SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012.

Slides:



Advertisements
Similar presentations
Clean Water Act Draft Year: 1977 Amendment Years: 1981, 1987 National Adam Tuetken period 6.
Advertisements

LAMP 101 Elizabeth LaPlante US Co-Chair, Superior Work Group US Environmental Protection Agency.
Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
1 Effluent Guidelines for Construction Greg Davis USEPA
Confined Disposal Facilities and In Situ Capping Site characterization / selection Engineering design Operational considerations Contaminant pathways and.
Fox River Cleanup Overview Project Participants  Responsible Parties (RPs) – NCR– Arjo Wiggins / Appleton Papers Inc. – PH Glatfelter– US Mills.
Cleaning Wisconsin’s Waters: From Command and Control to Collaborative Decision Michael Kraft Public and Environmental Affairs UW-Green Bay Prepared for.
Fox River Cleanup Operable Units Fox River Cleanup Total river 39 miles long, OU 2 – 5 is about 13 miles PCB contamination Combined Remedy: Prospective.
Presentation to: Technical Advisory Committee Onondaga Lake.
 Cold Spring is a town in New York State, situated on the Hudson River  To the south of Cold Spring is:  Foundry Cove – a small river inlet  Constitution.
US Army Corps of Engineers BUILDING STRONG ® FOLSOM DAM MODIFICATIONS APPROACH CHANNEL EIS/EIR Major Robert Dion and Cameron Sessions Project Managers.
Partnerships and Processes Landfill Redevelopment.
B ROWN W OOD P RESERVING S UPERFUND S ITE Live Oak, Florida U.S. Environmental Protection Agency Lisa Moore Daniel Stern.
American Public Power Association The Challenge of Building a Coal Plant in Today’s Environment Raj Rao President, Indiana Municipal Power Agency Chairman,
California Integrated Waste Management Board 1 Permitting and Compliance Committee Agenda Item F (Board Item 5) September 8, 2009 Permitting and Compliance.
Water Resources Report Rob Montgomery River Flow & Lake Levels TMDL Study Floodplain mapping revisions Dredging 101.
Dredging, Disposal Management and Impacts on Lake Sediments US Army Corps of Engineers.
Great Lakes Legacy Act: From Remediation to Revitalization Diana Mally, U.S. EPA Great Lakes Office Caitie McCoy, Illinois-Indiana Sea Grant.
Protecting Water Resources: The U.S. Legal Framework Babette J. Neuberger, JD, MPH Associate Dean for Academic Affairs University of Illinois at Chicago.
Cleanup of Uranium Legacy in Southeastern Utah
EPA Office of Water Source Water Protection Initiative Elizabeth Corr, Associate Director Drinking Water Protection Div. Office of Ground Water and Drinking.
Binational Desalination: Past Studies and Present Opportunities Tom McCann Manager, Resource Planning & Analysis June 20, 2008.
Water Resources Development Act WRDA 214 Joy Keniston-Longrie City of Seattle Pacific Northwest Waterways Association, (PNWA) October 2008 US Army Corps.
Scott Surovchak Rocky Flats Site Manager U.S. Department of Energy (DOE) Office of Legacy Management (LM) Cleanup and Remedy Implementation at the Rocky.
Where Complex Challenges Meet Smart Solutions  Technical Services  Packaging  Transload  Transportation  Disposition Rail Transportation of Radioactive,
1 U.S. ARMY CORPS OF ENGINEERS AND ST. JOHNS RIVER WATER MANAGEMENT DISTRICT Indian River Lagoon North Restoration Feasibility Study Public Meeting September.
“Getting the Funding Right” Kim Koleos Juris Doctor, University of Florida.
US Army Corps of Engineers BUILDING STRONG ® 2012 Alabama Water Resources Conference Orange Beach, Alabama September 6, 2012 Beneficial Use Opportunities.
Gerry Pratt State AOC Coordinator, Division of Water New York State Department of Environmental Conservation 625 Broadway, Albany, NY P: 518.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
Agency Coordination: Fraser River Estuary Management Program [FREMP] Georgia Basin/Puget Sound Research Conference 3 April 2003 Vancouver,
Increase Atchafalaya Flow to Terrebonne Governor’s Advisory Commission Meeting 7 August 2013 committed to our coast.
Harbors Module NH1: Authorities and Policies. NH1 - 2 BU ILDING STRONG SM Student Learning Objectives Student will be able to:  Describe the Federal.
CHEMICAL COMMODITIES INC. The History, Cleanup and Ecological Reuse of a Superfund Site 1.
