Non-Residential Lighting Protocol - Retrofits Regional Technical Forum September 16, 2014.

Slides:



Advertisements
Similar presentations
UPDATE ON GROCERSMART 4.0 RESEARCH PLAN Regional Technical Forum May 3, 2011.
Advertisements

T12 Replacements with HPT8s in Kitchens and Garages Regional Technical Forum October 15, 2013.
Assessment Consultation Karen Mahony Development Officer.
Residential Refrigerators and Freezers UES Measure Update Regional Technical Forum October 14, 2014.
Direction on Guidelines Savings Definition Path Results of straw vote and proposed decisions for elements of the savings definition Regional Technical.
RTF Lighting Standard Protocol Review of Hours of Operations, Controls Savings, and Variation.
Residential LED UES Measure Update Regional Technical Forum August 20, 2013.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Scientific Irrigation Scheduling RTF Staff/CAT Discussion RTF SIS Subcommittee November 20, 2014.
Non-Res Lighting Subcommittee Retrofit Lighting Standard Protocol Review 10/23/13.
Grocery Measure: LEDs for Reach-In Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Industrial Pump Motor VFDs: Provisional Standard Protocol Christian Douglass Regional Technical Forum 5/12/2015.
Provisional Protocol and Research Plan: Non-Residential Lighting Retrofits Regional Technical Forum December 16, 2014 Seems fine to me. (Baker) I like.
Company Confidential Registration Management Committee 1 AS9104/1 Certification Structures - Client and CB Agreement July 17, 2014 Tim Lee Chair - IAQG.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N DRAFT: Methods for Evaluating Residential Behavior-based Programs RTF Presentation February 2,
Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Plans to bring Out-of-Compliance UES Measures back into Compliance: 1. Agricultural Irrigation Hardware UES 2. Agricultural Motors UES Regional Technical.
Provisional Protocol and Research Plan: Non-Residential Lighting Retrofits Regional Technical Forum November 18, 2014.
Implementer’s Group January Meeting Debrief and Upcoming Meeting Prep January 29, 2015.
Provisional Protocol and Research Plan: Non-Residential Lighting Retrofits Nonresidential Lighting Subcommittee November 6, 2014.
Guidelines for the Development and Maintenance of RTF- Approved Measure Savings Estimates December 7, 2010 Regional Technical Forum Presented by: Michael.
Overview of the Regional Technical Forum Guidelines January 22, 2013.
Non-Residential Network Computer Power Management UES Measure Update Regional Technical Forum July 16, 2013.
Non-Res Lighting Subcommittee Retrofit Lighting Standard Protocol Review 04/03/14.
DHP for Houses with Electric FAF Research Plan: Revisions Adam Hadley, Ben Hannas, Bob Davis, My Ton R&E Subcommittee February 25, 2015.
Residential Behavior Programs RTF Subcommittee Ryan Firestone September 17, 2015.
Agricultural Irrigation Pump Variable Frequency Drive Provisional Standard Protocol Proposal Regional Technical Forum April 16, 2013.
Out-Of-Compliance Grocery UES Measure Recommendations Regional Technical Forum March 18, 2014.
Delivery Verification Jennifer Anziano Regional Technical Forum March 17, 2015.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
RTF Pump VFD Provisional Standard Protocol Regional Technical Forum June 18, 2013.
July 26, 2014 Refrigeration Subcommittee Proposed Revision of Refrigeration Provisional Data Requirements.
Residential Single Family and Manufactured Home Heat Pump Water Heaters Christian Douglass Regional Technical Forum 4/14/2015.
Refrigerator Decommissioning: Measure Status Update Regional Technical Forum October 16, 2013.
Update: Grocery Refrigeration Provisional Standard Protocol for Site Specific Savings RTF Meeting June 28,
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
RTF Custom Protocols: Background, Issues and Critical Elements February 8, 2012 Regional Technical Forum Subcommittee on Impact Evaluation and Custom Protocol.
Schools Lighting Hours of Use Data Regional Technical Forum May 13, 2014.
Scientific Irrigation Scheduling Provisional Standard Protocol Regional Technical Forum November 19, 2013.
Research Strategy Review: Advanced Power Strips MH HVAC Related Measures Jennifer Anziano RTF R&E Subcommittee August 6, 2015.
Standard Protocol Development for Advanced RTU Control Retrofit August 15, 2013 Presentation to: Regional Technical Forum RTUG Subcommittee Sponsored by:
Integration Issues for RTF Guidelines: Savings, Lifetimes and Cost/Benefit October 24, 2012 Regional Technical Forum Presented by: Michael Baker, SBW.
Implementer’s Group July 2015 RTF Meeting Debrief and Upcoming Meeting Prep July 29, 2015.
Regional Technical Forum Automated Conservation Voltage Reduction Protocol.
T12 to HPT8 Change-outs Small/Rural request for development May 15, 2012.
PTCS Commissioning, Controls & Sizing Update of UES Measure Category and/or Status Regional Technical Forum July 15, 2014.
Define Research Problem. 2 Management objectives: –To solve current problem facing company –To improve efficiency –To plan for future Current problems.
RTF Residential Lighting Subcommittee Tuesday, March 4, 11am – 12:30pm 1.
Non-Residential Lighting: Status Update Christian Douglass & Josh Rushton Regional Technical Forum November 10, 2015.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Presented by: Todd Amundson, BPA Jane Peters, research into action Ryan Fedie, BPA Update.
BPA Impact Evaluation Policies QSSI. 2 Drivers: Industry Best practice, Power Act, RTF Guidelines, confidence savings.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
REBUILD AMERICA. Why look at the bills? l Bills are the bottom line –they prove the savings!
RTF Management Updates Jennifer Light Regional Technical Forum January 21, 2016.
Proposed Edits to the Air Source Heat Pump Specifications Regional Technical Forum August 20, 2013.
Non-Proven Residential Duct Sealing Measures: Research Strategy Josh Rushton and Adam Hadley Research and Evaluation Subcommittee October 7, 2015.
Non-Res Code Compliant Lighting: Working Toward a Standard Protocol Christian Douglass, RTF Contract Analyst Non-Residential Lighting Subcommittee October.
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Exterior LED Area Lights
Implementer’s Group December Meeting Debrief and Upcoming Meeting Prep January 6, 2015.
GrocerSmart™ 4.0 RTF Approval of Software and Adherence to RTF Guidelines April 5, 2011.
Residential Behavior-based Programs Measure Development Update Ryan Firestone Regional Technical Forum March 15, 2016.
November 2, 2011 Comprehensive Lighting: Solutions for the Greater Good David Landers Manager, Business Energy Management Efficiency Connections Northwest.
Formation of a Market Analysis Subcommittee Charlie Grist and Jennifer Light RTF Policy Advisory Committee February 19, 2016.
RTF Delivery Verification Guidance Batch 3 Jennifer Light Regional Technical Forum November 10, 2015.
Project Management Process Groups
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Presentation transcript:

Non-Residential Lighting Protocol - Retrofits Regional Technical Forum September 16, 2014

When did this effort start? March, 2012 – Charlie still had brown hair! Significant work on protocol in subcommittee Brought before the RTF several times – Working through provisional protocols at the time – Never complete with regards to clear research needs and adherence to Guidelines January 16, 2013 – Sent back for major revisions 2

Since then… Staff re-wrote protocol – Separated research plan content and split protocol into retrofits and “non-retrofits” Held 4 subcommittee meetings after substantial progress made on certain sections Received final comments on September 4 th, 2014 and incorporated them into current version 3

Why all this effort? 4 42% 20% Source: BPA Regional end-use achievement data

Outline for today Overview of protocol key terms and application Explanation of research needs Outstanding items from last call Changes made since last subcommittee meeting Decision 5

Key Definitions Hours of Use (HOU) and Hours of Occupancy (HOO) HOU is what is metered on-site during research phase HOO is what is gathered by site interview; used as a proxy for HOU. Space Use Type (SUT) For retrofits, SUT is used to define a space inside/outside the building with a specific use and hours of occupancy (HOO) – SUT is linked to code LPA nomenclature when possible Base-case or Efficient-Case Lighting System Combination of fixtures associated with a single control type within each SUT – Takes into account individual controls effects on different fixtures – Many fixtures within a SUT can be considered a single lighting system if they have the same control types (i.e. multiple occ sensors in open office can be one system) Lighting calculator requires line item entry of fixtures and controls, (i.e. a system) with a SUT and HOO for each lighting system Project Sum of all SUT’s and their lighting systems is considered the project – HVAC interaction factor based on primary equipment used to condition entire project Controls Savings Fraction (CSF) The percent reduction on a fixture wattage or HOU (or both) specific to individual control type 6

