GLAST LAT ProjectFace to Face Managers Meeting 04/14/04 4.1.9 - Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.

Slides:



Advertisements
Similar presentations
GLAST LAT Project Managers F2F Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test April.
Advertisements

GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST Large Area Telescope - OperationsDOE Review, 15 June GLAST Large Area Telescope Operations Review Rob Cameron Instrument Science Operations.
GLAST LAT ProjectLAT Operations Planning, 23 March GLAST Large Area Telescope LAT Operations Planning 23 March 2005 Rob Cameron
GLAST LAT Project Integration and Test SVAC Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review SVAC Peer Review July 21,
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
GLAST LAT Project 1 Tracker “mini-tower” Full Size Calorimeter module Face to Face IDT meeting March 20, 2002 Convener: E. do Couto e Silva Engineering.
GLAST LAT ProjectOnline Roadmap Progress Report – April 22, 2004 R. Claus1 Online Roadmap to the July 2004 Freeze Progress report for April 22, 2004 (to.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Management 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting Management March 9th,
GLAST LAT Project Technical/Cost/Schedule Review 03/31/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Section Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review 7.2.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project Technical/Cost/Schedule Review 09/01/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 1 Gamma-ray Large Area Space.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project LAT Monthly Apr SAS 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope WBS 4.1.D SAS LAT Monthly Managerfest.
GLAST LAT Project 1S. Ritz Purposes of the Data Challenges “End-to-end” testing of analysis software. –define the ends –define the tests (what is success?)
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
GLAST Large Area Telescope:
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project Technical/Cost/Schedule Review 04/26/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT Project Integration and Test IFCT Peer Review 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
LAT Instrument Test Data Analysis in Context
I&T&C Organization Chart
Mechanical Integration
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope:
Integration and Test Organization Chart
GLAST LAT System Engineering
LAT Environmental Test Planning and Design Review
Introduction and Overview
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope: Deputy for Systems Engineering
Presentation transcript:

GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers Meeting, April 14th, 2004 Elliott Bloom SU-SLAC Subsystem Manager Gamma-ray Large Area Space Telescope

GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 2 IFCT Role in Functional Tests (Larry W.) IFCT is responsible for helping to design/define and implement I&T functional tests on the subsystem and LAT level (see Pat’s presentation) with major input to LAT-MD The test scripts used in the functional testing will actually be implemented by the I&T online department with guidance from LAT-MD and IFCT. The test scripts will be placed under configuration control by I&T online. The test procedures will be owned and configuration controlled by IFCT. All I&T testing of flight hardware will be performed by IFCT department electrical technicians and engineers who have been trained in their use. IFCT will need major assistance from the subsystems in helping to interpret the results of the tests (pass/fail with report). Particularly, in the case of fail (see SVAC role slide 4).

GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 3 ACD –2,200 hours for checkout/testing/support. (1 man year) Calorimeter –1.5 FTE's (not continuously?) and travel expenses for Calorimeter I&T Support. DAQ –700 hours for hardware I&T support. (4 man months) Flight Software –1,800 hours for software I&T support. (10 man months) Mechanical –?? SAS – ?? Tracker –2 FTEs (Subsystem scientists) (3 man years) –Hiro Tajima, Johann Cohen-Tanugi (SLAC) (3 man years) Subsystem Support of I&T after Delivery From 7/04 – 1/06 ?

GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 4 SVAC LAT Build Data Analysis Role (Eduardo) There are two SVAC data analysis efforts that support the LAT build and test and both use the same test data –Analysis of “Pass/Fail” test data of the flight hardware relative to an established baseline (See previous manpower chart slide 3). –Determine hardware baseline and calibrations –Results due with hours or, at most, a day (TBR) –I&T, SAS and Subsystems effort, e.g., CPT test offline. –Analyses of data from the flight instrument in various stages of completion, which assume a well understood baseline and calibrations (LAT wide collaboration effort). –Uncover subtle hardware problems –Apply SAS reconstruction algorithms to real data –Results due in 2 to 3 weeks after data taking (TBR).

GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 5 I&T/SVAC Department Meetings (Eduardo) Date : Weekly (Friday) Location : SLAC, Group C conference Room, B84 Goal : Prepare for data analysis of pass and fail tests and instrument data analysis. (Working meeting, those interested in contributing are welcome.) –PASS/FAIL tests –Review plots from subsystems to evaluate if changes are necessary for tests at the integrated level. –Scheduled a meeting on April 30 between I&T (SVAC and Online), SAS and ISOC to discuss monitoring of parameters during integrated tests and details of implementation and present SVAC tool to monitor offline calibrations. –SAS recon analysis may not be required at this level but we may use SAS code for digitized data (TBR) –I&T driven effort –Instrument test Analysis –LAT Collaboration effort. See next slides –Infrastructure necessary –SAS Data pipeline (OPUS), MC and GlastRealease –Data analysis code to estimate run time needed during data taking –Offline Report generation – We were given no requirements so far –Tool to compare offline results - We were given no requirements so far.

GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 6 SVAC Instrument Analysis Workshop 1 SVAC Instrument Analysis Workshop 1 Date : June 7 (Monday) and 8 (Tuesday), 2004 Location : SLAC, June 7 (ROB C&D), June 8 (TBD) Goal : Prepare for data analysis during LAT build and testing. –Produce MC datasets with two-towers in a grid at different configurations to –Validate geometry implementation –Create datasets for data analysis –Recommend data set sizes based on MC studies –Define and assign tasks to participants to –Evaluate if there are modifications necessary to the reconstruction –Evaluate if there are modifications necessary to the analysis (merit) ntuple –Create reference plots for different configurations –Define infrastructure necessary for –Data pipeline (OPUS) –Report generation –Comparison of results

GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 7 Instrument Analysis Workshop 2 Instrument Analysis Workshop 2 Date : Early July 2004 (TBD, depends on IRR) Location : SLAC Goal : Evaluate MC results and implement changes needed for data analysis of LAT data obtained during various stages of the build and testing. –Evaluate results and regenerate MC datasets if necessary –Suggest modifications for data analysis tests with real data and flight hardware –Work with I&T to evaluate if the data set sizing is –adequate to understand the instrument –and if collection times fit the LAT build and test schedule. –Define what analyses will be done during the build sequence. –The plan is to have data taking with 1,2,4,6,8,10,12,14,16 towers and 16 towers with ACD. –Define infrastructure needed for full LAT analysis

GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 8 Interdependencies: subsystems, LAT office and/or project office. Completion of LAT-MD “LAT Performance and Operations Test Plan” Input on specific processes/procedures for integration (subsystems). EGSE deliveries from Electronics (see following chart). Tracker Mechanical mock-up and 5 tray mini-tracker tower parts from Tracker.

GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 9 I&T Overview to Start of Integration Training & Procedure Verification 6/18/04 Integration Procedures Mechanical and Electrical 6/18/04 Integration Readiness Review 7/8/04 I&T Mockup 4/1/04 LATTE v.3.0 4/1/04 I&T Plan LAT-MD /1/04 I&T Functional Test Scripts 6/1/04 MGSE Development Plan v.2 5/15/04 Drawings 5/1/04 Fabrication 6/14/04 Proof Testing 7/21/04 Receive Flight Hardware Start Integration * Final though two tower CPT, releases to support integration procedure development LATTE v.3.n V &V 5/8/04 – 7/8/04 Bldg 33 Cert 6/18/04 Particle Test Equipment 6/18/04 Training & Script Verification 6/1/04 – 7/1//04 Survey Plan 5/1/04 draft (done) 5/31/04 final Requirements LAT-MD /10/04 * Electronics Test-Bed 5/04 Subsystem Scripts 5/1/04 EGSE Hwr Deliveries 6/1/04 Electronics Test-Bed 5/04

GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 10 Electrical Ground Support Equipment (EGSE) / Online Flow Integration Readiness Review 7/8/04 LATTE v.3.0 with GASU support 4/1/04 I&T Functional Test Scripts 6/1/04 Training 6/18/04 Peer Review 6/18/04 LATTE v.3.n V &V 5/8/04 – 7/8/04 Event Pre- scaling 5/8/04 Security – Configuration Control 5/8/04 LATTE v.3.n release 5/8/04 Script / Software Configuration Control 7/8/04 Electronic Logbook / Mate- Demate Log 6/1/04 Electronics Test-Bed 5/04 Subsystem Scripts 5/1/04 EGSE Hwr Deliveries (Electronics) 6/1/04 Power Up Sequence 5/8/04 Hardware Monitoring 5/8/04

GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 11 Science Verification, Analysis, and Calibration (SVAC) - Roadmap Integration Readiness Review 7/8/04 SVAC Database and Calibration trending (March - July) SVAC Acceptance and Test of SAS Algorithms (May - July) 1 & 2 Tower Geometry (April – May) SAS Calibration Algorithms (May) SAS Database (May) SAS Pipeline Infrastructure (March - April) MC Datasets 1 & 2 tower (May) SAS Geometry Review (April) SVAC Data Pipeline (May-June) EM 1 data analysis (March - May) EM 2 data analysis (April - June) SVAC Workshops (June-July) Instrument Test Analysis (March – July)

GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 12 Critical issues I want discussed Finalization of LAT test requirements EGSE definition document needs to be completed. EGSE delivery plan. Is current schedule still OK? Time table for finalization of TKR-Grid interface and installation sequence. Tracker support for I&T mechanical model( delivery dates). –Flight cable design –Spare trays –5 th live tray