CS 8532: Adv. Software Eng. – Spring 2007 Dr. Hisham Haddad Class Project – Software Development Plan Class will start momentarily. Please Stand By … CS.

Slides:



Advertisements
Similar presentations
Managing Project Scheduling. What is Project Scheduling? The process of: – defining project activities – determining their sequence – estimating their.
Advertisements

Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
TITLE OF PROJECT PROPOSAL NUMBER Principal Investigator PI’s Organization ESTCP Selection Meeting DATE.
1 Software Requirement Analysis Deployment Package for the Basic Profile Version 0.1, January 11th 2008.
Configuration Management Backup/Recovery Project Review.
Team READ THIS SLIDE CAREFULLY Alpha Demonstrations will be given by each team at our all-hands meeting on the dates listed at All-Hands Meeting Agendas.All-Hands.
MSc project specification Unit PJ45P Dr Jim Briggs
Avra Software CMPUT Process Quality and Software Assessment Case Study - slide#1©P. Sorenson and Amr Kamel Assessment Plan for Assessment Plan for.
Your Presentation Title Names of Team members Advisor name EE496A Midterm Presentation Fall, 2006.
Business Area Analysis Focus: Domain View (selected business area) Goals: –Isolate functions and procedures that allow the area to meet its goals –Define.
Chapter 3: The Project Management Process Groups
Chapter 5: Project Scope Management
SDLC and alternative methodologies 1/14/2015 © Abdou Illia MIS Spring 2015.
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
Project Title (as descriptive as possible) Group Members CPE Computer Engineering Design I Electrical and Computer Engineering.
Project Management – The Project Charter
Project Management Lecture 5+6 MS Saba Sahar.
CS 8532: Adv. Software Eng. – Spring 2007 Dr. Hisham Haddad Tuesday Class will start momentarily. Please Stand By … CS 8532: Advanced Software.
© 2007 Pearson Education, Inc. Publishing as Pearson Addison-Wesley 1 Context of Software Product Design.
Module 8: Risk Management, Monitoring and Project Control We would like to acknowledge the support of the Project Management Institute and the International.
CSIS 4850: Senior Project Fall 2008 Scope Statement and Project Plan.
CS 4850/01: CS Senior Project Fall 2014 Overview of Software Requirements and OO Analysis.
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
Demystifying the Business Analysis Body of Knowledge Central Iowa IIBA Chapter December 7, 2005.
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
CS 3610: Software Engineering – Spring 2009 Dr. Hisham Haddad – CSIS Dept. Class Project OO Design Document Here is what you need to do for your class.
IT 499 Bachelor Capstone Week 8. Adgenda Administrative Review UNIT Seven UNIT Eight Project UNIT Nine Preview Project Status Summary.
CS 8532: Adv. Software Eng. – Spring 2009 Dr. Hisham Haddad Chapter 5 CS 8532: Advanced Software Engineering Dr. Hisham Haddad Class will start momentarily.
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
CS Tutorial 4 Frid. Oct 16 th, 2009 Prototype Tutorial.
Software Requirements (Advanced Topics) “Walking on water and developing software from a specification are easy if both are frozen.” --Edward V Berard.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Copyright 2009  Describe the five project management (PM) process groups, the typical level of activity for each, and the interactions among them  Understand.
Strong9 Consulting Services, LLC 1 PMI - SVC I-80 Breakfast Roundtable Monthly Meeting Thursday, October 12, :00 am – 9:00 am.
SacProNet An Overview of Project Management Techniques.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
CS 3610: Software Engineering – Fall 2009 Dr. Hisham Haddad – CSIS Dept. Chapter 2 The Software Process Discussion of the Software Process: Process Framework,
Lecture 7: Requirements Engineering
Project Plan. Project Plan Components Project Overview – Description and Strategy Business Case Summary Key Deliverables and Scope Critical Success Factors.
Facility Integration Project Update Chelsea Smith – Project Manager Lake Shore Solutions.
CS 3610: Software Engineering – Fall 2009 Dr. Hisham Haddad – CSIS Dept. Chapter 6 System Engineering Overview of System Engineering.
CS 4850: Senior Project - Spring 2009 CS 4850: Senior Project Spring 2009 Scope Statement and Project Plan.
CS 4850/01: CS Senior Project Fall 2014 Scope Statement and Project Plan.
CS 3610: Software Engineering – Fall 2009 Dr. Hisham Haddad – CSIS Dept. Class Project OO Design Document Here is what you need to do for your class project.
CS 4850: Senior Project Fall 2014 Object-Oriented Design.
Lecture 2_2 The Project Management Process J. S. Chou, P.E., Ph.D. Assistant Professor.
CS 4850: Senior Project – Spring 2009 CS 4850: Senior Project Spring 2009 Overview of Software Requirements and OO Analysis.
CONTENTS OF THE SRS REPORT. Software Requirements Specification (SRS) template The SRS document describes recommended approaches for the specification.
Project Management Theory. Planning a Project Identify the problems and inefficiency of system. – Design brief Design brief: A statement that contains.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 4 Slide 1 Slide 1 Use Case Packets.
Project Scope Management 1. 2 Learning Objectives Understand the elements that make good project scope management important. Explain the scope planning.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
CSIS 4850: CS Senior Project – Spring 2009 CSIS 4850: Senior Project Spring 2009 Object-Oriented Design.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
2/27/2016 IENG 471 Facilities Planning 1 IENG 464 – Conceptual Design Project Report & Presentation Requirements.
Lab 3 – SRS Review & Implementation Planning. Milestones 1.Web Page Design & Implementation 2.Revise communication protocol 3.Develop a test tool for.
CS 8532: Adv. Software Eng. – Spring 2009 Dr. Hisham Haddad Chapter 7 CS 8532: Advanced Software Engineering Dr. Hisham Haddad Class will start momentarily.
* Project Name Progress Report 2 Date Presented by:
CS 8532: Adv. Software Eng. – Spring 2007 Dr. Hisham Haddad Discussion of Course Syllabus Class will start momentarily. Please Stand By … CS 8532: Advanced.
CS 8532: Adv. Software Eng. – Spring 2009 Dr. Hisham Haddad , Monday Class will start momentarily. Please Stand By … CS 8532: Advanced Software.
 System Requirement Specification and System Planning.
Chapter 3: The Project Management Process Groups: A Case Study
Software Project Management
Class will start momentarily. Please Stand By …
SWEN 5230 Your Project Title
CS 8532: Advanced Software Engineering
CS 8532: Advanced Software Engineering
Studio day : Monday February 4
Joint Application Development (JAD)
Project Overview.
Presentation transcript:

CS 8532: Adv. Software Eng. – Spring 2007 Dr. Hisham Haddad Class Project – Software Development Plan Class will start momentarily. Please Stand By … CS 8532: Advanced Software Engineering Dr. Hisham Haddad

CS 8532: Adv. Software Eng. – Spring 2007 Dr. Hisham Haddad Class Project Software Development Plan

CS 8532: Adv. Software Eng. – Spring 2007 Dr. Hisham Haddad Your Class Project Each of you will play various roles throughout the development of the class project. If you project is sponsored or supervised by a client (customer), please work with your project supervisor/client on a development plan outlining, among other, the project scope and project plan as per the posted Development Plan template. Assume the role of the Analysis Team to analyze gathered customer requirements and derive the Software Requirements Specifications (SRS). Assume the role of the Design Team to derive Software Design Document (SDD). After the class, you may assume the role of the Development Team to implement the system.

CS 8532: Adv. Software Eng. – Spring 2007 Dr. Hisham Haddad What is Scope Statement? It is a relatively brief and precise description of the system to be developed. It is derived from customer meeting documents and/or system usage scenarios. Among others, it includes the followings information: - Need/justification/background statement - Input and output data - Basic functionality of the system (obvious requirements) - Constraints and limitations that may be applicable to data and functions - Deliverables and Project Plan (Gantt chart and timetable of milestones and deliverables) - Others… (see posted article “Writing a Scope Statement”)

CS 8532: Adv. Software Eng. – Spring 2007 Dr. Hisham Haddad Scope Statement and the Project Plan - 1 Examples of scope statement are posted. Some are very brief while others are too elaborate. Your scope statement should reasonably and adequately describe your project system. Some key point to keep in mind: -The problem statement describing the nature of the project should be clearly stated in the document. The solution requirements should be clearly stated. -Any assumptions about the problem should be clearly stated. Any limitations of the analysis, design, and implementation should be clearly stated.

CS 8532: Adv. Software Eng. – Spring 2007 Dr. Hisham Haddad Scope Statement and the Project Plan - 2 -The documentation should be reviewed carefully before submission. Correct grammar, completeness, and precise description are expected. Relevant references should be included and the over all documentation should be sufficiently complete such that the project can be continued by another person/team.

CS 8532: Adv. Software Eng. – Spring 2007 Dr. Hisham Haddad Software Develop Plan The Software Development Plan is our first milestone. A revised (shortened) RUB template is posted on the Project page. Full version is also posted if you choose to use it. Other templates are posted on this site: Software Development Plan is due Friday 2/2/2007, by 5:00pm Please your SDP to