Preparation of Module Assembly and Stringtest Haridas, Heinz, Marge One possibility for an assembly and test line? Preparation of a full string test –aim.

Slides:



Advertisements
Similar presentations
Present Assembly Status Three important milestones completed: – We tried the entire assembly procedure on real modules and it worked – The construction.
Advertisements

TEC X5 Setup (1) 1 Front + 1 Back petal, fully equipped (28 modules F.P modules B.P. + AOH + DOHM) Petal assembly IPN-Lyon (F.P.), RWTH-Aachen I.
STAR Pixel Detector Phase-1 testing. 22 Testing interrupted LBNL-IPHC 06/ LG Lena Weronika Szelezniak born on May 30, 2009 at 10:04 am weighing.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Test Setup for PHOBOS Hybrid/Module Testing at MIT Pradeep Sarin 31 July 98.
1 Research & Development on SOI Pixel Detector H. Niemiec, T. Klatka, M. Koziel, W. Kucewicz, S. Kuta, W. Machowski, M. Sapor, M. Szelezniak AGH – University.
May 14, 2015Pavel Řezníček, IPNP Charles University, Prague1 Tests of ATLAS strip detector modules: beam, source, G4 simulations.
Adding electronic noise and pedestals to the CALICE simulation LCWS 19 – 23 rd April Catherine Fry (working with D Bowerman) Imperial College London.
R Frey 9/15/20031 Si/W ECal Update Outline Progress on silicon and tungsten Progress on readout electronics EGS4 v Geant4 Ray Frey M. Breidenbach, D. Freytag,
October 2001Module Construction meeting IEKP - Universität Karlsruhe (TH) 1 Discussions on validation of irradiated MODULES W. de Boer, F. Hartmann.
Controls Review  Want to record a full configuration of the experiment at every possible “event”, including controls data.  Event trigger = accelerator.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Signal Processing in PHAT (P. Decowski, A. Olszewski, H. Pernegger, P. Sarin) Outline –Requirement for the signal calculation –Layout of the measurement.
Performance of SPIROC chips in SKIROC mode
1 TPC online  offline calibration November 2002.
Performance test of STS demonstrators Anton Lymanets 15 th CBM collaboration meeting, April 12 th, 2010.
NINO RO chip qualification with the laser test system Sakari and Fadmar.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
FCAL R&D in Minsk Group: Sensors and Electronics FCAL Collaboration MPI Munich October 17, 2006, Munich, Germany Presented by Igor Emeliantchik.
DE/dx measurement with Phobos Si-pad detectors - very first impressions (H.P Oct )
SCT Week -CERN- September 23, Defective ASIC’s A. Ciocio - LBNL.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Electronics Development Plan Goals and Plans for
Waclaw Karpinski General meeting CMS TRACKER SYSTEM TEST Outer Barrel –TOB Inner Barrel –TIB End cap –TEC TIB TOB TEC Different Geometries One.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
8 July 1999A. Peisert, N. Zamiatin1 Silicon Detectors Status Anna Peisert, Cern Nikolai Zamiatin, JINR Plan Design R&D results Specifications Status of.
29-Jun-09H. Henschel DESY (Zeuthen) 1 Frontend Interface Summarize.
1 G.Pessina, RICH Elec Upg, 11 April 2010 Analog Channels per chip4 to 8 Digital channel per chip4 to 8 Wire-bond pitch (input channels) Input capacitance.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
Michał Dwużnik, for the SCT collaboration
Controls for Particle ID/tracking in MICE 1.Physics and systematics 2.Controls types 3.Controls list 4.Needed for particle ID/tracking M. A. Cummings May.
SIAM M. Despeisse / 29 th January Toward a Gigatracker Front-end - Performance of the NINO LCO and HCO Matthieu Despeisse F. Osmic, S. Tiuraniemi,
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
ASIC Activities for the PANDA GSI Peter Wieczorek.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
2007 detectors study at CERN 1.SiPM time resolution 2.MAPD S60 3.Blue sensitive MAPD 4.New 16ch board 5.New HV.
July 7, 2008SLAC Annual Program ReviewPage 1 Silicon Tracking / Silicon Readout R&D Richard Partridge SLAC / Brown.
Low Momentum dE/dx Testbeam H.P. 7/24/98. Goals for Spectrometer are based on tracking and PID –Multiparticle correlation –production of particle species.
MuTr Chamber properties K.Shoji Kyoto Univ.. Measurement of MuTr raw signal Use oscilloscope & LabView Read 1 strip HV 1850V Gas mixture Ar:CO 2 :CF 4.
Assembly and Test of the Spectrometer (H.P. Apr. 16,1998) Status Module Assembly and Tests 1.) Status of completed hybrids and module 2.) Summary of the.
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
CBM 12 th Meeting, October 14-18, 2008, Dubna Present status of the first version of NIHAM TRD-FEE analogic CHIP Vasile Catanescu and Mihai Petrovici NIHAM.
Oscar Alonso – Future Linear Colliders Spanish Network 2015 – XII Meeting - Barcelona, January 2015 O. Alonso, J. Canals, M. López, A. Vilà, A. Herms.
ADC values Number of hits Silicon detectors1196  6.2 × 6.2 cm  4.2 × 6.2 cm  2.2 × 6.2 cm 2 52 sectors/modules896 ladders~100 r/o channels1.835.
Layout and test of silicon pad detectors for the PHOBOS experiment at RHIC Heinz Pernegger for the Phobos collaboration Massachusetts Institute of Technology.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
QA Tests Tests for each sensor Tests for each strip Tests for structures Process stability tests Irradiation tests Bonding & Module assembly Si detectors1272.
Analog Circuits Hiroyuki Murakami. CONTENTS Structure of analog circuits Development of wide linear range CSA system Problem of analog circuits How to.
Powering tests with the PP2 regulator Laura Gonella Physikalisches Institut Uni Bonn.
CEA DSM Irfu IDeF-X HD Imaging Detector Front-end for X-ray with High Dynamic range Alicja Michalowska, CEA-IRFU 1 Journées VLSI June 2010.
PIXEL 2000 P.Netchaeva INFN Genova 0 Results on 0.7% X0 thick Pixel Modules for the ATLAS Detector. INFN Genova: R.Beccherle, G.Darbo, G.Gagliardi, C.Gemme,
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
The design of fast analog channels for the readout of strip detectors in the inner layers of the SuperB SVT 1 INFN Sezione di Pavia I Pavia, Italy.
Setup for automated measurements (parametrization) of ASD2 chip
FCAL R&D towards a prototype of very compact calorimeter
Functional diagram of the ASD
Position Sensitive TCT Measurements with 3D-stc detectors
Application of VATAGP7 ASICs in the Silicon detectors for the central tracker (forward part) S. Khabarov, A. Makankin, N. Zamiatin, ,
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
R&D activity dedicated to the VFE of the Si-W Ecal
STATUS OF SKIROC and ECAL FE PCB
BESIII EMC electronics
Functional diagram of the ASD
Peter Kodyš, Zdeněk Doležal, Jan Brož,
Verify chip performance
Presentation transcript:

Preparation of Module Assembly and Stringtest Haridas, Heinz, Marge One possibility for an assembly and test line? Preparation of a full string test –aim of the tests –what are the parameters of DS, MS and Module Setup for String test and Laser test Next future Phobos Coll. April 97

One possibility for an assembly line Test of - PA chip - PL chip - DS DS assembl y DS function test DS pool MS assembly MS bonding Test of MS MS rework Sensor pool Module glueing Module bonding (fast) Module function test Module “long time” stability test Module calibration Module alignment measurement Module rework now soon

What do the tests aim for? Learn parameters of DS, MS and module –production (get selection critierias for DS+MS+sensors) –later operation (influence of Supply voltages, threshold,...) Module function and reliability –minimize effect of single component failure (eg. high leakage current on one sensor, defect DS on module) –test reliability of connections Stability –of noise, detector current, signal Signal response –signal calibration (gain, linearity) –dead channels

What are the parameters? tested on every componenton few components DS –dead channels –threshold –noise and signal gain MS –digital part and readout –voltages on DS Module –dead pads, noise, Idet, signal gain (-> Database) –optimal threshold DS –influence of supply voltages on signal gain, noise, linearity... MS – clock transmission –crosstalk, output signals Module –signal response and noise of different module types (correlation dE/dx vs Signal)

Test Setups in preparation - The Stringtest verify that the module works “Stringtest” Setup –now: for tests of DS –soon: test of MS –final: fast test of modules after glueing, rework Use of test pulses for –test function –noise measurement –gain & linearity Add a sensor to one DS Csource ENC vs load capacitance Q=Ct*V Ct V test gain & linearity in 0-5MIP range (e.g. Ct=1.0pF V=3.8mV ->Q= 1MIP PA16PL8Amod

Test Setups in preparation - The Lasertest understand the signal response Calibrate the signal response –measure each pad for 1, 2, 5, 10 MIP –find dead channels –create Database Stability test by source –noise –MIP signal = 28 hits/pad for 2 T1 = 84 hits/pad for 4 T5 –detector current 1064nm laser Sr90 source Idet Problems: absolute laser calibration, time stability, very precise X-Y stage support - optics, cooling, test time,...