Daily to Seasonal Operational Flood Forecasting Tom Hopson, NCAR and ADPC Peter Webster, CFAB and Georgia Tech A. R. Subbiah, ADPC.

Slides:



Advertisements
Similar presentations
ECMWF long range forecast systems
Advertisements

Empirical Analysis and Statistical Modeling of Errors in Satellite Precipitation Sensors Yudong Tian, Ling Tang, Robert Adler, and Xin Lin University of.
Calibration of GOES-R ABI cloud products and TRMM/GPM observations to ground-based radar rainfall estimates for the MRMS system – Status and future plans.
TRMM Tropical Rainfall Measurement (Mission). Why TRMM? n Tropical Rainfall Measuring Mission (TRMM) is a joint US-Japan study initiated in 1997 to study.
Operational Seasonal Forecasting for Bangladesh: Application of quantile-to-quantile mapping Tom Hopson Peter Webster Hai-Ru Chang Climate Forecast Applications.
Validation of the Ensemble Tropical Rainfall Potential (eTRaP) for Landfalling Tropical Cyclones Elizabeth E. Ebert Centre for Australian Weather and Climate.
Dennis P. Lettenmaier Alan F. Hamlet JISAO Center for Science in the Earth System Climate Impacts Group and Department of Civil and Environmental Engineering.
Effects of Fluvial Morphology on Remote Sensing Measurements of Discharge American Geophysical Union, Fall Meeting, 2010 Session on “H66, The Remote Sensing.
Ensemble Post-Processing and it’s Potential Benefits for the Operational Forecaster Michael Erickson and Brian A. Colle School of Marine and Atmospheric.
Advanced Study Program
Mohammad Khaled Akhtar & Slobodan P. Simonovic
Flood monitoring for ungauged rivers - Across the globe Beatriz Revilla Romero 1, Jutta Thielen 1, Peter Salamon 1 and Tom de Groeve 1, Damien Raynaud.
Flood Forecasting for Bangladesh Tom Hopson NCAR Journalism Fellowship June 14-18, 2010.
For the lack of ground data the verification of the TRMM performance could not be checked for the entire catchments, however it has been tested over Bangladesh.
1 GOES-R AWG Hydrology Algorithm Team: Rainfall Probability June 14, 2011 Presented By: Bob Kuligowski NOAA/NESDIS/STAR.
The Evaluation of a Passive Microwave-Based Satellite Rainfall Estimation Algorithm with an IR-Based Algorithm at Short time Scales Robert Joyce RS Information.
Water availability assessment in data scarce catchments: Case Study of Northern Thailand Supattra Visessri 1st Year PhD Student, Environmental and Water.
ESA DA Projects Progress Meeting 2University of Reading Advanced Data Assimilation Methods WP2.1 Perform (ensemble) experiments to quantify model errors.
The University of Mississippi Geoinformatics Center NASA MRC RPC Review Meeting: April 2008 Integration of NASA Global Precipitation Measurement.
Rank Histograms – measuring the reliability of an ensemble forecast You cannot verify an ensemble forecast with a single.
Operational Flood Forecasting for Bangladesh: Tom Hopson, RAL-NCAR Peter Webster, Georgia Tech A. R. Subbiah and R. Selvaraju, Asian Disaster Preparedness.
Operational Flood Forecasting for Bangladesh: Tom Hopson, NCAR Peter Webster, GT A. R. Subbiah and R. Selvaraju, ADPC Climate Forecast Applications for.
Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson.
Streamflow Predictability Tom Hopson. Conduct Idealized Predictability Experiments Document relative importance of uncertainties in basin initial conditions.
Center for Hydrometeorology and Remote Sensing, University of California, Irvine Basin Scale Precipitation Data Merging Using Markov Chain Monte Carlo.
Precipitation Retrievals Over Land Using SSMIS Nai-Yu Wang 1 and Ralph R. Ferraro 2 1 University of Maryland/ESSIC/CICS 2 NOAA/NESDIS/STAR.
National Weather Service Application of CFS Forecasts in NWS Hydrologic Ensemble Prediction John Schaake Office of Hydrologic Development NOAA National.
Model dependence and an idea for post- processing multi-model ensembles Craig H. Bishop Naval Research Laboratory, Monterey, CA, USA Gab Abramowitz Climate.
All about DATASETS Description and Algorithms Description and Algorithms Source Source Spatial and temporal Resolutions Spatial and temporal Resolutions.
AN ENHANCED SST COMPOSITE FOR WEATHER FORECASTING AND REGIONAL CLIMATE STUDIES Gary Jedlovec 1, Jorge Vazquez 2, and Ed Armstrong 2 1NASA/MSFC Earth Science.
Precipitation Estimation from Remotely Sensed Information using Artificial Neural Networks (PERSIANN) Kuolin Hsu, Yang Hong, Dan Braithwaite, Xiaogang.
