS M&E WG meeting outcomes Agreed on 1.the final draft of Terms of Reference for the M&E WG 2.The plan for delivery.
GEONETCast Initiative of GEO presented at the EC GEONETCast workshop 5 March 2006 GEO Secretariat.
Alan Edwards European Commission 5 th GEO Project Workshop London, UK 8-9 February 2011 * The views expressed in these slides may not in any circumstances.
WGISS-24, DLR, Oberpfaffenhofen, Germany, Oct 15-19, 2007 Slide # 1 “CL Key Climate Data from Satellite Systems” Ivan Petiteville, CEOS WGISS-24,
Slide 1 WGISS CEOS WGISS 21, Budapest 8-12 May 2006 Report on Report on CEOS Plenary (Nov. 2005) Ivan PETITEVILLE.
The CEOS Constellations Status and Way Forward SIT September 2006.
Slide 1 WGISS CEOS WGISS 22, Annapolis September 2006 Report on GEO Architecture & Data Committee (ADC) Report on GEO Architecture & Data Committee.
Integrated Earth Observations - Building the Bridges - IGOL Theme Team Meeting Sept 2004 Jeff Tschirley Chief, SDRN.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
WGClimate Work Plan for John Bates, Chair WGClimate 4th Working Group on Climate Meeting.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-5 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
© GEO Secretariat GEO WP & 2013 GEO priorities for CEOS Support GEO Secretariat CEOS SIT-28 NASA - Langley March 2013.
CEOS SIT-28 Introduction of the Agenda, Overall Objectives, and Essential Business Topics Hampton, Virginia, USA March 12-14, 2013.
GEO ADC Co-Chair meeting USGS, Reston, Dec Slide # 1 Virtual Constellations (DA-07-03) I.Petiteville, CEOS GEO ADC Co-Chairs Meeting, USGS,
6. Strategic Plan : Implementing GEOSS Validating the way forward: Review of feedback from Plenary.
ADC Meeting # 2, Seattle, July 2006 Slide # 1 Status of tasks AG-06-04, AR-06-09, CL-06-02, DA , DA Ivan Petiteville, CEOS Meeting #
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda item: 29 Adrian Simmons, Chair of the GCOS Steering Committee Update from the Global.
GEO Architecture and Data Committee Architecture Workshop Hosted by the European Commission At the Joint Research Centre February 2008 DRAFT.
GEOSS Task AR-09-01b Architecture Implementation Pilot Phase 6 (AIP-6) Bart De Lathouwer Open Geospatial Consortium (OGC) GEO-X Plenary, Geneva, Switzerland.
Anticipated Outcomes from CEOS WGs in 2010 Strategic Discussion on what the WGs should seek to achieve 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Slide: 1 CEOS SDCG-3 Meeting|Sydney, Australia| 7-9 February 2013 Space Data Coordination Group Land Surface Imaging Virtual Constellation Ake Rosenqvist,
Slide 1 WGISS CEOS WGISS 21, Budapest 8-12 May 2006 WGISS Contribution to GEO WGISS Contribution to GEO Ivan Petiteville.
Status of Current WGISS GEO Tasks and Actions Satoko Horiyama MIURA JAXA Mission Operation System Office of Space Mission Application Directorate (MOSS)
© GEO Secretariat Work Plan Guidance document 2 nd Capacity Building Committee Meeting, Brussels September 2006.
CEOS Publications & Outreach 1) Newsletter and Brochure 2) CEOS High Profile Doucment CEOS Plenary Doc. 29 Satoko Miura Pakorn Apapant 1 23 rd CEOS Plenary.
Overview of CEOS Virtual Constellations Andrew Mitchell NASA CEOS SIT Team / WGISS NASA ESRIN – Frascati, Italy September 20, 2013 GEOSS Vision and Architecture.
Water Strategy Implementation Study Team Report Chu Ishida JAXA SIT Workshop Agenda Item # CEOS Action / Work Plan Reference CEOS SIT Technical Workshop.
