WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.

Slides:



Advertisements
Similar presentations
Parametric Modeling Parametric Modeling
Advertisements

SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
MEHRAS Consulting Co. Shipbuilding Department Address: No: 1201 to 1204, 12th Floor B-Tower, Payetakht Computer Complex, Mirdamad Boulevard, Valiasr St,
Inventor Or How to build things.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
Results on Test Cryostats and The AGATA Asym. Triple: Status of Cryostat Production AGATA Detector Group Meeting, IKP Cologne March 16th, 2006.
Agreement on scope of supply and extent of interface among different suppliers of the AFC module This talk covers the scope of supply on the Absorber Focus.
MICE COLLABORATION MEETING CERN March 29-April 1, 2004 Detector/Focus Coil module interface details P. Fabbricatore INFN-Genova Detector/Focus Coil module.
The WA105 17m3 LArCryostat pre-experience M.Ne. Status Tender done for the membrane part, 1 German firm selected A lot of time wasted to renegotiate the.
1 Summary of MICE beamline & hall installations This is a very rough summary of the progress since mid-December Richard Apsimon & Andy Nichols MICO meeting.
TRANSPORT of ICARUS from LNGS to CERN Alberto Scaramelli INFN-Milano Following the meeting at LNGS on 11-12/9 Last News 102/10/2014A. Scaramelli.
CERN LBNE Test Experiment. Plan view of Bat
ES050 – Introductory Engineering Design and Innovation Studio 1 Features Prof. Paul Kurowski.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
ICARUS Cold Vessels Thermal insulation Project progress report.
Parametric Modeling. 3D Modeling Steps - Sketch Step 1 Sketch Geometry (use the “line” tool today) You are making a four-sided shape that is not necessarily.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
Thermosiphon Project - Condenser repair CERN – Geneva January 8 th, 2014 M. Battistin & all TS team ATLAS + EN/CV.
UPDATE ON THE CRYOSTAT DESIGN AND INSTALLATION SEQUENCE.
Some naïf ideas on cryostats , BNL-LBNF meeting D.Mladenov, M.Nessi.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
LAr Week Feb 2000 M. Lefebvre Milestones and Schedule General Production Readiness Review  Passed in Jan 99 Leak Test Station and Electric Test.
WELDING TESTS & OTHERS ISSUES SUMMARY
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
ES050 – Introductory Engineering Design and Innovation Studio 1 Features Prof. Paul Kurowski Oct. 30, 2009.
BPM for Spectromety development status A. Lyapin.
CENF meeting 5 th February STATUS CE engineering contract running : – phase 1 : tender drawings – phase 2 : execution drawings – Phase 3 (option)
Engineering H191 - Drafting / CAD Gateway Engineering Education Coalition Lect 12P. 1Autumn Quarter Solid Modeling Lecture 12.
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
ICARUS Collaboration Meeting Dec A. Scaramelli.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
1. Road to the EDR 2 Requirements Safety system Transfer line concept Plant concept design Requirements Evaporator concept and performance Transfer line.
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
News about the WA104 Programme C. Montanari – INFN and CERN technical working group meeting, September 16,
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
LBNF 1 LBNF/DUNE – Construction Summary. LBNF Far Site Facilities Scope and Requirements LNG Membrane cryostat is an European technology. CERN has now.
Installation of the T600 at Fermilab Fermilab, February 15,
A.Ryazantsev, IHEP-Protvino, RussiaPANDA Russia Workshop at Moscow, May 2015 Status on Barrel Mechanics Andrey Ryazantsev on behalf of the IHEP-Protvino.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 5 January 2013 LAV construction & installation status.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
T600 Detector FNAL Fernanda G. Garcia Fermi National Accelerator Laboratory.
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Status of the PANDA Solenoid Magnet Production in BINP
Plans for the construction of the new membrane cryostat in bldg 182
LBNF CAD models, Drawings and Component list
Roadmap for triplet cryostats
LEP cryostat Procurement strategy and plans
Cryostat procurement, status and plan, QA/QC
Agenda 9:00  - Welcome ASG speaker 9:10 -  Introduction -       P.Fabbricatore 9:25 - The D2   magnets in HL-LHC   -  E. Todesco.
INSTALLATION SEQUENCE
Cryostat design Mechanical design: Thermal screens: Specifications:
FFAG Magnets and Girders Meeting
EHN1 Neutrino Installation Plans
Far Detector Activities Late 2017 – Early 2018
Update on Junction Box Design
The 11T cryo-assembly: summary of design and integration aspects
TPC Support and Constraint TPC Support
MICE Coupling Coil Update
PLASTIC FORMING PROCRSSES
Status of the PANDA Solenoid Magnet Production in BINP
Status of CO2 Cooling tests at CERN for Pixel phase 1
Status of the PANDA Solenoid Magnet Production in BINP
LARP Phase II Secondary Collimator RC-0 and RC-1
Bunker Wall Design Wall ESS
WA105: Order Status IFAE Thorsten Lux.
Presentation transcript:

WA104 Aluminum Cold Vessels A possible scenario

CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions and geometry). All readout and pipes are assumed to be the one of today. Need to decide on final layout  For the moment (for this discussion) lets assume the layout of the existing ICARUS detector

To be constructed : two cold vessels with these dimensions

Strategy Construction in 6 steps: 1)Prepare all technical specs 2)Produce extruded Aluminum plates and corner plates of limited dimension with a press, move the pieces to an assembly firm 3)Assemble 8 x 20 m long walls with all the required holes and chamfers 4)Transfer the long walls to CERN 5)At CERN assemble the 2 cryostats 1New contract with an engineering firm (we have an offer) 2 & 3 can be the same contract (but not necessarily) 4Transport organized by CERN 5 to be done in bldg 185, contract welding to a firm, assembly with local manpower, contract for QA

2 & 3 Scenario : Extrusion firm produces : 350 basic panels (0.497 width), include spares 95 ml of corner pieces (~5.5 m), include spares Extrusion offer today ~400Keuro Extrusion firm passes the material to a second firm which assemble: 2 x 20m welded floor assemblies + corner piece +chamfers + feet holes 4 x 20m welded walls assemblies + corner piece + chamfers 2 x 20m welded roof assemblies + corner piece + chamfers + feedthrough holes 4 x 4m welded end caps + bolted flange Transport to CERN of the 8 large panels (20m), one/two special transports  1 single contract, 1 single MS + tender : need detailed construction drawings  Advantage : all geometrical parameters well defined (dimensions + planarity + tolerances  To be clarified : end doors assembly

Base material: extruded Aluminum profiles ~ 5.2 euro/kg Corner pieces : 2 x (4 x (4 x 5.5)) ~ kg/ml -> ~ 2.95 Tons ~ 15K+31K= 46 keuro Walls pieces : 2 x (4 x (40 )) ~ kg/m2 ~ -> 168 kg/panel ~ Tons = = 312 keuro m m Total ~ 400Keuro

2 & 3 & 4 Scenario summary : Assembly workshop - panels welding - panels machining To CERN bldg 185 Extrusion Firm

What arrives to CERN (4 pieces/vessel) ?

Step 5 assembly tools

Step 5 assembly step 5.1

Step 5 assembly step 5.2 welding

Step 5 assembly step 5.3 welding

Step 5 assembly step 5.4 welding