The NOAA Hydrology Program and its requirements for GOES-R Pedro J. Restrepo Senior Scientist Office of Hydrologic Development NOAA’s National Weather.
NASA Snow and Ice Products NASA Remote Sensing Training Geo Latin America and Caribbean Water Cycle capacity Building Workshop Colombia, November 28-December.
Environmental prediction, risk assessment and extreme events: adaptation strategies for the developing world by Peter J. Webster, and Jun Jian Philosophical.
GEO - Weather Ocean Water Proposed Weather SBA and cross-linking work packages.
Operational Short-term Flood Forecasting for Bangladesh:
Evaluation of Passive Microwave Rainfall Estimates Using TRMM PR and Ground Measurements as References Xin Lin and Arthur Y. Hou NASA Goddard Space Flight.
© 2009 UCAR. All rights reserved. ATEC-4DWX IPR, 21−22 April 2009 National Security Applications Program Research Applications Laboratory Ensemble-4DWX.
Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson.
Technological Improvements in Flood Forecasting Thomas Hopson National Center for Atmospheric Research (NCAR)
Upstream Satellite-derived Flow Signals for River Discharge Prediction
Operational Flood Forecasting for Bangladesh using ECMWF ensemble weather forecasts Tom Hopson, NCAR Peter Webster, Georgia Tech A. R. Subbiah and R. Selvaraju,
Nathalie Voisin 1, Florian Pappenberger 2, Dennis Lettenmaier 1, Roberto Buizza 2, and John Schaake 3 1 University of Washington 2 ECMWF 3 National Weather.
An Overview of Satellite Rainfall Estimation for Flash Flood Monitoring Timothy Love NOAA Climate Prediction Center with USAID- FEWS-NET, MFEWS, AFN Presented.
A new high resolution satellite derived precipitation data set for climate studies Renu Joseph, T. Smith, M. R. P. Sapiano, and R. R. Ferraro Cooperative.
Judith Curry James Belanger Mark Jelinek Violeta Toma Peter Webster 1
Potential for estimation of river discharge through assimilation of wide swath satellite altimetry into a river hydrodynamics model Kostas Andreadis 1,
Long-lead flood forecasting for India: challenges, opportunities, outline Tom Hopson.
Apr 17, 2009F. Iturbide-Sanchez A Regressed Rainfall Rate Based on TRMM Microwave Imager Data and F16 Rainfall Rate Improvement F. Iturbide-Sanchez, K.
DOWNSCALING GLOBAL MEDIUM RANGE METEOROLOGICAL PREDICTIONS FOR FLOOD PREDICTION Nathalie Voisin, Andy W. Wood, Dennis P. Lettenmaier University of Washington,
VERIFICATION OF A DOWNSCALING SEQUENCE APPLIED TO MEDIUM RANGE METEOROLOGICAL PREDICTIONS FOR GLOBAL FLOOD PREDICTION Nathalie Voisin, Andy W. Wood and.
EVALUATION OF A GLOBAL PREDICTION SYSTEM: THE MISSISSIPPI RIVER BASIN AS A TEST CASE Nathalie Voisin, Andy W. Wood and Dennis P. Lettenmaier Civil and.
1. Session Goals 2 __________________________________________ FAMINE EARLY WARNING SYSTEMS NETWORK Become familiar with the available data sources for.
1. Session Goals 2 __________________________________________ FAMINE EARLY WARNING SYSTEMS NETWORK Understand use of the terms climatology and variability.
Seasonal Climate Forecasting for Applied Use in the Western USA Katherine Hegewisch 1, Renaud Barbero 2, John Abatzoglou 1 1 University of Idaho, Department.
“CMORPH” is a method that creates spatially & temporally complete information using existing precipitation products that are derived from passive microwave.
National Oceanic and Atmospheric Administration’s National Weather Service Colorado Basin River Forecast Center Salt Lake City, Utah 11 The Hydrologic.
Latin American and Caribbean Flood and Drought Monitor – What it does and does not do Figure showing current system Coarse resolution 25km, daily Satellite.
JPL Technical Activities
Tom Hopson, NCAR (among others) Satya Priya, World Bank
Development of Flood Forecasting for the Ganges and the Brahmaputra Basins using satellite based precipitation, ensemble weather forecasts, and remotely-sensed.
Flood Forecasting for Bangladesh
Precipitation Classification and Analysis from AMSU
Tom Hopson, NCAR (among others) Satya Priya, World Bank
Verifying and interpreting ensemble products
Precipitation Products Statistical Techniques
Jennifer Boehnert Emily Riddle Tom Hopson
Nathalie Voisin, Andy W. Wood and Dennis P. Lettenmaier
Application of satellite-based rainfall and medium range meteorological forecast in real-time flood forecasting in the Upper Mahanadi River basin Trushnamayee.
Forecast system development activities
Presentation transcript:

Daily to Seasonal Operational Flood Forecasting Tom Hopson, NCAR and ADPC Peter Webster, CFAB and Georgia Tech A. R. Subbiah, ADPC

Overview: Bangladesh flood forecasting I. Overview of daily to seasonal weather forecast products II. Seasonal forecasting: Bangladesh CFAB example III. Short-term forecasting: Bangladesh CFAB example 1. Where does good predictability derive? 1. precipitation forecast bias removal 2. multi-model river forecasting 3. accounting for all error: weather and hydrologic errors IV. Future Work: Dartmouth Flood Observatory

Utility of a Three-Tier Forecast System SEASONAL OUTLOOK: Long term planning of agriculture, water resource management & disaster mitigation especially if high probability of anomalous season (e.g., flood/drought) 30 DAY FORECAST: Broad-scale planning schedules for planting, harvesting, pesticide & fertilizer application and water resource management (e.g., irrigation/hydro-power determination). Major disaster mitigation resource allocation DAY FORECAST: Detailed agriculture, water resource and disaster planning. E.g., fine tuning of reservoir level, planting and harvesting.

forecast products for hydrologic applications Seasonal -- ECMWF System 3 - based on: 1) long predictability of ocean circulation, 2) variability in tropical SSTs impacts global atmospheric circulation - coupled atmosphere-ocean model integrations - out to 7 month lead-times, integrated 1Xmonth - 41 member ensembles, 1.125X1.125 degrees (TL159L62), 130km Monthly forecasts -- ECMWF - “fills in the gaps” -- atmosphere retains some memory with ocean variability impacting atmospheric circulation - coupled ocean-atmospheric modeling after 10 days - 15 to 32 day lead-times, integrated 1Xweek - 51 member ensemble, 1.125X1.125 degrees (TL159L62), 130km Medium-range -- ECMWF EPS - atmospheric initial value problem, SST’s persisted - 6hr - 15 day lead-time forecasts, integrated 2Xdaily - 51 member ensembles, 0.5X0.5 deg (TL255L40), 80km Short-range -- RIMES - 26-member Country Regional Integrated Multi-hazard Early Warning System (RIMES) WRF Precipitation Forecasts - 3hr - 5 day lead-time, integrated 2X daily - 9km resolution

1)Greater accuracy of ensemble mean forecast (half the error variance of single forecast) 2)Likelihood of extremes 3)Non-Gaussian forecast PDF’s 4)Ensemble spread as a representation of forecast uncertainty Motivation for Generating Ensemble Discharge Forecasts (from ensemble weather forecasts)

Overview: Bangladesh flood forecasting I. Overview of daily to seasonal forecast products II. Seasonal forecasting: Bangladesh CFAB example III. Short-term forecasting: Bangladesh CFAB example 1. Where does good predictability derive? 1. precipitation forecast bias removal 2. multi-model river forecasting 3. accounting for all error: weather and hydrologic errors IV. Future Work: Dartmouth Flood Observatory

Seasonal rainfall prediction for 2006 An example of seasonal predictions of precipitation issued in JFMA 2006 (left) and MJJA 2006 (right), to be compared with the observed rainfall (dotted line) and climatology (dashed line). The seasonal forecasts correctly indicate months in advance ‘higher than normal’ rainfall.