Overview of CEOS Actions in Support of GEO Work Plan Ivan Petiteville CEO ESA 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November2009.
CEOS Strategic Implementation Team (SIT) Report 2009 Accomplishments and Lessons Learned Agenda Item 9 Mary Kicza SIT Chair NOAA 1 The 23 rd.
ADC Meeting # 2, Seattle, July 2006 Slide # 1 Overview of ADC activities (Committee) Ivan Petiteville, CEOS Meeting # 2, Seattle, July 20-21, 2006.
WGISS and GEO Activities Kathy Fontaine NASA March 13, 2007 eGY Boulder, CO.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-4 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
ATT Contribution to GEO Archive Task Team WGISS – 22 Sep 11 – 15, 2006 Annapolis, USA.
Sanya, China, Feb 26, 08 WGCV/WGISS Joint MeetingSlide # 1 Ivan Petiteville, CEOS CEO Prioritizing GEO/CEOS Tasks/Resources for the Working Groups issue.
Update on WE Space-based GOS for Weather Status May 2008.
Calendar November 2009 – November 2010 Agenda item: 28 Presented by: Hilcéa Ferreira (INPE) 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009.
GEO ADC meeting, Washington DC, USA, Sep Slide # 1 “Future ADC meetings” Ivan Petiteville, CEOS GEO ADC Meeting, Washington DC, Sep
Page 1 WGISS Response to GEO/CEOS-SIT WGISS-22 Updates Ken McDonald WGISS/Vice-Chair.
WGISS-24 Preparatory meeting Issue 1.1 Sunday Sep. 14, 2007.
2010/11 SIT Chair Vision and Goals Makoto Kajii Japan Aerospace Exploration Agency 1 The 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009.
Committee on Earth Observation Satellites Chu Ishida, JAXA Plenary Agenda Item th CEOS Plenary Kyoto International Conference Center Kyoto, Japan.
Committee on Earth Observation Satellites CEO Team Plenary Agenda Item #13b 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6.
Land Surface Imaging VC: Terms of Reference Julio Dalge, P.G. Diwakar, John Faundeen INPE ISRO USGS CEOS SIT-28 Meeting Hampton, Virginia, USA March 12,
1 Status Report on GEO Task AR Advocate continuity for moderate-resolution satellite remote sensing, including support for a Landsat follow-on mission.
GEO ADC meeting, Tokyo, Japan, May 2007 Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Tokyo, Japan,
Information on a potential CEOS Sea Surface Temperature Virtual Constellation (SST-VC) Craig Donlon (ESA) Kenneth S. Casey (NOAA) CEOS Plenary, Rio De.
GEO 2016 Work Programme Giovanni Rum, GEO Secretariat GEO Work Programme Symposium Geneva, 2-4 May 2016.
Report from GEO Post-2015 WG and GEO Ministerial WG D. Brent Smith, NOAA CEOS Representative CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
WGISS 29, Bonn, Germany May 17-21, Pakorn Apaphant, Ph.D. May 17, 2010 WGISS 29, Bonn, Germany WGISS29 Purpose and Expected Outcomes.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Committee on Earth Observation Satellites CEO Team Plenary Agenda Item #4 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6 November.
© GEO Secretariat Work Plan Management Update GEO Work Plan Symposium 30 April – 2 May 2012.
Incoming Themes for 2017 Frank Kelly, USGS
CEOS Response to GEOSS Water Strategy
PROJECTS & APPLICATIONS SUBGROUP
AR Doug Nebert, POC-elect GEO ADC Co-Chairs Meeting,
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
Analysis ready data: definition document
Return to First Principles
LSI-VC Work Plan Updates
Committee on Earth Observation Satellites
Discussion Virtual Constellations
VC Title Goes Here Name (s), Organization, CEOS Affiliation
WG Title Goes Here Name (s), Organization, CEOS Affiliation
Virtual Constellation Leadership Rotation
Presentation transcript:

GEO ADC meeting, Washington DC, USA, Sep Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Washington DC, Sep. 2007

GEO ADC meeting, Washington DC, USA, Sep Slide # 2 Task Description Development of Virtual Constellations within CEOS framework in consultation with User Communities Objectives: –Improve the temporal, spatial and spectral coverage & resolution as well as data management and dissemination –Satisfy the requirements and objectives of the GEO SBAs

GEO ADC meeting, Washington DC, USA, Sep Slide # 3 Current 4 Virtual Constellations Precipitation Constellation: –strengthen international cooperation of space-based observations of precipitation, including realization of the GPM mission (AR-06-10) Land-Surface Imaging Constellation: –ensure the relevant synergy with High Resolution Multispectral Imager Continuity (AR-06-09); Ocean Surface Topography Constellation: –ensure continuity of Sea Level measurement in accordance with GCOS requirements (CL-06-02); Atmospheric Composition Constellation: –address many of the climate community’s needs for atmospheric observations (CL-06-02);

GEO ADC meeting, Washington DC, USA, Sep Slide # 4 Task particularities –Initial interaction with the User Community for the establishment of the user needs and definition of product requirements.  UIC should provide oversight of the establishment of user needs and definition of product requirements –Establishment of standards:  data interoperability (sensor inter-calibration, data formats, interoperable catalogs metadata,..), –Implementation of an interoperable system:  mission planning, missions definitions and operations, data archiving, access, data dissemination,… …

GEO ADC meeting, Washington DC, USA, Sep Slide # 5 Main Outputs & Deliverables Assessment of existing and planned systems and gap analysis As needed, consolidation of user needs and definition of product requirements for operational observations through communication with key user groups (involvement of UIC still to be arranged) Demonstration of the value of the projected Constellations for GEO Societal Benefit Areas Identification of contributions to comprehensive, sustained observing systems Establishment of CEOS Constellation standards across the GEO SBAs Demo for the GEO SummitDemo for the GEO Summit

GEO ADC meeting, Washington DC, USA, Sep Slide # 6 Calendar for 2007 Q1-07Start Q1-07Establish supporting guidance and consultation structures Q1-07Approve prototype proposals and develop work plan for each constellation study Q3-07Prototype study reports submitted. Constellation Process Paper finalized Q4-07Presentation of first achievements at GEO-IV and GEO Summit Q4-09End

GEO ADC meeting, Washington DC, USA, Sep Slide # 7 Task Status (1/3) Concept endorsed by CEOS Plenary (Nov. 2005) Currently, one of the 3 major CEOS activities DA Task proposed by CEOS for the GEO WP. –CEOS volunteer to be both Lead and Point of Contact

GEO ADC meeting, Washington DC, USA, Sep Slide # 8 Task Status (2/3) One System Engineering Team (SEO) led by NASA + 4 Constellations teams –Atmospheric Composition (NASA/ESA) –Precipitation (JAXA/NASA) –Ocean Surface Topography (NOAA/EUMETSAT) –Land Surface Imaging (USGS/ISRO)

GEO ADC meeting, Washington DC, USA, Sep Slide # 9 Task Status (3/3) Regular meetings and telecons –Several meetings of CEOS experts in 2006 and 2007 –One of the main topics at CEOS SIT (Jun and Sep. 2007) meetings and at next CEOS Plenary (Nov. 2007) –Teleconferences every 2 to 4 weeks between Constellation Team Leaders and SEO team CEOS Demo for the GEO Summit being defined –Constellations Visualisation DVD (USGS lead) –Climate pamphlet (USGS lead) –Latest CEOS Newsletter (JAXA lead) –Short pamphlet on the “CEOS role for GEOSS” incl. Virtual Constellations (NOAA lead. TBC)

GEO ADC meeting, Washington DC, USA, Sep Slide # 10 Way-Forward: document “Way-Forward on the Constellations framework document” is being drafted to improve the Constellations implementation process: –Includes: conclusion of the pilot phase, assessment of lessons learned, and way forward on existing studies and on new studies. –In addition, defines the work to be performed by the various parties involved in the VCs during the period Sep Jun (see next slides)

GEO ADC meeting, Washington DC, USA, Sep Slide # 11 Activities (Sep. 07 – Jun. 08) Reporting and review of Constellation Pilot Studies: –reports to be prepared for presentation to CEOS Plenary (Nov. 2007) and incorporation into CEOS inputs for the GEO Summit. Emphasis will be on space agency implementation actions required to realise the Constellations. Interim revision of Constellations Process Paper: –revised draft, including details of the role for the SEO (CEOS Plenary, Nov. 2007). Declaration of intent – by the relevant agencies ready to commit the required resources and implementation actions (CEOS Plenary, Nov. 2007). GEO Secretariat report on future GEOSS Space Segment implementation priorities (under discussion with GEO Secretariat): –presentation (SIT-21, Jun. 2008) –Identification of most promising candidates for future Constellation studies. Final version of Constellations Process Paper: –(target date SIT-21, Jun. 2008) Constellations Process review and new Study selection: –As defined in Constellations Process Paper (next slide)

GEO ADC meeting, Washington DC, USA, Sep Slide # 12 Constellation Process Paper Purpose: –incorporating the process and criteria for CEOS approval of new Constellation candidates, and reflecting outcomes of the GEOSS Space Segment implementation priorities – with proposals for new Constellation studies. Issue of final version (target date SIT-21, Jun. 2008)