PROJECT Lighting System SUT Lighting System Lighting System* *If HOO are the same for all fixtures/controls. Lighting systems cannot cross a SUT. SUT 7

Protocol Applicability Building TypeSpace Use TypeControl Type AssemblyAssembly spaceManual College or University ClassroomOccupancy sensor StairwayBi-level lighting Area lighting / Parking Garage Parking garage, exteriorOccupancy sensor Industrial / Manufacturing IndustrialManual Office Private officeOccupancy sensor Conference-copy-, mail-, restroom Occupancy sensor Open officeDaylight sensor StairwayBi-level lighting RetailRetail sales areaManual School K-12 ClassroomOccupancy sensor ClassroomDaylight sensor StairwayBi-level lighting WarehouseAisle lightingOccupancy sensor 8

HOO Interview GuideInterview Guide Developed in Excel to streamline calculations and data entry Seeks to prove out simplified method 2 ways – Collecting project level HOO data Historically done in programs this way – Collecting space level HOO data Results will be compared to metered data – Will help inform what level of interviewing is necessary and reliable for a proven protocol 9

Protocol CalculatorCalculator Used for protocol savings estimation; – Programs likely to continue to use utility-specific calculators Accepts input from HOO Interview Guide to streamline data entry Accepts metered data entry from data loggers Compares Best Practice to Simplest Reliable Methods 10

PROVISIONAL RESEARCH PLAN 11

Comparison of Methods Simplest Reliable MethodBest Practice Method HOU Interview to obtain HOO by SUT as a proxy for HOU Meter fixtures to derive HOU Controls Savings Fraction Use default table of values for each control type Meter systems on individual controls to obtain % reduction Fixture Wattage Use manufacturer rating Need to collect provisionally 12

Research objectives Want to estimate… Relationship (ratio?) between HOO and uncontrolled HOU; CSF for different control types. Don’t expect knowledge of these to carry over much between space use types and building types. Plan calls for independent samples for different control-/space-/building-types. 13

Research assumptions Separate CV estimates for each control- /space-/building-type. – Values made up, based on patterns we expect to see in each scenario. Reasoning described in research plan appendix. – Sample sizes will move around if we get better information. Plan calls for pre- and post- metering at most sampled sites. 14

Sample targets Building Type Space Use Type Control Type Estimated CV Precision, 90% conf. Sample size Assembly Assembly space Any0.2520%5 College or University Classroom Occupancy sensor %17 Stairway Bi-level lighting %17 Exterior/ Parking Parking, exterior Occupancy sensor %25 Industrial / Manufac. IndustrialAny0.2520%5 ⋮⋮ (continued on next slide) ⋮ 15

Building Type Space Use Type Control Type Estimated CV Precision, 90% conf. Sample size Office Private office Occupancy sensor %31 Conference- copy-, mail-, restroom Occupancy sensor %39 Open office Daylight sensor %20 Stairway Bi-level lighting %39 Retail Retail sales area Any0.2520%5 School K-12 Classroom Occupancy sensor %39 Classroom Daylight sensor %11 Stairway Bi-level lighting %11 WarehouseAisle lighting Occupancy sensor %17 16

Research cost estimates TaskParticipantUnitsUnit CostCost Training and Data Quality Coordination Research Coordinator 240 hrs (40 each for 6 data providers) $150 per hour $36,000 Data Collection and Organization Utilities and Lighting evaluator 279 pre and post Lighting system $800 for both pre and post tests $223,200 Data, Collection, Analysis and Reporting RTF16 hours per data set submitted (6 submissions) $150 per hour $14,400 Total:$273,600 17