Overview: Bangladesh flood forecasting I. Overview of daily to seasonal forecast products II. Seasonal forecasting: Bangladesh CFAB example III. Short-term forecasting: Bangladesh CFAB example 1. Where does good predictability derive? 1. precipitation forecast bias removal 2. multi-model river forecasting 3. accounting for all error: weather and hydrologic errors IV. Future Work: Dartmouth Flood Observatory

CFAB Project: Improve flood warning lead time Problems: 1. Limited warning of upstream river discharges 2. Precipitation forecasting in tropics difficult Good forecasting skill derived from: 1. good data inputs: ECMWF weather forecasts, satellite rainfall 2. Large catchments => weather forecasting skill “integrates” over large spatial and temporal scales 3. Partnership with Bangladesh’s Flood Forecasting Warning Centre (FFWC) => daily border river readings used in data assimilation scheme

1) Rainfall Inputs 1)Rain gauge estimates: NOAA CPC and WMO GTS 0.5 X 0.5 spatial resolution; 24h temporal resolution approximately 100 gauges reporting over combined catchment 24hr reporting delay 2)Satellite-derived estimates: NASA TRMM 0.25X0.25 spatial resolution; 3hr temporal resolution 6hr reporting delay geostationary infrared “cold cloud top” estimates calibrated from SSM/I and TMI microwave instruments 3)Satellite-derived estimates: NOAA CPC “CMORPH” 0.25X0.25 spatial resolution; 3hr temporal resolution 18hr reporting delay precipitation rain rates derived from microwave instruments (SSM/I, TMI, AMSU-B), but “cloud tracking” done using infrared satellites 4)Weather forecasts: ECMWF GCM 51-member ensemble weather forecasts at 1-day to 15-day forecast lead-times (nominal resolution about 0.5degree)

Comparison of Precipitation Products: Rain gauge, GPCP, CMORPH, ECMWF

-- Increase in forecast skill (RMS error) with increasing spatial scale -- Logarithmic increase 2) Spatial Scale

Merged FFWC-CFAB Hydraulic Model Schematic Primary forecast boundary conditions shown in gold: Ganges at Hardinge Bridge Brahmaputra at Bahadurabad 3) Benefit: FFWC daily river discharge observations used in forecast data assimilation scheme (Auto-Regressive Integrated Moving Average model [ARIMA] approach)

Daily Operational Flood Forecasting Sequence

Transforming (Ensemble) Rainfall into (Probabilistic) River Flow Forecasts Rainfall Probability Rainfall [mm] Discharge Probability Discharge [m 3 /s] Above danger level probability 36% Greater than climatological seasonal risk?

ECMWF 51-member Ensemble Precipitation Forecasts 2004 Brahmaputra Catchment- averaged Forecasts -black line satellite observations -colored lines ensemble forecasts  Basic structure of catchment rainfall similar for both forecasts and observations  But large relative over-bias in forecasts 5 Day Lead-time Forecasts => Lots of variability

Pmax 25th50th75th100th Pfcst Precipitation Quantile Pmax 25th50th75th100th Padj Quantile Forecast Bias Adjustment -done independently for each forecast grid (bias-correct the whole PDF, not just the median) Model Climatology CDF“Observed” Climatology CDF In practical terms … Precipitation 01m ranked forecasts Precipitation 01m ranked observations

Bias-corrected Precipitation Forecasts Brahmaputra Corrected Forecasts Original Forecast Corrected Forecast => Now observed precipitation within the “ensemble bundle”

Daily Operational Flood Forecasting Sequence

Discharge Multi-Model Forecast Multi-Model-Ensemble Approach: Rank models based on historic residual error using current model calibration and “observed” precipitation Regress models’ historic discharges to minimize historic residuals with observed discharge To avoid over-calibration, evaluate resultant residuals using Akaike Information Criteria (AIC) If AIC minimized, use regression coefficients to generate “multi-model” forecast; otherwise use highest-ranked model => “win-win” situation!

