Mass Highway Department (MHD) Design Process Anticipate possible use of MHD funds Anticipate possible use of MHD funds New Design Guide for Project Development.

Slides:



Advertisements
Similar presentations
Metro Muncipal Agreement Program
Advertisements

Bob Vasek Cooperative Agreements Engineer Mn/DOT Metro State Aid Overview and Planning and Programming Tom Leibli Cooperative Agreements Project Manager.
ODOT Structure Project Management Seminar Bridge Preliminary Design Report.
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Neighborhood Meeting No.2 Golden Gate Bridge, Highway and Transportation Districts San Francisco Mid-Day Bus Parking Facility Contract No BT-1 March.
JTC Project Design Subcommittee Pavement Preservation Projects At Pioneer Valley Planning Commission February 25, 2009 Prepared by MassHighway D2.
3-1 Utility Conflict Identification and Management Lesson 3.
LIGHT RAIL PERMITTING ADVISORY COMMITTEE COMMITTEE MEETING Dec. 17, 2014|3:00PM -5:00PM | ROOM 1E-113.
Alternative Project Delivery
Before you start: Delete this slide once finished NOTE FOR ENTIRE POWERPOINT: For accessibility compliance, each document should have a title, which can.
December 12, 2013 Glenn's Bay Road Widening and Interchange Project.
ACEA Annual Conference PERDIDO BEACH RESORT ORANGE BEACH, AL MAY 12-13, 2015 TRAFFIC COUNTS AND RAILROAD AGREEMENT REQUIREMENTS BRAD LINDSEY, P.E. & ADAM.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
AGENDA  PROJECT HISTORY  NORTHERN SECTION UPDATE  SOUTHERN SECTION OVERVIEW  INTERCHANGES  PROJECT SCHEDULE  UPCOMING ACTIVITIES  OPEN DISCUSSION.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Highway 169 Phase 2 (Part 2) – Cross Range Expressway April 30, 2014 Public Information Meeting Taconite Community Center.
Intersection & Interchange Geometrics (IIG) Innovative Design Considerations for All Users Module 8 Intersection- Interchange Evaluation Process.
26-FEB Project Controls Requirement ABP Update Through January 19, 2010 the MassDOT Accelerated Bridge Program has advertised 73 construction projects.
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
N. Burleson St. – Status Update I. Typical Sections & Pavement Design II. Budget and Preliminary Cost Estimates III. Schedule S EPTEMBER 16, 2014.
ADOT Multimodal Planning Division Planning Assistance for Rural Areas (PARA) Program Overview December 4, 2013.
Brio Rapid Transit System Update on Stations and Timetables July 10, 2012.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
Model Home Permitting and Temporary Certificates of Occupancy Orange County BCC August 25, 2015.
Local Government Section Welcome Marty Andersen ODOT Local Government Section 355 Capitol Street NE, Rm. 326 Salem, Oregon Ph:
CE 550 ADVANCED HIGHWAY DESIGN  Thomas B. Stout, Ph.D., P.E. B.S.E., Sacramento State College, 1971 M.S., University of Nebraska, 1992 Ph.D., Iowa State.
OREGON DEPARTMENT OF TRANSPORTATION Practical Design Decision Matrix.
HIGHWAY DEPARTMENT Tim G. Schulte, P.E. Richland County Engineer.
VI. Developing a VSMP Program General Stormwater Training Workshop.
1 Accommodating Utilities in Highway Rights-of-Way Federal Agency Update IRWA/AI Conference Las Vegas, NV January 13, 2009.
Request for Environmental Services (RES) Missouri Local Programs How to Complete The Request for Environmental Services.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
MDOT ACTT WORKSHOP UTILITIES/ RAILROAD COORDINATION Final Presentation.
2012 ACEA MEETING ORANGE BEACH Brad Lindsey, P.E. Assistant State County Transportation Engineer – Pre Construction Alabama Department of Transportation.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
Planning & Community Development Department Zoning Code Amendment Public Hearing Proposed elimination of the 50% review step from the design review process.
Portola Middle School and Gompers/Leadership Public Schools OPSC Funding Status Update.
Locally Administered Federal-Aid Project Initiation Workshop Project Scoping John Condon & Mike Barry November 14,
Salt Lake City – Las Vegas High Speed Rail – Alignment Study Student Engineering Associates.
D.d. delivers district department of transportation d.d. delivers FAISAL HAMEED RONALDO T. NICHOLSON. P.E. Innovative Project Delivery Processes Innovative.
Public Involvement How to Plan and Conduct Effectively Presented by the Ohio Department of Transportation’s Office of Environmental Services.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
Federal Lands Highway Commitment to Excellence Environmental Concerns with Estimating TEA/TUG Conference Portland, Maine October 2006 Jack Van Dop Eastern.
HIGHWAY DESIGN PROCESS & ROUTE LOCATION Spring 2016.
ROAD CONSTRUCTION COSTS Key Concepts. Types of Main Road Works Routine Maintenance Works are day-to-day running repairs, e.g. Potholes, depressions, crack.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
CE 453 – HIGHWAY DESIGN  Thomas B. Stout, Ph.D., P.E. B.S.E., Sacramento State College, 1971 M.S., University of Nebraska, 1992 Ph.D., Iowa State University,
Project Briefing for BROOKS BRIDGE REPLACEMENT STUDY and SANTA ROSA SOUND ALTERNATE CROSSING STUDY April 2015 SPEAKER: BOB.
The Project Concept Phase - Concept Report Requirements Presented by the Georgia Department of Transportation Roxana Ene – LCI Coordinator
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
BROOKS BRIDGE REPLACEMENT STUDY February 18, 2016 Project Briefing for Presenters: April Williams, P.E. (FDOT Project Manager) Steve Schnell, AICP (HDR.
District 6.  Workload Beyond Normal Program  Accelerated Project Schedules  Additional Funding  Technical Expertise Not Available In Department.
1% Sales Tax Commission Board Meeting June 3, 2015.
Dave Adamson Design Network launched 2 years ago Had many good ideas Discipline tracks Activity ownership Milestone meetings Promised “Not Static”
Community Crossings Matching Grant Fund Program Kathy Eaton-McKalip
City of Snoqualmie Tokul Roundabout Project April 10, 2012.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Transportation Engineering Business Development Workshop Department M
Issaquah-Fall City Road
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
Department of Environmental Quality
General comments: These projects are locally owned and the LPA should be involved and informed throughout the project. The project agreement is between.
Walker Street Reconstruction Project 25% Design Public Hearing
HIGHWAY DESIGN PROCESS & ROUTE LOCATION
Presentation transcript:

Mass Highway Department (MHD) Design Process Anticipate possible use of MHD funds Anticipate possible use of MHD funds New Design Guide for Project Development (January 2006) - New Design Guide for Project Development (January 2006) - Flexibility Flexibility Community Context Community Context Multi-Modal Transportation Multi-Modal Transportation Transparent and Clear Project Development Guidelines Transparent and Clear Project Development Guidelines Articles 9 & 10, #7

MHD Design Steps Identification of project need Identification of project need Project planning Project planning Project initiation Project initiation Environmental/Design/ROW Process Environmental/Design/ROW Process Programming Programming Procurement Procurement Construction Construction Articles 9 & 10, #8

Design/Environmental/ROW Articles 9 & 10, #9

MHD 25% Preliminary Design DESIGN DESIGN Survey data Survey data Base (existing conditions) plans Base (existing conditions) plans Typical cross sections, horizontal & vertical geometrics Typical cross sections, horizontal & vertical geometrics Sketch plans for bridges, tunnels & landscaping Sketch plans for bridges, tunnels & landscaping Develop preliminary cost estimate, functional design report Develop preliminary cost estimate, functional design report ENVIRONMENTAL DOCUMENTATION AND PERMITTING ENVIRONMENTAL DOCUMENTATION AND PERMITTING Local Agency Coordination, MEPA/NEPA Local Agency Coordination, MEPA/NEPA Preliminary resource area applications Preliminary resource area applications PUBLIC OUTREACH PUBLIC OUTREACH Early coordination Early coordination MHD Review of 25% design MHD Review of 25% design MHD Public Hearing MHD Public Hearing 25% Design Approval by MHD 25% Design Approval by MHD Articles 9 & 10, #10

MHD 75% Final Design Refine horizontal and vertical geometry Refine horizontal and vertical geometry Subsurface exploratory plan Subsurface exploratory plan Construction cross-sections and plans Construction cross-sections and plans Traffic management plan Traffic management plan Pavement design Pavement design Drainage design Drainage design Utility relocations Utility relocations Construction plans and details Construction plans and details Update cost estimate Update cost estimate Complete environmental permitting Complete environmental permitting MHD Review of 75% design MHD Review of 75% design 75% Design Approval by MHD 75% Design Approval by MHD Articles 9 & 10, #11

MHD 100% Design and PS&E Develop traffic control agreement with Town Develop traffic control agreement with Town Finalize construction plans Finalize construction plans Finalize cost estimates Finalize cost estimates 100 Percent Plans, Specifications, and Estimate submittal 100 Percent Plans, Specifications, and Estimate submittal Articles 9 & 10, #12