Who We Are What I Do Great Lakes Commission. Great Lakes Basin.
Aerojet Environmental Update Carmichael Town Hall Meeting March 12, 2008 Michael Girard Aerojet Environmental Site Remediation (916)
Great Lakes Perspective Samuel W. Speck Chair, Water Management Working Group Council of Great Lakes Governors Chair, Great Lakes Commission Director,
Western Lake Erie Basin Partnership Presented by: Name, Title Your Organization DATE YOU PRESENTED The Meeting you presented at.
Environmental Dredging of Perfluorochemical-Impacted Sediment from a Sensitive Wetland Mark A. Gaetz (3M) Paul Lear (WRScompass)
Cleanup and Remediation of Persistent Bioaccumulative Toxics in the Great Lakes Basin Gina Bayer, CH2M HILL PBT Strategy Team Maumee Bay Meeting February.
Brownfields: Real Property, the expansion or redevelopment, or reuse of which may be complicated by the presence or potential presence of contamination.
A Combined Solution for Sediment Remediation and Waterfront Development A Combined Solution for Sediment Remediation and Waterfront Development John T.
1 Moab Uranium Mill Tailings Remedial Action (UMTRA) Project Site LTS&M Planning LTS&M Conference Grand Junction, CO November 16, 2010 Donald Metzler U.S.
The Superfund ERA Process. What is Superfund? Superfund was created on December 11, 1980 when Congress enacted the Comprehensive Environmental Response,
State and Tribal Government Working Group November 12, 2008 FERNALD NATURAL RESOURCE DAMAGES SETTLEMENT.
Alternative Sediment Remediation Authorities to CERCLA: Elizabeth River Demonstration Robert Engler Moffatt & Nichol),
Middle Harbor Redevelopment Project WEDA Conference November 5, 2009.
ROCK KOSHKONONG LAKE DISTRICT Lake Dredging Project.
Portland Harbor Superfund Site. Overview of Statutes CERCLA - Federal law –Provides EPA with authority for clean up –Provides for liability, compensation,
Project Update: Hudson River PCBs Superfund Site October 24, 2012 Mr. David King, PE – USEPA Region 2 Mr. Gary Klawinski – USEPA Region 2 Mr. Mark Surette.
1 Atchafalaya River and Bayous Chene, Boeuf, and Black, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting April 13, 2005 Project Manager.
Planning Habitat Restoration for Dredging Projects WEDA Midwest Chapter Conference Green Bay, Wisconsin April 27, 2012 Jack Brunner.
Los Angeles District CERB June 4, 2009 Regional Sediment Management Plan Development throughout California Heather Schlosser Los Angeles District.
City of San Diego’s Recycled Water Study Item W15a October 10, 2012 Presentation to the California Coastal Commission.
1 Calcasieu River & Pass, Louisiana Dredged Material Management Plan (DMMP) Kick off Meeting February 2, 2005 Project Manager Mireya Laigast, Civil Engineer,
CHRYSLER NORTH ASSEMBLY PLANT| PREPARING A SITE FOR EXPANSION William Burkett, R.S., City of Toledo Michael Coonfare, CP, Hull & Associates, Inc. APRIL.
Cleaning up the Lower Fox River Greg Hill, Wisconsin DNR Winnebago Project University of Wisconsin Oshkosh, May 23, 2008.
Beth Kacvinsky - Lead Project Manager Office of Everglades Policy and Coordination March 1, 2016 IRL-S / C-44 Overview.
 Clean Water Act 404 permit  Ohio EPA Division of Surface Water 401 water quality certification  Ohio Revised Code 6111 – Placement of dredged materials.
Beneficial Use of Dredge Materials: Introduction to Dredging and Policy J. Bailey Smith US Army Corps of Engineers April 4, 2011.
GEORGIA PACIFIC WEST PROPOSED INTERIM ACTION Public Meeting & Open House – July 12, 2011.
Rivanna Water & Sewer Authority Presentation to City of Charlottesville Workshop South Fork Rivanna Reservoir (SFRR) Dredging Concept Review May 6, 2008.
Lake Erie Dredge Material: Finding a Solution for Ohio Ohio Brownfield Conference 2016 April 6-7, 2016.
Bayou Verdine Superfund Site
EPA Region 7 Lead Remediation Byrnes Mill Dam and Park
United States Environmental Protection Agency
RESTORING CONTAMINATED SITES TO PRODUCTIVE USE
Michigan Dept. of Environmental Quality Water Resources Division
Introduction EPA is overseeing the RI/FS for the Rolling Knolls Landfill being conducted by several companies under a 2005 administrative order on consent.
BOSTON HARBOR DEEP DRAFT IMPROVEMENT PROJECT
Presentation transcript:

SUCCESSFUL GREAT LAKES DREDGING PROJECTS GOVERNMENT & PRIVATE SECTOR WORKING TOGETHER Joseph HeimbuchRobert Rulede maximis, inc. PIANC USA COPRI ASCE 2012 Dredging Conference October 22 – 25, San Diego, California Presented by: 1

2012 Dredging Conferencewww.demaximis.com PRESENTATION OVERVIEW 1.GREAT LAKES LEGACY ACT 2.ASHTABULA RIVER HISTORY & PROJECT DESCRIPTION PROJECT HIGHLIGHTS 3.OTTAWA RIVER HISTORY & PROJECT DESCRIPTION PROJECT HIGHLIGHTS 4.“TEAMING” BENEFITS 2

2012 Dredging Conferencewww.demaximis.com GREAT LAKES LEGACY ACT GREAT LAKES QUALITY WATER AGREEMENT SIGNED BY THE UNITED STATES AND CANADA – PURPOSE: “RESTORE AND MAINTAIN THE CHEMICAL, PHYSICAL, AND BIOLOGICAL INTEGRITY OF THE WATERS OF THE GREAT LAKES BASIN ECOSYSTEM” THE UNITED STATES AND CANADA AGREED TO GIVE THE “WORST AREAS” PRIORITY ATTENTION 42 “AREAS OF CONCERN” IDENTIFIED BY A JOINT COMMISSION – 25 IN THE UNITED STATES – 12 IN CANADA – 5 IN BINATIONAL WATERWAYS 3

2012 Dredging Conferencewww.demaximis.com GREAT LAKES LEGACY ACT (Continued) GREAT LAKES LEGACY ACT (GLLA) – CONGRESS PROVIDES FUNDING FOR “AREAS OF CONCERN” IN THE UNITED STATES – PROGRAM ADMINISTERED BY THE GREAT LAKES NATIONAL PROGRAM OFFICE (GLNPO) – FOCUS ON “REMEDIAL ACTION FOR CONTAMINATED SEDIMENT” NON-FEDERAL SPONSOR WITH RESOURCES COMMITTED TO THE PROJECT – APPLICATION  PRESENTATION OF PROJECT  REVIEW/ACCEPTANCE  PARTNERSHIP AGREEMENT 2 SIGNIFICANT “AREAS OF CONCERN”: – ASHTABULA RIVER, NORTHEAST OHIO, LAKE ERIE – OTTAWA RIVER, NORTHWEST OHIO, LAKE ERIE 4

2012 Dredging Conferencewww.demaximis.com ASHTABULA RIVER 5

2012 Dredging Conferencewww.demaximis.com ASHTABULA RIVER 6

2012 Dredging Conferencewww.demaximis.com ASHTABULA RIVER: History & Project Description NORTHEAST OHIO – 50 MILES EAST OF CLEVELAND – FLOWS INTO LAKE ERIE AT ASHTABULA, OHIO OPERABLE UNIT OF THE FIELDS BROOK SUPERFUND SITE ASHTABULA RIVER PARTNERSHIP FORMED AS AN ALTERNATIVE TO THE SUPERFUND PROCESS PARTNERSHIP COMPOSED OF USEPA, USFWS, OHIO EPA, USACE, CORPORATIONS, PRIVATE CITIZENS & THE ASHTABULA RIVER COOPERATION GROUP (ARCG) USEPA/GLNPO ACCEPTED APPLICATION FROM THE ASHTABULA PORT AUTHORITY FOR SHARED FUNDING FOR THE CLEANUP OF THE ASHTABULA RIVER RESOURCES FOR THE ASHTABULA PORT AUTHORITY (THE NON-FEDERAL SPONSOR) WERE PROVIDED BY THE ARCG AND THE STATE OF OHIO 7

2012 Dredging Conferencewww.demaximis.com ASHTABULA RIVER: History & Project Description (Continued) PROJECT DESIGNED FOR THE REMOVAL OF 500,000 CUBIC YARDS OF PCB-CONTAMINATED SEDIMENT HYDRAULIC DREDGING EMPLOYED WITH THE SPOILS BEING TRANSPORTED VIA PIPLINE TO AN UPLAND DE-WATERING AND DISPOSAL AREA ADDITIONAL 150,000 CUBIC YARDS OF CONTAMINATED SEDIMENTS REMOVED DOWNSTREAM BY THE USACE UNDER THE WATER RESOURCES DEVELOPMENT ACT (WRDA) CONTAMINATED SEDIMENTS PLACED INTO A TSCA-PERMITTED LANDFILL OWNED BY DE MAXIMIS PROJECT CO-MANAGED BY DE MAXIMIS & USEPA/GLNPO 8