2003 Model Comparisons for the Ganges (4-day lead-time) hydrologic distributed modelhydrologic lumped model Resultant Hydrologic multi-model

Multi-Model Forecast Regression Coefficients - Lumped model (red) - Distributed model (blue) Significant catchment variation Coefficients vary with the forecast lead-time Representative of the each basin’s hydrology -- Ganges slower time-scale response -- Brahmaputra “flashier”

Daily Operational Flood Forecasting Sequence

Significance of Weather Forecast Uncertainty Discharge Forecasts 3 day 4 day Precipitation Forecasts 1 day4 day 7 day10 day 1 day4 day 7 day 10 day Discharge Forecasts

What do we mean by “calibration” or “post-processing”? Probability calibration Basin Rainfall [mm] Probability Basin Rainfall [mm] Post-processing has corrected: the “on average” bias as well as under-representation of the 2nd moment of the empirical forecast PDF (i.e. corrected its “dispersion” or “spread”) “spread” or “dispersion” “bias” obs Forecast PDF Forecast PDF

Producing a Reliable Probabilistic Discharge Forecast Step 1: generate discharge ensembles from precipitation forecast ensembles (Q p ): 1/51 1 Q p [m 3 /s] Probability PDF Step 3: combine both uncertainty PDF’s to generate a “new-and-improved” more complete PDF for forecasting (Q f ): Q f [m 3 /s] 1 Probability Step 2: a) generate multi-model hindcast error time-series using precip estimates; b) conditionally sample and weight to produce empirical forecasted error PDF: forecast horizon time PDF Residual [m 3 /s] [m 3 /s] Residuals => a)b)

Significance of Weather Forecast Uncertainty Discharge Forecasts 3 day 4 day 5 day 7 day8 day 9 day10 day 2004 Brahmaputra Discharge Forecast Ensembles Corrected Forecast Ensembles 7 day8 day 9 day10 day

2 day 3 day4 day 5 day 7 day8 day 9 day10 day 50%95% Critical Q black dash 2004 Brahmaputra Forecast Results Above-Critical-Level Cumulative Probability 7 day8 day 9 day10 day Confidence Intervals

2007 Brahmaputra Ensemble Forecasts and Danger Level Probabilities 7-10 day Ensemble Forecasts7-10 day Danger Levels 7 day 8 day 9 day10 day 7 day8 day 9 day10 day

Overview: Bangladesh flood forecasting I. Overview of daily to seasonal forecast products II. Seasonal forecasting: Bangladesh example III. Short-term forecasting: Bangladesh example 1. Where does good predictability derive? 1. precipitation forecast bias removal 2. multi-model river forecasting 3. accounting for all error: weather and hydrologic errors IV. Future Work: Dartmouth Flood Observatory

Satellite-based River Discharge Estimation Bob Brakenridge, Dartmouth Flood Observatory, Dartmouth College

River Watch Day/Night Flood detection on a near-daily basis regardless of cloud cover. Measurement of river discharge changes; current flood magnitude assessments Immediate map-based prediction of what is under water Access to rapid response detailed mapping as new maps are made Access to map data base of previous flooding and associated recurrence intervals.

Application to the Ganges River Basin

MODIS sequence of 2006 Winter Flooding 2/24/2006 C/M: /15/2006 C/M: /22/2006 C/M: 1.095

The Advanced Microwave Scanning Radiometer - Earth Observing System (AMSR-E) is a twelve-channel, six- frequency, passive-microwave radiometer system. It measures horizontally and vertically polarized brightness temperatures at 6.9 GHz, 10.7 GHz, 18.7 GHz, 23.8 GHz, 36.5 GHz, and 89.0 GHz. Spatial resolution of the individual measurements varies from 5.4 km at 89 GHz to 56 km at 6.9 GHz. AMSR-E was developed by the Japan Aerospace Exploration Agency (JAXA) and launched by the U.S. aboard Aqua in mid Objective Monitoring of River Status: The Microwave Solution

One day of data collection (high latitudes revisited most frequently)

Example: Wabash River near Mount Carmel, Indiana, USA Black square shows Measurement pixel. White square is calibration pixel.

Site 98, Wabash River at New Harmony, Indiana, USA

2/17/ /1/ /24/ Guide to Predicting Inundation Irrawaddy River, Burma The current hydrologic status and discharge or C/M ratio can be used to determine present inundation extent.

Conclusions 2003: CFAB Brahmaputra/Ganges forecasts went operational 2004: -- Forecasts fully-automated -- Forecasts fully-automated -- forecasted severe Brahmaputra flooding event 2007: 5 pilot areas warned many days in-advance during two severe Brahmaputra flooding events Future Work Dartmouth Flood Observatory river discharge estimates assimilated for improved skillful long-lead forecasts Fully-automated forecasting scheme relying on global inputs (ECMWF forecasts, satellite rainfall) rapidly and cost-effectively applied to other river basins with in-country capacity building

Thank You!