Close Coupled Bullieds

Slides:



Advertisements
Similar presentations
Woodwork Joints 2.
Advertisements

Sectional Assembly and Installation
Track Cleaning Pads How and what you need to make them. By: Roger von SeeburgArizona Division Meet - Phoenix, AZMarch 7, 2009.
Cap Sewing with HCS-1201 Voyager
Step-by-step assembly instructions
ULTIMATE PORTABLE WORKSTATION Produced by Gavin Weyrich.
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
CORDLESS DRILL WHAT IS IT ? WHAT IS IT USED FOR ? click here
Drills & Drilling Drills & Drilling.
Agricultural Mechanic and Technology Cluster
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Breaking, Measuring, and Adjusting Chain ~The most used drive system on a FIRST robot uses chains and sprockets. Understanding the proper techniques to.
CONSTRUCTION OF A “LITTLE FREE LIBRARY” Gary Mehlum, pressed into service by wife and UHLS employee Mary Fellows (“When you marry a librarian, you marry.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Robot Quick Build Session Frame Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma.
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
Spiral Stairs Assembly Instruction By Laser Dollhouse Designs
Hydraulic Digger Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
Pneumatic Arm Assembly Instructions
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
L.C. Technology ROBOT ASSEMBLY. Base Assembly BASE File off raised tabs on each side of Servo. Place Servo in vice between Fibre Clamps. Raised Tabs Repeat.
PXL insertion 1.PXL Insertion Steps after PXL installation system is aligned 2.PXL removal steps 3.Some design details 2/3/20131 Table of contents:
Pneumatic Arm Assembly Instructions. Contents of Pneumatic Arm Kit Wooden pieces (⅜” cross-section): 1 X 24”; 1 X 21⅛”; 8 X 7½”; 4 X 7⅛”; 4 X 7”; 2 X.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
TOOL: Radial Arm Saw NEXT STEP: Radial Arm Saw RESULTS: Finish Top Apron Pieces at 9” L x 4” W x ¾ “ Th PROJECT Square Plant Stand PART Top Apron # NEEDED.
Lathe and drilling machines
Mantle Clock. Beginning Steps Cut 2 piece 20 x 5 to make the 2 sides and top/bottom Cut 1 10 ¾ and 1- 9 from each 20 piece. This will make a side and.
Replacing board in CLAP Tools: Flashlight (torch for those of you in Cape Town)) small philips screwdriver spacer tool* dish to hold screws 2 rolls of.
Putting a Branchlines Gearbox & Mashima Motor into a Bachmann Std 5 73xxx Steve Wallis.
2006 Hand and Power Tool Safety Basic Rules for Rube Goldberg Competition,
LATHE OPERATIONS The various operations that can be performed on a lathe are: Turning. Step turning. Taper turning. Thread cutting. Facing. Knurling Chamfering.
Lathe and drilling machines
Setting Out Joiners Rods “extracts from Practical Australian Carpentry” M. S. Martin Original 2005 Revised 2008.
Control System and Electrical Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Percussion drilling By Batch -2. Percussion drilling Cable Tool Drilling Percussion drills have been used to drill thousands of feet, though they are.
Module-6 Drilling.
Framed Canopy Fitting Instructions Contents – 6- Angled frame fixing brackets 1 x handle pack 6 x self drilling tech screws 3 keys 1x door 6 x coach screws.
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Notes on Converting 3 Rail Locomotives to 2 Rail Operation By Joe Foehrkolb Baldwin Forge & Machine Baldwin, Maryland.
This is what we want to draw Extrude Mirror Round Edges.
Make a Gas Cylinder Cooker. © G. Norris 2011 Copyright This document and the information contained within is copyright to © G. Norris Reproduction.
Helmet and shoulder pad removal for boarding purposes. Important to remember there are various types of helmets out there so be aware of what your team.
23rd ANNUAL BATTERY CAR RACE FEB. 27,2015 BY: Homer Johnson & Sammy Smith (Ingomar Middle School) (Picture of car here) Car Name: THE ROAD RUNNER.
Wheels and Axles Model Assembly Instructions copyright Mechanical Kits Ltd
Setting up correctly Different types and their use
Year 8 Fuse Tester Design & Technology PCB Information Fixed value resistors 470R = Yellow, Purple, Brown This component is soldered directly onto the.
ELECTRIC VEHICLE PROJECT CAR BUILDING PROCEDURES BY: PIERRE PEASHA CENTENNIAL HIGH SCHOOL BAKERSFIELD, CA.
Parts of the Bernina 240 Sewing Machine Dalton- Clothing Instructions: Please go through The Parts of the Sewing Machine and explore each part on your.
Level 1 Diploma in Plumbing Studies © 2013 City and Guilds of London Institute. All rights reserved. 1 of 23 PowerPoint presentation Preparation techniques.
Level 1 Diploma in Electrical Installation © 2014 City and Guilds of London Institute. All rights reserved. 1 of 13 PowerPoint presentation Stripping and.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Potting Bench Plans Matt Howell Brooks County High School Quitman, Georgia Quitman, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
VIEW SERIES with Sliding Door
What is TETRIX? If you can dream up a robot design, you can build it with the TETRIX Robotics Design System.
Installation Walkthrough Image Guide
INSTALLING BYRNE POWER BOX INTO FLEX SYSTEM
Step-by-step assembly instructions
2.2 Gallon TourTank Installation
Motion STARTER Parts list Quick task: Discuss in pairs all the parts shown. Agree the function each of these parts for the Tumbler motion, and write your.
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Step-by-step assembly instructions
Crumble PowerPoint 4.
Step-by-step assembly instructions
Step-by-Step Assembly Instructions – Cube Version
Step-by-step assembly instructions
Step-by-step assembly instructions
Presentation transcript:

Close Coupled Bullieds Using Symoba Close Coupler NEM Pockets & Hornby Roco style couplings

Bachmann Bullied Coaches A useful if not unavoidable default item of rolling stock on any late Southern Railway or BR (S) layout for the steam era of late 1940’s to the late 1960’s. I think it fair to say that the model is now a little dated when compared to the Hornby Maunsell or Bachmann BR Mk 1 carriages widely available. Perhaps the most dated feature is the lack of close coupling of these carriages, hence this series of slides showing in very basic terms how to install a close coupling system.

Symoba Couplings Recently imported from Germany by DCC Supplies are the new Symoba close coupling system items. At the heart of the system is a miniature mechanism that extends a post when pushed off the default centre position to the left or right. Unlike other systems that have been in place for a while as an after market addition, this system is very small in size, with a base that measures only 11mm x 12mm.

Symoba Couplings Added to the posts are various types of NEM coupling pockets, allowing you to use the coupling of your choice. I elected to use Hornby’s Roco style of coupling that are supplied with some of their rolling stock as an alternative to the traditional Tension Lock coupling used extensively in the UK. Shown below are the short, offset and long pockets that will perhaps be the most popular for the 00 modeller.

The Surgery Unfortunately surgery is unavoidable when instilling the system on the Bullied carriages due to the close proximity of the carriage floor to the bogie wheels. Start by removing the bogie retaining screws, and then lifting the bogies from the boss.

Bogie Surgery The moulded on tension lock couplings will have to be removed to make way for the Symoba unit’s. I removed mine with a pair of side cutters.

Surgery tools This has to be the decision of the surgeon, however I used a cheap B&Q copy of a Dremel tool with a flexible drive. I used a burr or rotary file for the following stage of surgery.

Removal of bogie frame material Most of the remaining cross member of the bogie chassis has to be removed (unless you want to settle for a gap between the carriages). Excess material removed

Remove the body from the floor. The body is secured to the carriage floor by 6 lugs, pull the sides of the body outwards at the base to extract the floor. In other words unclip the body from the floor.

Savage surgery! If you are using a similar tool to mine you will need to change the tool bit to a miniature circular saw.

Cutting the carriage floor. Depending on the type of coupling you are going to use, you need to try to get the centre of a coupling head level with the furthest extremity of the body, in this case the corridor connection. If like me you use the Hornby Roco style of coupler, measure 17mm from the end of the chassis floor, this will place the coupler in the desired position. Be aware of the two moulding lines that run along the length of the floor and cut between the two lines as shown.

Floor Surgery The Symoba coupling mechanism is 11mm long so place a further cut 11mm from the first cut towards the end of the floor. Again between the two moulding lines, as shown.

Final cuts. The next two cuts are obvious, but cut 1-2mm inside the moulding lines between the first two cuts, as shown.

Tidy up the cuts. Using a scalpel tidy up the sawn out square hole until you have a 12mm wide by 11mm long oblong hole. It is very important that the square post of the mechanism is central to the longitudinal axis of the floor, so proceed carefully and keep checking the mechanism to the hole until it just fits in position. Glue it place, I used the excellent Deluxe materials Plastic Magic, but an epoxy resin would be an alternative.

Mechanism in position. Glue both sides of the floor, if you (like me on one occasion!) have made a hole a little on the large side you can either fill with epoxy resin or use some of the plastic shavings and dissolve them in place with Plastic Magic.

Rebuild the carriage Replace the floor in the coach body and reattach the bogie or bogies if you have done both ends (you might elect to only do one end of a carriage at the end of a rake of carriages?). I used the short NEM pockets to attach to the posts of the mechanisms.

Setting the pocket height Using the Symoba pocket height setting guage position the pocket onto the post. I found that invariably (+/- 0.5mm) that the position of the underside of the pocket is 4mm up from the bottom of the post. However you should check the position with the height gauge and the measure once in position, remember this measurement! You have to remove the pocket and clip in the Hornby Roco coupler, and then reposition the pocket and coupler to your remembered position. If you use the offset or long pockets you can just place the coupling head into the pocket without removal, however you would have to move the mechanism nearer to the bogie pivot boss, and perform extra surgery on the bogies as a consequence.

The 4mm from the bottom of the post…. .. to the underside of the pocket

The Symoba height gauge Placed on the rails….

The height gauge in use

The finished effect… I run a mixed Bullied/ Maunsell set and a mixed Bullied /BR Mk 1 set, and am extremely pleased to say that the modified Bullieds run just as smoothly as the Hornby Maunsells or the Bachmann BR Mk 1’s.