G. Dissertori ETHZ CMS Electronics 2002 1 ECAL DCS : Plans for 2003 G. Dissertori ETHZ 27.11.2002.

Slides:



Advertisements
Similar presentations
ECAL Electronics, DCS Main DCS console (PVSS, JCOP Framework) Main DCS console (PVSS, JCOP Framework) HV (PVSS) LV (?) DSS (PVSS) Cooling (?) Laser (?)
Advertisements

JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
The Detector Control System – FERO related issues
1 DCS Planning L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM PROTOTYPE.
CBM slow controls CBM collaboration meeting DAQ work group CBM collaboration meeting DAQ work group Burkhard Kolb GSI1.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
18/05/2005Kamil Sedlak1 ATLAS Data Acquisition and Controls DAQ … data characterised by event and run number. DCS … data characterised by (valid for) some.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
Overview of the DCS Systems J. Varela, May 6th 2004 Electronics Week – DCS Review.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
The Detector Safety System for LHC Experiments Stefan Lüders ― CERN EP/SFT & IT/CO CHEP03 ― UC San Diego ― March 27 th, 2003.
PVSS SOAP Interface RCMS  DCS XDAQ  DCS (anyclient  PVSS) Peter Rosinsky, CERN PH/CMD CMS week 15-19/3/2004.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
MDT PS DCS for ATLAS Eleni Mountricha
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
ALICE DCS Meeting.- 05/02/2007 De Cataldo, Franco - INFN Bari - 1 ALICE dcsUI Version 3.0 -dcsUI v3.0 is ready and will be soon posted on the ACC site.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Responsibilities & Planning DCS WS L.Jirdén.
S. Zelepoukine CMS Electronics Status Report: ECAL Detector Control System S. Zelepoukine IHEP Protvino/ETHZ
Naming and Code Conventions for ALICE DCS (1st thoughts)
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
ECAL Prototype DCS system using PVSS Günther Dissertori (for Alison Lister) ETHZ
Introduction CMS database workshop 23 rd to 25 th of February 2004 Frank Glege.
Databases in CMS Conditions DB workshop 8 th /9 th December 2003 Frank Glege.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
Controls EN-ICE FSM for dummies (…w/ all my respects) 15 th Jan 09.
G. Dissertori ETH Zürich ECAL Cooling Review - DCS 1 ECAL Detector Control System G. Dissertori ECAL Cooling Review, Nov 4, 2004 Status report.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
S. ZelepoukineECAL DCS status, ECAL TCG 17.Jun ECAL DCS status: Sensors, probes and cabling (SM/Dee) S. Zelepoukine IHEP Protvino/ETHZ
G. Dissertori ETH Zürich ECAL - DCS 1 ECAL G. Dissertori DCS Coordination Board, Nov 10, 2004 Status report Trigger/DAQ project  DCS.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ
LAV thresholds requirements Paolo Valente. LAV answers for Valeri’s questions (old) 1.List of hardware to control (HV, LV, crates, temperatures, pressure,
The DCS Databases Peter Chochula. 31/05/2005Peter Chochula 2 Outline PVSS basics (boring topic but useful if one wants to understand the DCS data flow)
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
Tales and mysteries of PVSS in the land of ECAL Alison Lister ETHZ Alison Lister
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
G. Dissertori ETHZ CMS Electronics ECAL Detector Control System : Status Report G. Dissertori ETHZ
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
27SEP2008Calo Running and Operation Monday Meeting - Xvc1 ECS Xavier Vilasis-Cardona.
Detector Control System
PVSS an industrial tool for slow control
CMS-ECAL DCS Prototype
The LHCb Run Control System
TPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

G. Dissertori ETHZ CMS Electronics ECAL DCS : Plans for 2003 G. Dissertori ETHZ

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS  Description of the prototype slow control system  comments regarding each subsystem Contents

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS Main DCS console (PVSS, JCOP Framework) Main DCS console (PVSS, JCOP Framework) HV (PVSS) LV (?) DSS (PVSS) Cooling (?) Laser (?) Temp/Humid. Monit. (PVSS) DAQ DB/ Archive DIM, XDAQ/PVSS DIM ?

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS HVLVDSSCooling TEMP. + HUMID. Monit. ALARMS LASER DAQ Main DCS Console DB/ARCH

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS  had a meeting recently (HV, LV, TSS, F. Glege)  for mid-2003 (SM0) : first prototype of DCS software system in PVSS  should include HV, LV, Temp.Monit., TSS, Cooling?, Framework with FSM, Partitioning, communication with XDAQ and ECAL DAQ?  test of this prototype during 2003  beg. 2004: production setup for the SM calibration at H4  during 2004, probably all resources needed for calibration  beg. 2005: first tests of a setup for full ECAL (maybe start with reduced size)  may have to find a location to do such a test  from mid 2005 on : install equipment and start testing of the full system  beg : full system ready Planning: Software

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS  up to end-2003 : subprojects software covered by responsible groups, framework covered, but I guess with substantial help/input needed (from Frank Glege, I guess)  end : have to shift manpower (1 person) to framework, probably from TSS and Temp. monitoring  in : would like to get help for the test and integration of full system, also for the interfacing with the DAQ : 1 person (0.5 FTE ?) Planning: Manpower

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS  we urge all subitems of DCS to look into PVSS (or a possible interface such as DIM) as soon as possible  when working with PVSS, follow rules when defining data points  please communicate, such as alarm types etc Wishes/ Request / AOB

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS HV issues they use CAEN PS. Supported by JCOP. Rome group will develop the HV PVSS application prototype should be ready for SM0 they will have Labview as backup

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS LV issues exact system not yet defined ( in terms of hardware ) planned to use DCUs (CCUs) to control the LVRs therefore: will use XDAQ therefore : will need PVSS - XDAQ interface hopefully a very first prototype ready for SM0

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS DSS issues a first prototype already used in 2002 (M0’) the Belgrade group will build the application should be ready for SM0 need good communication with DAQ, in order to get information from sensors integrated in PCBs needs communication with cooling sensors: as close as possible to final solution (2 sensors per module)

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS Temp./Humid. Monit. issues a first prototype already used in 2002 (M0’) the Protvino group (together with ETHZ) will build the application should be ready for SM0 needs communication with cooling (feedback ?) sensors : as close as possible to final solution : 10 temp.sensors per supermodule (4 on grid, 4 on screen, 2 on IN/OUT pipes). 1 humidity sensor per module

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS Cooling issues need to start discussion now I think at the moment they use Labview

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS Laser issues Need to start discussion now I assume they will have their own software (not PVSS) but at least we need software communication with the Laser system in order to know hardware status

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS Communication with DAQ first tests for communication ECAL PVSS - XDAQ first half of 2003 so hopefully ready for SM0 As long as “J.Fay/J. Bourotte DAQ” is the run controller, have to communicate : best solution: DIM the DIM name server would run on the central DCS station APIs exist for different platforms in PVSS (JCOP framework) DIM is integrated (as API manager, built in via particular definition of data points) DIM could also be a candidate for other communications (eg. with LASER)

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS Database/Archiving Probably will use PVSS archiving tools what other kinds of databases will be used by others?

G. Dissertori ETHZ CMS Electronics ECAL Electronics, DCS FRAMEWORK issues A. Lister (ETHZ) just started to work on it hopefully first prototype ready for SM0 with FSM, partitioning, alarm handling, XDAQ interface... Note : planned that Alison leaves for CDF end 2003 (for some time). See man power issues....