2012 Dredging Conferencewww.demaximis.com ASHTABULA RIVER – PROJECT HIGHLIGHTS CONSTUCTED TSCA LANDFILL IN 112 DAYS – 396,000 CUBIC YARDS OF SOIL EXCAVATED & TRANSPORTED OFF-SITE – 25,000 TONS OF CONCRETE BROKEN, EXCAVATED, TRANSPORTED & CRUSHED – 3,275,000 SQUARE FEET OF LINER (75 ACRES) INSTALLED – 5.3 MILES OF PIPELINE PLACED 3 MILES OF FLOODPLAIN GRADED & MAINTAINED 630,000 CUBIC YARDS OF SEDIMENT DREDGED, TRANSPORTED & DEWATERED IN 336 OPERATING DAYS (9/9/2006 TO 6/18/2008) 1,250,000,000 GALLONS OF WATER TRANSPORTED, TREATED & DISCHARGED BACK INTO THE ASHTABULA RIVER (NO EXCURSIONS FROM NPDES PERMIT REQUIREMENTS) 595 GEO-TEXTILE TUBES UTILIZED 9

2012 Dredging Conferencewww.demaximis.com ASHTABULA RIVER – PROJECT HIGHLIGHTS (CONTINUED) OPERATED 24/7 IN 2006/2007 & 24/6 IN PERSON OPERATING STAFF (45 ON DAYS & 40 ON NIGHTS) 360,000 MANHOURS WITH NO REPORTABLE INJURY 10

2012 Dredging Conferencewww.demaximis.com OTTAWA RIVER 11

2012 Dredging Conferencewww.demaximis.com OTTAWA RIVER 12

2012 Dredging Conferencewww.demaximis.com OTTAWA RIVER: History & Project Description NORTHWEST OHIO – TOLEDO AREA – FLOWS INTO LAKE ERIE AT MAUMEE, OHIO OTTAWA RIVER GROUP (ORG) FORMED TO CLEANUP PCB-CONTAMINATED SEDIMENTS OUTSIDE CERCLA PROJECT STAKEHOLDERS INCLUDE: USEPA, OHIO EPA, USFWS, USACE & THE ORG USEPA/GLNPO ACCEPTED APPLICATION FROM THE ORG FOR SHARED FUNDING FOR THE CLEANUP OF THE OTTAWA RIVER 241,671 CUBIC YARDS OF CONTAMINATED SEDIMENTS DREDGED IN 146 OPERATING DAYS (5/3/2010 TO 10/21/2010) SPOILS TRANSPORTED VIA PIPELINE, DEWATERED IN GEO-TEXTILE TUBES & PERMANENTLY DISPOSED IN A SEPARATORY LINER CELL SYSTEM WITHIN THE CITY OF TOLEDO’S LANDFILL PROJECT CO-MANAGED BY DE MAXIMIS & USEPA/GLNPO 13

2012 Dredging Conferencewww.demaximis.com OTTAWA RIVER – PROJECT HIGHLIGHTS RE-UTILIZATION OF MATERIALS FROM ASHTABULA PROJECT (PIPELINE & WATER TREATMENT SYSTEM) RESULTED IN SIGNIFICANT COST SAVINGS 1,655 CUBIC YARDS DREDGED PER DAY (ON AVERAGE) – CREATIVE CONTRACTING PRODUCED TEAM APPROACH & NO “FINGER-POINTING” 96% TOTAL PROJECT UP-TIME – “LESSONS LEARNED” FROM ASHTABULA INCREASED EFFICIENCY 509,000,000 GALLONS OF WATER SUCCESSFULLY TREATED & DISCHARGED BACK INTO THE OTTAWA RIVER 162,500 MANHOURS WITH 1 SUBCONTRACTOR LOST-TIME ACCIDENT 14

2012 Dredging Conferencewww.demaximis.com OTTAWA RIVER 15

2012 Dredging Conferencewww.demaximis.com “TEAMING” BENEFITS CONTRACT/AGREEMENT BINDS THE “PARTNERS” (NON-FEDERAL SPONSOR & USEPA/GLNPO) OTHER GOVERNMENT AGENCIES HAVE INPUT (USEPA/CERCLA, STATE REGULATORS, USACE & POTENTIAL FEDERAL/STATE NATURAL RESOURCE TRUSTEES) – EMPHASIS ON CLEANUP & RESTORING BENEFICIAL USES – NO PUNITIVE UNDERCURRENT BOTH PARTNERS HAVING A FINANCIAL STAKE FOCUSES THE PROJECT ON SCHEDULE & PERFORMANCE – “STREAMLINING, EFFICIENCY & COST-EFFECTIVENESS” ARE NOT JUST MEANINGLESS WORDS CLEANUPS ACCOMPLISHED SOONER RATHER THAN LATER 16

THANK YOU QUESTIONS/COMMENTS JOSEPH HEIMBUCHROBERT RULE de maximis, inc. Sarasota, FloridaKnoxville, Tennessee MIKE PALMER de maximis, inc. San Diego, California