Shrinkage Forum 22 January 2014 Roy Malin. 2 2014/15 Shrinkage Proposals  Initial proposals issued December 2013  Proposed Shrinkage Quantities calculated.

Slides:



Advertisements
Similar presentations
AUG Query Responses 19th December Overview AUGE Guidelines require AUGE to report outcome of Query Process to UNCC UNCC to consider AUGE recommendations.
Advertisements

EU Developments Transmission Workgroup 6th October 2011.
Project Nexus Next Steps Xoserve/Large GT View – 6 December 2011.
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
New Cost Estimate Template Issued: December 11, 2014 Effective: January 5, 2015.
June 2003 Structure of Electricity Distribution Charges Next Steps Martin Crouch Director, Distribution.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Shrinkage Forum Monday 27 June 2011, 31 Homer Road.
Odour Code of Practice – An Update Martin Key Presentation to Scottish Noise and Nuisance Conference, 6 October 2006.
Shrinkage Forecasts - Factors David Simpson September 2014.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
A layman’s guide to the structure of LDZ gas charges 27 July 2009 Please note – in the interests of clarity and accessibility, simplifications have been.
MP0131: Meter Error Notifications Liz Spierling – July 4 th 2007.
LDZ Shrinkage - a National Grid Overview Chris Warner Mod 0194/RG 0208 June 2008.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
OPNs & LDZ Demand Forecasts Chris Shanley & Nick Reeves.
Shrinkage Forum 04 June 2013 Roy Malin. 2 Best Practice - Areas of Inconsistency AreaBackgroundAction Definition of All-PE systems Used to identify networks.
Transmission Planning Code – Design Margin Update Transmission Workstream, 4 th February 2010.
UP presentation Transmission wstream Jan 08 1 user pays services implementation January 2008.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
LDZ Shrinkage Forum Jonathan Dennett Elexon 22 nd June 2006.
DN Interruption Reform Distribution Workstream 23 rd July 2009.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Shrinkage Forum Tuesday 8 March 2011, 31 Homer Road.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Allocation of Unidentified Gas Statement 2013/14 6 th February 2012.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
DNPC08 Review of Standard LDZ System Charges 6 September 2010.
IEA Bioenergy Conference 2015 UK Biomethane Market Update 50 Plants Injecting Gas by End th October 2015 John Baldwin Managing Director CNG.
RbD Subgroup Dean Johnson 8 th April 2008 RbD Subgroup Dean Johnson 8 th April 2008.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Leakage Model Development Proposals – Shrinkage Forum Discussion Wednesday 14 December 2011.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Allocation of Unidentified Gas Statement 2014/15 15 th May 2013.
Managing the Costs of New Developments Initial Proposals on Transmission System Operator Internal Costs from 1 st April 2007 Update from National Grid.
Exercise Neptune Findings Gas Customer Forum 29 th January 2007 Jacky Carroll Network Manager Emergency Planning Gas National Control Centre.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
DNPC05 Consultation Paper Balance of Revenue Recovery between LDZ System Charges and Customer Charges Steve Armstrong 27 th July 2009.
Accompanying Narrative
Transitional Exit Capacity Proposals -Update
Annual Review of Shrinkage and Leakage Model
Modification Proposal 0283 Update
EU Implementation Programme
Code Governance Review UNC Modification Proposals
SO Incentives Consultation
Allocation of Unidentified Gas Statement - Update
Mod 0621 Amendments to Gas Transmission Charging Regime
Harmonisation Working Group Update on Harmonisation Project
UIG Task Force Progress Report
CSEP NExA Update Marie Clark ScottishPower 28th September 2006.
Rebecca Knight Mod 644 UIG Analysis.
SGN’s 2005/06 Shrinkage Assessment and Adjustment
Leakage Model Modification Update
Modification th July 2008.
Exit Capacity Substitution and Revision
Joint Office Presentation for Modification 0678
Mod 0621 Amendments to Gas Transmission Charging Regime
AUG Query Responses 21st November 2013.
Leakage Model Modification Update
Generic Revenue Driver Methodology
MP0131: Meter Error Notifications
DN Interruption Reform
Strategic Coordination Group 2007 Reporting Guidance on Monitoring
Commercial Arrangements For Gas Quality Service – Introduction
Pricing and Margins Manager National Grid Distribution
Gas Customer Forum 28 July 2008
Data Enhancement Project - Update
Change Management Committee
Presentation transcript:

Shrinkage Forum 22 January 2014 Roy Malin

2 2014/15 Shrinkage Proposals  Initial proposals issued December 2013  Proposed Shrinkage Quantities calculated using two versions of the leakage model:  V1.3 Original Model  V1.4 Includes LP Service Modification  As agreed at the 10 December 2012 Shrinkage Forum, National Grid proposed and applied the revised model for 2013/14 in anticipation of the model change being approved  Still expect model change to be approved  Need to agree the leakage model basis for 2014/15 proposals

3 2014/15 Shrinkage Proposals (GWh) LDZUsing Leakage Model v1.3*Using Leakage Model v1.4*Difference EA EM NT NW WM NE * NO SC * SE SO SW234.7 NG estimate based on data previously provided by WWU. Values to be confirmed 13.4 WN54.7 WS124.4 * As published in initial proposalsTotal and estimated value116£2.6m

4 LP Service Modification  Consultation issued August 2013  Report on consultation sent to Ofgem for approval – October 2013  Concerns  NGN and WWU data not independently verified  Variance of impact between LDZS  NGN and WWU will be commissioning an independent review of their leakage models and proposed baseline changes  Variance analysis

5 LP Service Modification Variance Analysis (1) 

LP Service Modification Variance Analysis (2)  Published impact is the difference between v1.3 and v1.4 leakage models using 2010/11 data  Necessary to normalise for:  Length of Metallic Main  Average System Pressure  Used an LDZ average  Actual impact will depend on the combination of the individual low pressure networks’ ASP and metallic mains lengths  Calorific Value 6

7 LP Service Modification Variance Analysis (3)

8 AGI Venting IFI Update  Currently, National Grid procure 84GWh for AGI Venting  We were expecting a venting value of approximately 130GWh  Report Received January 2014  National Grid venting from pneumatic control equipment  17+/-5.1 GWh  Concerns over robustness of site/equipment inventory  Intention to commission DNV GL carryout a site inventory of National Grid’s pneumatic control equipment

9 Review of SLM Review Consultations  Consultations issued by each DN November/December 2013  Two responses – British Gas and Scottish Power  Intend to issue a Joint DN Report on the consultation  Subject to agreement, future SLM Reviews and Consultations to be a joint DN process  Agree with stakeholders and Ofgem

10 Outcome of SLM Review Consultations  Issues/areas for development  The level of detail included within the SLM Review;  The requirement to review the low pressure leakage rates, and in particular whether this would be cost-effective;  Continued development of Theft of Gas detection and resolution;  Further clarification of the Own Use Gas estimation;  How the industry deals with CSEP Shrinkage;  The level of detail provided regarding the ‘activity factors’ driving the shrinkage estimation, e.g. mains replacement and pressure management.