Pseudo CCV System System Diagram Bracket Diagram 50hr oil and carryover add procedure Observations and Background.

Slides:



Advertisements
Similar presentations
Stop The Leak.
Advertisements

Coach Air Conditioning
Supercharging Chapter 8.
K&W Permanent Metallic ® Block Seal
FP-2 T-44 Ops Limits Overview System Limitations Propeller Limitations Starting Limitations Engine Limitations Airspeed Limitations Miscellaneous Limitations.
Permanent Head Gasket & Block Repair w/Nanotechnology, 32 Fl Oz
The students in the Freshman Academy & the Green School Initiative are proud to present the following on- line tutorial about biodiesel production at HPHS.
Safe Use and Operation of Vacuum Lines
Exhaust Gas Recirculation (EGR)
The Poorman’s off Chassis Restoration. Com Copyright 2004 Click your tool bar BACK button to exit How to Navigate.
Fuel System Carburetor A device that mixes air and fuel
SURVEY OF CHEMISTRY LABORATORY I CHEM 1151L ANTACID EVALUATION.
SAFETY MEETING Off Highway Trucks. Brakes There are four separate controls used for braking Service Brake Retarder Secondary Brake Parking Brake.
Love the One You’re With Tom Bell Go Home with the One That Brought You or.
1B-1 Fire Engine Maintenance Unit 1B – Pump Inspections and Maintenance.
Proper Pump Installation Practices
Pre-Lab 4.1. Purpose To determine if you can dissolve all of a solid into a liquid.
Thermal Pollution and Its Effect on Dissolved Oxygen Lab
Step 1 Park vehicle on a level surface then engage the parking brake and turn off engine. If you cannot comfortably get under the car, raise the front.
JHCBC AUTO A/C PERFORMANCE TESTING CHAPTER 3 Page
Engine Installation, Break-In, and In-Chassis Repairs
Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI January 11, 2005.
Left side compressor behind Left control box Right side compressor behind Right control box.
8/8/20061 LATE TYPE EVAP At Rest 1. 8/8/20062 LATE TYPE EVAP Components 2.
Diffusion Experiment.
Changing your car's oil yourself is not only a money saver—it’s also a lot easier than it sounds! By Rachel Ammann ENGL 393.
Engine drills & Limitations.
Section 703 Apparatus Inspection. Procedures The driver/operator should follow a systematic procedure for inspecting apparatus This ensures that all important.
Tempest Blower SECTION: Tools and Equipment ISSUED: REVISED: ##-####
Safety Talk 9 / 1 Safety Talk 9 Safe Operation of Fired Heaters: start-up.
States of Matter! Molecules are vibrating. Molecules are moving faster. Definite volume No definite shape Definite volume Definite shape From CPO focus.
Fuel System Carburetor A device that mixes air and fuel in correct proportion for efficient combustion. Stoichiometric Ratio 14.7 : 1 (Air : Fuel)
ISX12 G & ISL G Cold Weather Operation 1. ISX12 G and ISL G Cold Weather Operation  Cold weather affects CEGR SI natural gas engines differently compared.
1 Emission Control Systems. 2 Vehicle Pollution Sources 3 areas of a vehicle that can pollute…3 areas of a vehicle that can pollute…  tailpipe emissions.
HPU FILTERS LOW PRESSURE FILTER FROM APU UNIT. CLOSE APU HYDRAULIC FLUID VALVE. FILL FILTER WITH HYDRAULIC FLUID PRIO TO INSTALLATION. LUBRICATE GASKET.
XAS 375 CD6 Compressors Committed to sustainable productivity
Too Cool For School. Greenhouse Lab Today you will use a model of a greenhouse to answer the following question: How does the air temperature in an open.
Lab # 5 Ash Analysis.
A/C SYSTEM SERVICE 1  A/C manifold gauge set  Manifold valves  Hose end valves  Performance test  Pressure diagnosis  Manifold purging and disconnect.
Advanced Engine Performance Diagnosis, Fourth Edition James D. Halderman Copyright ©2009 by Pearson Higher Education, Inc. Upper Saddle River, New Jersey.
OILGEAR PVV PUMPS PVV 200 Performance Curves.
Vacuum Pumps. Vacuum Pump Safety Physical and Chemical Hazards – Always vent pump exhaust – Keep pump away from flammable.
Cummins ISB Test Development Task Force Cummins Surveillance Panel Mark Sarlo, SwRI February 21, 2005.
Created: 30 Aug 2015 Updated: 18 Sep 2015 T6BDriver.com
More Graphing Problems Soil vs. Water … then I will turn off the lights and measure how each one cools.
Modification of the 11T Dipole impregnation mould Impact on impregnation parameters Remy Gauthier,
STEP 1 Locate the transmission cooler line connection on the vehicle. Identify the correct adapters to be used by referring to the vehicle application.
AIRCRAFT INSPECTION INSPECTION PROCESS. The Art of Inspection What inspection What inspection Who can inspect Who can inspect Phases of inspection Phases.
14 Refrigerant Recovery, Recycling, and Recharging.
Greenhouse Effect Lab Page 71.
Service Procedure For Changing Engine Oil And An Oil Filter
UNIT INJECTOR SYSTEM.
FP-2 T-44 Ops Limits 5/6/15.
CHAPTER 45 Engine Lubrication.
Engine Oil Changes.
PCV and EVAP Emission Control Systems
Crystal Formations! By Quinn Santucci.
Engine Oil Changes.
Specific Heat Capacity
Service Tips April 2005.
Digital Chart Recorder Operation
Cryogenics – The Basics
AVIATION 325 PITOT - STATIC SYSTEM VACCUM SYSTEM
Cooling system problems
Octane Engine Testing Procedure
Body ElectricalModel OutlineChassisBodyfor TechnicianEngine 1 Contents Click a Section Tab.
Presentation transcript:

Pseudo CCV System System Diagram Bracket Diagram 50hr oil and carryover add procedure Observations and Background

Pseudo CCV System Diagram

Pseudo CCV System Bracket Diagram

50 Hr Oil Add Procedure Every 50hrs except 500 th Period End Weight is recorded just prior to each 50 th hour for use in the usual Fill to Full calculation Engine ramps down essentially using the usual 10min ramp down process (STAGE2, and 1) Engine then idles for 15 minutes; just enough time for operators During that time the vacuum is shut off for a minimum of 5 minutes in order to purge the CCV Filter Canister Drain Line

50 Hr Oil Add Procedure Blowby Carryover from the CCV Filter Canister Drain Line is weighed and recorded Fill to Full (5.5kg) oil add, calculated allowing for carryover weight, is then added to the Oil Weigh Bucket along with the blowby carryover The vacuum is turned back on prior to ramp up The engine ramps back up to rated power utilizing the usual warm up process (STAGES 2, 3, 4, and 5) Idle: 600RPM, No load

Observations and Background The Fuel Temperature and Intake Manifold Temperature set points were changed in the two shutdown stages: Fuel Temp 35, 30 and also IMT 30, 25. After shutting down the vacuum the line is purged very nicely without any mess Upon reaching about 27” of carryover in the line the check valve begins a slow drip A 1L beaker is being used as a container for the carryover for ease of use in returning the carryover to the oil weigh bucket A stopper, “borrowed” from our chem lab, is being used to cover the beaker

Observations and Background Carryover is not included in Fill to Full calculation since it would not be measured separately if the drain line were going back to the pan; it will show itself after the first 50hr period The CCV filter is weighed at the beginning and end of test The vacuum has currently sustained +/- 0.7kPa; currently +/- 1.0 is being used as a safety until more data is acquired Pressure depression is not currently being “controlled”; an engine in the field would not be measuring nor controlling to a set pressure Target 6.8 kPa negative pressure down stream of CCV filter canister