SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project
SFOBB East Span Seismic Safety Project WELCOME
SFOBB East Span Seismic Safety Project SAS Constructability Workshop Self-Anchored Suspension Span consists of a 160-meter single steel tower with a main cable and inclined suspenders supporting two steel orthotropic decks of a 385-meter main span and a 180-meter back span.
SFOBB East Span Seismic Safety Project SAS Constructability Workshop The workshop will concentrate on identification of constructability issues for the tower and orthotropic boxes.
SFOBB East Span Seismic Safety Project Participants Potential construction joint ventures or contractors that plan to bid SAS/YBI contract (Contractors), steel fabrication firms that plan to submit estimates to fabricate steel tower and/or main and back orthotropic boxes (Fabricators) steel plate producers (Suppliers) and Caltrans Project Manager
SFOBB East Span Seismic Safety Project Purpose is to develop a Sense of the capacity of the domestic steel market to produce plate steel for orthotropic boxes and tower sense of fabricators ability to fabricate and transport pieces sense of prime contractors ability to bid the project due to the above issues
SFOBB East Span Seismic Safety Project Tools power point presentations March 12 handout discussion items meeting bullets
SFOBB East Span Seismic Safety Project Agenda
SFOBB East Span Seismic Safety Project Keynote speaker Jonathan Neuberger, economist The Economic Outlook and it’s potential to impact Contract SAS/YBI
SFOBB East Span Seismic Safety Project Ground rules No decisions to be made only discussions to be had speakers keep to their time dialogue follow decorum to create atmosphere of respect