October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) SMC E U CARD WP7 HFM S TATUS UPDATE MEETING O CTOBER 2011 J.C. Perez.

Slides:



Advertisements
Similar presentations
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Advertisements

3nd KEK-CEA Workshop on Superconducting magnets and cryogenics for accelerator frontier - 24/03/2009 Ceramic insulation for Nb3Sn accelerator magnets F.Rondeaux.
Mikko Karppinen Nb3Sn Coil Production for 11 T Dipole Model Magnets.
11 T Dipole for DS Status of CERN Activities M. Karppinen CERN TE-MSC On behalf of B. Auchmann, L. Bottura, B. Holzer, L. Oberli, L. Rossi, D. Smekens,
1 LARP Magnet Program G. Ambrosio Many slides from (with a few modifications): Jim Kerby for the LARP Magnet Collaboration 25 October 2006 Rad-Hard Insulation.
EuCARD-HFM ESAC review of the high field dipole design, 20/01/2011, Maria Durante, 1/40 EuCARD-HFM ESAC Review of the high field dipole design Fabrication.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
EuCARD’13, Progress--HFM, 11 th June 2013, GdR 1 Progress in EuCARD and plans for EuCARD2 Gijs de Rijk 11 th June 2013 CERN.
Eucard WP 7.3 HFM Winding and tooling tests Insulation choice F.Rondeaux /01/2011 Dipole design review- II-8 Winding and tooling tests – insulation.
October 30 th Advances in Heat Transfer in High Field Accelerator Magnet B. Baudouy CEA/Saclay - Dapnia/SACM Annual meeting CARE October.
Workshop on Beam losses, heat deposition and quench levels for LHC magnets, Geneva, 3-4 March 2005 Liquid helium heat transfer in superconducting cable.
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
SMC Plans for new SMCs for Fresca2 program J.C. Perez EUCARD-WP7-HFM Short Model Coil review 12 December 2011.
Eucard-WP7-HFM 10 th Collaboration Meeting at LASA Milano Status on SMC & RMC Models J.C Perez on behalf of SMC/RMC collaboration team.
FReSCa2 Technical Review, 9 th June 2015, CEA Saclay FReSCa2 Technical Review June 2015 CEA Saclay J.C Perez on behalf of Fresca2 collaboration team.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
SC magnet developments at CEA/Saclay Maria Durante Hélène Felice CEA Saclay DSM/DAPNIA/SACM/LEAS.
CERN/CEA Collaboration agreement No. KE2275/TE WP4 – Nb 3 Sn technology development Pré-Kick-off meeting 03/07/2014.
NED Project P. MANIL – CEA/IRFU/SIS – Short Model Coils meeting #18 – 25/01/2008 – slide 1/18 SHORT MODEL COILS PROGRAM SMC meeting #18 Pierre MANIL CEA/IRFU/SIS.
Eucard-WP7-HFM 9 th Collaboration Meeting at Warsaw University of Technology Status on SMC & RMC Models J.C Perez on behalf of SMC collaboration team.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
HFM High Field Magnet, Engineering Design, 20/01/2011, Pierre Manil, 1/24 EuCARD-WP7-HFM ESAC Review of the dipole design Engineering Design Pierre MANIL.
1 Short Model Coils George Ellwood, Simon Canfer Jan 08.
Helene Felice 11/16/2011 LARP Collaboration Meeting 17 1 st HiLumi Collaboration Meeting CERN Status on HQ Coil Design and Fabrication.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
