Contracting for Commissioning Services A Priority for Facility Owner’s and Program Managers Matt Ferreira, CxA, LEED AP October 14, 2008.

Slides:



Advertisements
Similar presentations
Total Workforce Development Needs Energy Sector. Mechanical Pathways Electrical Pathways Architectural Pathways.
Advertisements

1 Solicitations/Advertisements Solicitations/Advertisements
East Hampton High School July 2013 – July 2014 Design Phases.
Terminal Commissioning Case Study- Terminal A Logan International Airport ACI-NA Environmental and Operations & Technical Conference May 4, 2008 Sam Sleiman,
Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
Chapter 9 Integrative Process 1 © 2013 Green Building Academy. All rights reserved.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
CSM Buildings Modernization DESIGN-BUILD QUALIFICATION CONFERENCE November 12, 2008.
Building Commissioning
1. Introduction 1.1. Fire program management involves the identification, evaluation, and control of hazards which may result in a fire OSHA & Emergency.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Interstate 81 Bridges over Route 80 Design-Build Project (PIN , D900023) Town of Tully, Onondaga County.
Energy Saving Improvement Programs aka: ESIP; ESCO; P.L. 2009, c. 4 Gordon Ball, Senior Procurement Specialist Division of Local Government Services Introducing…
Using QBS A Qualifications-Based Selection Process Presenters: Ron Brenke, PE - QBS Manager.
Commissioning Presentation For Society of American Military Engineers (SAME) George Washington University Chapter February 25, 2011.
The Importance of the Qualifications Based Selection (QBS) Process
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
The Future of Commissioning for Sustained Building Performance Birmingham, AL SERBCA Fall Conference Proposed LEED Requirements for Commissioning.
Building Standards for High Performance Buildings High Performance Building Council National Institute of Building Sciences Washington DC.
The 5 th Annual Conference on Total Building Commissioning 2009 Commissioning Changes in LEED 2009 Paul McCown, PE, CxA, LEED AP, CEM SSRCx, LLC.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
King County Wastewater Treatment Division What you need to know about WTD’s Technical Standards.
Unit 8:COOP Plan and Procedures  Explain purpose of a COOP plan  Propose an outline for a COOP plan  Identify procedures that can effectively support.
Industrial Engineering Roles In Industry
High Performance Building Standard Regulations An Introduction.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Region 9 Design-Build Project (PIN , D900020) Broome, Delaware,
ESPLOST Savannah-Chatham County Public Schools January 10, 2007.
Phoenix Convention Center Phoenix, Arizona Procurement & Benchmarking Strategies for High Performing Buildings Procurement, Process, & People: The Path.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
Creating A Cleaner Energy Future For the Commonwealth Renewable Closed Landfills Eileen McHugh Municipal Energy Programs Coordinator July 26,
Best Value Public Works Procurement September 7, 2007.
Lecture #2: The Design and Construction Team Professor: Robert Powell, AIA TA: Matt O’Brien, AIA August 20, 2008 AREN 231: Methods and Materials.
Building Commissioning: Cx 101 Brock Graham, Gilbane Building Co. Michael Gannon, BVH Integrated Services November 15, 2010.
Documentation David M. Shapiro David M. Shapiro Disaster Planning and Recovery Consultants 4030 Wake Forest Road, Raleigh NC Tel: (919)
Energy Curriculum Advanced Transportation Technology and Energy Initiative.
The Owner’s Perspective
Procurement Authority Representative Roles and Responsibilities Amanda Price, Program Development Coordinator, Planning and Programming, Transportation.
Scoping a Commissioning Job in Terms of Contractor Involvement ???
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
P-100 Industry Day 29 November What is the P100? The Facilities Standards for the Public Buildings Service The P100 is a mandatory standard. It.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
College of Engineering CIVE 4750 Using QBS A Qualifications-Based Selection Process Adapted from a presentation by QBS, Inc. 215 N. Walnut St. Lansing,
C U S T O M E R D R I V E N. B U S I N E S S M I N D E D. Department of Licensing & Regulatory Affairs Bureau of Construction Codes Keith E. Lambert, P.S.,
Interview For Professional Architectural Services Florida Department of Health Office of Design and Construction 4052 Bald Cypress Way Tallahassee, Florida.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
Inter-American Development Bank BIMILACI 2007 QUALITY PROCUREMENT Third Party Review May 2007 Project Procurement Division.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
The importance of process in high performance building design.
Making Health Facility Safe Through Facility Management
CSM Buildings Modernization DESIGN-BUILD QUALIFICATION CONFERENCE
ACEC INDIANA Environmental Business & Funding Source Conference
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
Proximity to Opportunity IAH New Terminal C North
Joint Schools Construction Board Phase II
QBS: The Process Selecting a Design Firm
American Institute of Constructors
PROJECT DELIVERY METHODS
P-100 Industry Day 29 November 2007.
Case Study #3 Existing Building Refinance/Rehab MAP 221 D4 SR
CxA at Georgia Tech TRAINING OUTLINE Overview of CxA
Construction and Facilities Program October 12, 2012
Job Order Contracting Feasibility Study 2050 Partners, Inc.
Presentation transcript:

Contracting for Commissioning Services A Priority for Facility Owner’s and Program Managers Matt Ferreira, CxA, LEED AP October 14, 2008

Establishing The Requirement Owner’s Policy –Internal Quality Assurance Program –Green Buildings – LEED™ Certification –Federal Facility Requirement –State / County / Municipality Code

Section I: Defining the Commissioning Scope of Work

When Will Commissioning Start –Project Conception –Design Phase –Construction Phase –Post-Occupancy

Select Systems To Be Commissioned –Mechanical: HVAC, Controls, Plumbing, Fire Protection –Electrical: Switchgear, Transformers, DPB, Lighting, Standby Power –Specialty Systems: Fire Alarm, Security, Telecom / Data, Curtain Wall, Thermal Envelope, Renewable Energy, Rainwater Harvesting, etc. –Computerized Maintenance Management System

Factors to Consider When Budgeting –Systems Selected to be Commissioned –Level of Commissioning Rigor –Total Construction Costs –Geographical Region

Section II: Request for Qualifications

Who is the solicitation open to? –Third Party Independent Commissioning Firms –Architect / Engineering Team –Construction Management Team

Announcing the Solicitation –Owner’s Procurement Department, i.e. Design and Construction RFQ/RFP website –Association Websites, Newsletters –Existing Industry Relationships

Owner Desired Qualifications –Experience Commissioning Comparable Projects –Direct Experience Writing Commissioning Work Products –Other Valuable Experiences: Designer, CM, Operator, Project Manager –Association Membership and Certification

Section III: Request for Proposals

How Will Commissioning Be Procured –Just Design Phase –Design w/ Option for Construction –Design Thru Construction –Design Thru Post-Occupancy*

Receiving Quality Proposals –Requires Owner Provided Project Details Location, Size, Building Type, Schedule, Construction Costs, LEED™ Certification Systems To Be Commissioned Terms and Conditions –Answering Questions / Pre-proposal Meetings –Limit The Size of Proposal –Emphasis on Key Individuals and Approach

Section IV: Selecting the Right Provider

Shortlist and Interviews –Top Three Firms Notification –Conducting Interviews Key Individuals, Location, Questions –Making The Selection Rating System

Section V: Integrating Cx into the Project

Owner’s Team Meeting –Introduce Owner’s Project Team –Discuss Project Goals –Cover Administrative Details, Procedures, Access Requirements –Document Expectations

Section VI: Questions……