1 ATF2 Q BPM electronics Specification (Y. Honda, 02.2006) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.

Slides:



Advertisements
Similar presentations
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
Advertisements

P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
Preliminary Results from HOM Measurements at the Tesla Test Facility (SLAC) Josef Frisch, Kirsten Hacker, Linda Hendrickson, Justin May, Douglas McCormick,
Bob Lill Undulator Systems – Cavity BPM October 12, 2006 Undulator Cavity BPM Status.
Bob Lill Undulator Cavity BPM System April 16, 2007 Undulator Cavity BPM Status.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
Installation and checkout of QBPM system Hardware to be installed –Install hardware in racks –Install CPU /SIS digitizers/VMIC 3122 analog digitizers/Digital.
WP9 : Cavity BPM spectrometry Royal Holloway S. Boogert & G. Boorman University College London D. Attree, A. Lyapin, B. Maiheu & M. Wing Cambridge University.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
An RF & High-Speed Acquisition Systems for High-Gradient Tests at CLIC Test Facility Raquel Fandos.
Marc Ross Saturday, June 5, 2004 nanometer BPM status and plans.
QBPM System Installation Systems –Rack mount chassis –LO and CAL RF cable plant ( need 714Mhz from eels bedroom) –Down mix boxes –DC power cable plant.
Jan, 2001CMS Tracker Electronics1 Hybrid stability studies Multi – chip hybrid stability problem when more then ~ 2 chips powered up -> common mode oscillation.
Velleman Oscilloscope: Windows 7 by Mr. David Fritz.
FONT Hardware Processing electronics and current beam tests Stephen Molloy Queen Mary, University of London.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
E.Guschin (INR) 21 November 2003Integration EDR PRS/SPD static envelop, assembly and installation Detector layout Static envelop along the beam Detector.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
IP BPM’s for ATF2 Vladimir Vogel KEK May30, 2005 Third Mini-Workshop on Nano Project at ATF.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
B.Satyanarayana Department of High Energy Physics Tata Institute of Fundamental Research Homi Bhabha Road, Colaba, Mumbai,
1 ATF 2 Nanobpm (Q BPM) Electronics. Mark Slater: Cambridge Yury Kolomensky, Toyoko Orimoto: UCB Stewart Boogert, Steve Malton, Alexi Liapine: UCL Mike.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Low-Q IP BPM Y. I. Kim *, A. Heo, E-S. Kim (KNU) S. T. Boogert (JAI) D. M. McCormick, J. May, J. Nelson, T. Smith, G. R. White (SLAC) Y. Honda, N. Terunuma,
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
Optical Calibration Updates Presentation for SK-UK Meeting 2016 Neil McCauley, Lauren Anthony, Adrian Pritchard, Joachim Rose 1.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
MO/LO Performance Summary and Maintenance Plans Tomasz Plawski Jefferson Lab OPS Stay Retreat, July 15th, 2015.
High Voltage Power Supply for RPC Suvendu Nath Bose, Satyajit Saha, Sudeb Bhattacharya, Saha Institute of Nuclear Physics, Kolkata,, Description Presently.
S-band processing electronics R. Ainsworth (summer student), S. Boogert, G. Boorman (Royal Holloway) A. Lyapine (University College London) Weekly ATF2.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Performance of B-sensor types EUDET NIKHEF VS F. Bergsma 12/9/2007.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
Superfast BPM Processor Scheme Stephen Molloy, QMUL Nano-Project Mini-Workshop at ATF.
PADME Front-End Electronics
Cosmic Microwave Technology, Inc.
Glen White, SLAC Jan th ATF2 Project Meeting, KEK
FGM CDR FGM Electronics (FGE) Ronald Kroth MAGSON GmbH Berlin Germany.
Calorimeter Mu2e Development electronics Front-end Review
ATF/TTF Instrumentation Nov. 27, 2006 Last report: Oct. 2
BCTW calibration status and future
ATF nanoBPM system - nanoGrid ATF2 Movers TTF HOM – dipole / monopole
8-Pack LLRF Status & Schedule
Intra-Pulse Beam-Beam Scans at the NLC IP
Low Level RF Status Outline LLRF controls system overview
NanoBPM Status and Multibunch Mark Slater, Cambridge University
An Optimal Procedure for RF Conditionning at the FREIA Laboratory
Low Level RF Status Outline LLRF controls system overview
Status of TTF HOM Project Aug 9, 2005
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
SuperB Linac VME Beam Position Monitor
Undulator Cavity BPM Status
Low Level RF Status Outline Overview showing hardware instances
Breakout Session SC3 – Undulator
Presentation transcript:

1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics group (SLAC), NanoBPM collaboration, and Y. Honda (KEK)

2 Specifications

3

4 New board layout Improved coupler and packaging More robust power and sensor connectors Design

5 Local configuration System design

6 Electronics mounting The structure of the ATF2 magnet system will be a magnet, position adjustable support, mover and concrete base from top to bottom. You can mount the BPM electronics boxes on the side face of the concrete bases. But their height will be about 580 mm. So you had better place your boxes so that their dimension might be 300 mm vertically and 700 mm horizontally. I can install iron plates, which have several screw holes in order to mount your boxes, on the side face of the concrete bases. Design

7 Electronics package Thermal tests done. Temperature rise of about 10 degrees in the closed box. Design

8 Calibration The purpose of this calibration system is to keep track of gain variations Typical variations are caused by temperature changes On-board calibration signal coupler (non- directional) On-board precision cal and LO power meter This type of calibration procedure has not been tested.

9 With a single tone calibration (away from the cavity resonance), the power meter will provide a few tenths of a percent calibration stability. The calculated gain stability vs. temperature of the ATF2 board is 0.02dB/C, or an amplitude change of 0.25% / C. The temperature variation of the attenuation of the limiter is not known or specified. We could test this with a connnectorized limiter. The cable variation is calculated at approximately 0.06%/C, if good cable is used. The power meter chip has a variation of 0.16%/C, slightly better than the calculated stability of the board. The power supplies are well regulated on the board, so input voltage variations are probably not important. However, if the input voltage varies, the power dissipated in the primary regulator will change, and the board temperature will change. It might be worth running a separate power cable to each board (in a multi-conductor bundle) so that changes in the number of operating boards doesn’t change the board temperatures. Since we believe (but need to measure) the board temperature variation is 0.25%/C, and the power meter variation is 0.16%/C (all numbers calculated - have not done measurements), it is not clear we can improve on the stability with calibration. Calibration

10 RECOMMENDATIONS 1: Use non-directional couplers. Include a temperature monitoring thermistor connected to the diagnostic cable. Include a pad for a thermistor in parallel with the gain resistor on the output amplifiers. Test board temperature stability. 1a. If the 2 channels match well, install a thermistor set to cancel the first order variation with temperature. Expect ~0.1%/C stability. 1b. If channels do not track, expect ~0.25%/C stability. Calibration

11 The default scheme would be to have a calibration synthesizer operate with a tone which we blank off for a few microseconds around beam time. The standard SIS data acquisition will then see some tone, and the cavity signal. Two operation modes: 1: system calibration: This is used to find cavity frequencies, couplings to X,Y, etc. Optionally we could also do a tone sweep of the calibration synthesizer to map out the cavity resonance and possibly (if we are clever enough), the cable attenuation. 2: Operation mode: DDC is performed in the VME crate controller using the precalculated coefficients. The I and Q amplitudes are multiplied by previously calculated matricies to get X,Y. These X,Y are made available to the EPICs server. The I and Q of the calibration tone is also made available for history buffering. We will need beam studies to determine if we want to adjust the calculated gain based on the measured calibration tone, or just use it as a check. The crate controller should be fast enough to do DDC even for multi-bunch beams in real time. Operation

12 Lab Tests

13 Lab Tests

14 Beam Tests of ATF2 electronics (Y. Honda)

15 Beam Tests

16 Beam Tests

17 Beam Tests

18 Beam Tests

19 Beam Tests

20 Beam Tests

21 Beam Tests

22 Beam Tests

23 Schedule

24 Schedule

25 Remaining: Bench tests of coupling Bench tests of stability, lifetime and temperature response Beam test analysis Saturation tests and matching with digitizer Calibration tests System design