Outline: Main characteristics of the FRESCA2 cable Main characteristics of the strand Strand stability, an issue to avoid magnet quench at low field Procurement.
LARP Magnets FNAL contribution to LARP (LHC Accelerator Research Program) FNAL core-program support to LARP DOE Annual Program Review - May 16-18, 2006.
Superconducting Magnet Group Superconducting magnet development for ex-situ NMR LDRD 2003 Paolo Ferracin, Scott Bartlett 03/31/2003.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
AccNet-HE, , Magnet R&D Eu, GdR Joint Snowmass-EuCARD/AccNet-HiLumi LHC meeting 'Frontier Capabilities for Hadron Colliders 2013’ February.
FRESCA2 Technical Meeting 5-Validation of coil winding with Cu coils Françoise Rondeaux 09/06/ CEA-Irfu-SACM-LEAS - 5-Rondeaux- FRESCA2 Technical.
Dipole review, January Dipole design review: outlines of talks Gijs de Rijk, Francois Kircher and Jean- Michel Rifflet.
11 T Dipole Project CERN Status M. Karppinen 11 T Management meeting 1 July 2013.
Task 6: Short Period Nb3Sn Superconducting Helical Undulator George Ellwood
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
Fresca2 Technical meeting, 9 th june 2015, Gdr, relevance for FCC 1 Relevance of SMC/RMC/Fresca2/Inserts for FCC Gijs de Rijk 9 th June 2015 CEA Saclay.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
ESAC R EVIEW OF THE HIGH FIELD DIPOLE DESIGN R EACTION O VEN, S PLICING AND IMPREGNATION M ARCH 2012 FOR E U CARD-WP7-HFM J.C. Perez on behalf of SMC collaboration.
29 th September 2009 EuCARD-WP7 HFM Conductor specification and procurement Luc OBERLI CERN, TE-MSC-SCD.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
CERN/CEA Collaboration agreement No. KE2275/TE WP5 – HTS insert Meeting 04/09/2015.
KEK-CEA Superconducting Magnet Co-operation Program The FJPPL workshop LAPP, Annecy-Le-Vieux (France), June LHC-3 Superconducting Magnets.
J. Polinski, B. Baudouy -The NED heat transfer program at CEA CEA Saclay, January 11th NED heat transfer program at CEA NED heat transfer program.
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
HFM High Field Magnets, Search on documentation, 29/09/2009, Pierre Manil, 1/6 HFM Search on documentation related to the project Pierre MANIL CEA/iRFU/SIS.
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
TE-MSC-MDT. FTEC Follow-Up Meeting Juan Carlos Perez TE-MSC-MDT Jose Ferradas TE-MSC-MDT 28/04/2016.
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
P. Ferracin on behalf of the MQXF collaboration
TQS Overview and recent progress
Status of the manufacturing process of a Nb3Sn wiggler prototype
11 T Dipole Integration & Plans M. Karppinen
ESAC Review February 2013 CEA Saclay
J.C. Perez on behalf of SMC collaboration team J.C. Perez
CERN Conductor and Cable Development for the 11T Dipole
CEA KE 2775 progress meeting WP3 – FRESCA 2 Magnet
FRESCA2 Update on the dipole design and new calculations
Mechanical stability and QXF coil winding
P. Ferracin and G. Ambrosio
the MDP High Field Dipole Demonstrator
SMC Design overview of the construction and project issues
Paolo Ferracin, Giorgio Ambrosio
MQXF updates P. Ferracin October 9th, 2014.
Presentation transcript:

October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) SMC E U CARD WP7 HFM S TATUS UPDATE MEETING O CTOBER 2011 J.C. Perez on behalf of SMC collaboration team J.C. Perez on behalf of SMC collaboration team M. Bajko, B. Bordini, S. Canfer, G. Ellwood, J. Feuvrier, M. Guinchard, C. Kokkinos, P. Manil, A. Milanese, L. Oberli, F. Regis, G. De Rijk

October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) OUTLINE 2  Introduction  SMC configuration  SMC1 assembly & cold tests results  Coil fabrication at CEA-Saclay for SMC2  SMC3_a assembly & cold tests results  Future planed activities

October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) SMC I NTRODUCTION 3  The SMC project started in 2007 as a CERN-CEA-RAL-LBNL collaboration (NED 1.5).  A way to test Nb 3 Sn cables in a small racetrack magnet and reach 12 T on the cable.  SMC started as a copy-paste of the LBNL subscale model.  SMC has been used to cross-check results using different codes formulations(CAST3M, ANSYS, ROXIE, Vector fields OPERA)  The fabrication of the initial mechanical parts has been followed by CEA  Several coil configurations should be produced in the different laboratories and cold tested in the common structure at CERN  SMC is a tool to test and validate different types of cable, cable insulation, electrical insulation methods for central post and end-spacers, impregnation methods, winding procedures…

October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) A SSEMBLY C ONFIGURATION 4 Overview- Assembly Parts Acronyms Explanation J Strain Coil Packs Connectors V-Pad Vertical Pad H-Pad Horizontal Pad VK Vertical Keys HK Horizontal Keys Bl Bladders R Rods Y Half Yoke Gap Keys Gap Yoke. x Current Flow Direction

October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) SMC1 A SSEMBLY P ARTS 5 Assembly Parts Coils & Rods Shell & Yoke Pads Bladders Keys Shims Assembly Overview Connection Side Non-Connection Side

October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) C OIL FABRICATION FOR SMC1 6 2 double pancakes CERN in collaboration with RAL using “Low performance” cable (14 x Ø1.25 mm Alstom IT with low Jc from NED) Cables insulated with S2-Glass tape wrapped with 50% overlap Coils RAL in Coils instrumented and RAL in collaboration with CERN Coil #1 made in November Coil #2 made in March 2010

October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva)

October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) C OIL F ABRICATION AT CEA-SACLAY FOR SMC2 8  Coils wound with PIT EAS 14 x Ø1.25 mm strand  Cable insulation made of 2 layers of Hiltex S2-Glass tape + ceramic precursor (CEA formulation).  Cable wrapped at CERN in June 2010 and first coil wound at CEA in July  Construction abandoned: ceramic insulation too brittle

October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) C OIL F ABRICATION AT CERN FOR SMC3_ A 9  2 coils for SMC3 with PIT 14 x Ø1.25 mm strand with Ti- islands and spacers wound in November 2010  Cable insulated with S2-Glass sleeve (FNAL type)  Electrical insulation of the central island on the layer jump area with ceramic 989F  Heat treatment in a vacuum CERN  Coils potted using Epoxy MY 750 & Jeffamine D-400  Magnet assembled in May 2011  Cold powering tests performed in the new vertical test station (SM18) in June 2011

October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) SMC3_ A C OLD T ESTS R ESULTS 10 Courtesy of M. Bajko

October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva)

October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) F UTURE A CTIVITIES C OIL FABRICATION 12  2 coils for SMC3_b with PIT 14 x Ø1.25 mm strand and coated end-spacers(Q3_2011)  1 coil for SMC7_a with OST RRP 40 x Ø0.7 mm strand 11 Tesla dipole type (Q1_2012) Outside EuCARD  2 coils for SMC4 with PIT 18 x Ø1.0 mm strand to be wound at CERN (Q1_2012)  1 coil for SMC5_a with PIT 40 x Ø1.0 mm strand, FRESCA2- type cable (Q2_2012) SMC5_b in case 5_a is unsatisfactory  1 coil for SMC6_a with PIT 40 x Ø1.0 mm strand (FRESCA2- type cable) to be wound in collaboration CERN/RAL (using coated islands, braided glass fibre, Cyanate Esther, Q3_2012) SMC_5 & SMC_6: necessity for a new structure under study

October/7/2011 J.C. Perez TE-MSC-MDT EuCARD WP7-HFM Collaboration Meeting (Geneva) F UTURE A CTIVITIES 13  Electrical insulation method for central islands and end spacers to be investigated  Cable insulation to be improved: S2-Glass tape, braided glass fibre, S2 Glass sleeve...  Cyanate Esther impregnation to be tried  Coil fabrication using “ceramic binder” to be tried  FRESCA2-type cable (SMC5) using final cable, insulation and impregnation method to be used for the real magnet to be built Thanks for your attention