Outstanding Items Technical Subcommittee largely agreed with Protocol Content – Clarification was made to protocol cost, CSF applicability in protocol vs. research plan, and data collection for ballast factors – Technical subcommittee requested re-evaluation of cost for research; draft numbers considered “optimistic at best” – No other major outstanding items in protocol identified 18

R&E Subcommittee Feedback R&E Subcommittee feedback and responses summarized posted Key research items addressed: – Limitations to how the research plan addresses feedback – Clarification within the document around: Rationale behind focus on hours of use Rationale for sample size Clarifications around sampling requirements 19

Changes Made Restructure protocol to limit applicability to only items in research plan – Intent is to avoid confusion – Protocol may be expanded following research Removed obsolete equipment table 20

Decision “I _______ move to approve Provisional Standard Protocol for Lighting Retrofits, the associated Research Plan, and the Protocol Calculator, and set the sunset date to September, 2016.” 21

BACKUP SLIDES 22

Example Space Data Collection Baseline data collection – Identify a SUT based on HOO and use of the space – Identify each lighting system within a SUT A lighting system is associated with a particular control type These lighting systems all occur within the same SUT therefore HOO should be the same – Note: Lighting systems cannot cross SUT – Eventually determine controlled HOO for each lighting system Apply CSF and results of site interview Fixture Type Fixture Quantity Lamps/ fixture Wattage/ lamp Ballast Type Total Wattage SUTHOOControl Type Downlight5160N/A300 Conference room 4.0Manual Switch Sconce2140N/A80 Conference room 4.0Daylight Sensor Counter Light 21100N/A200 Conference room 4.0Manual Switch Gathered by interview 23

Example Space Data Collection Determine baseline power of each lighting system CSF is used to apply an adjustment to HOO for each lighting system to arrive at HOU – Interview answers used to roll up to annual savings Fixture Type Fixture Quantity Lamps/ fixture Wattage / lamp Ballast Type Total Wattage SUTHOOControl TypeCSFHOU Daily kWh consumption Downlight5160N/A300 Conference room 4.0Manual Switch0% Sconce2140N/A80 Conference room 4.0Daylight Sensor40% Counter Light 21100N/A200 Conference room 4.0Manual Switch0% Total:2.19 Calculator does this based on inputs 24

Example Space Data Collection Efficient Case Data Collection & Consumption – Utilize same SUT boundaries when applicable Note: Major change in SUTs means retrofit protocol N/A – Same method as baseline for fixture count, quantity, etc. for each control type within a lighting system – Calculator can determine savings allocation Controls savings vs. wattage reduction savings Fixture Type Fixture Quantity Lamps/ fixture Wattage/ lamp Ballast Factor Total Wattage SUTHOOControl Type CSFHOU ee Daily kWh consumption HPT86228 Low (0.85) 286 Conference room 4.0 Occupancy & Daylight Sensor 40% Total:

Questions that came to mind Q: Do you conduct HOO interview separately from site audit? – A: Intent is to have them occur at the same time to minimize effort Q: Is the Interview Guide paper based or electronic? – A: Electronic would be easiest for projects with multiple space types. For simple projects (one space, or <5 spaces) paper printouts might also work fine Q: What needs to be done pre and post? – A: HOO interview should be done concurrently with site audit during pre period. Controls savings based off site audit form (ex. lighting calculators). Logging pre & post during provisional phase Q: Who should be asked about HOO during site visit? – A: Protocol states someone “…knowledgeable of lighting HOO at the site.” Essentially left up to practitioner to decide who that is. 26

Questions that came to mind Q: What if metered data doesn’t match HOO interview data? – A: Need to determine another candidate simplified method. Important to get interview questions correct during provisional phase. Q: Why not just use EMS to do pre/post logging? Why the need for metered light output and controls on individual systems? – A: Aggregate savings are fine for a custom measure, but for a simplified approach you need to take into account site variance – all will not have an EMS and intent is to allow for no on-site metering once protocol is proven Q: What happens after provisional phase? – A: Analyze results that ideally prove out candidate simplest reliable method (i.e. interview for HOO, use CSF table for controls) – Revise interview method if necessary based off results – Proven protocol only requires metering on a sample* of projects going forward * Sample size likely determined by program evaluator 27